HomeMy WebLinkAboutWright Construction Engineer Corp.w
`.
OWNER - CONTRACTOR AGREEMENT
PARADISE CREEK EMERGENCY REPAIR
EMERGENCY CONTRACT
This Owner -Contractor Agreement ("Agreement") is made by and between the City of
National City, 1243 National City Boulevard National City, CA 91950 and Wright
Construction Engineering Corp. ("Contractor"), 2625 S. Santa Fe Ave, San Marcos, CA
92069, on the 24th day of April, 2024, for the construction of the above referenced
Project.
In consideration of the mutual covenants and agreements set forth herein, the Owner
and Contractor have mutually agreed as follows:
1. CONSTRUCTION
The Contractor agrees to do all the work and furnish all the labor, services, materials and
equipment necessary to construct and complete the Project in a turn -key manner in
accordance with this Agreement and all documents and plans referenced in Exhibit "A",
(hereinafter "Contract Documents"), in compliance with all relevant Federal, State of
California, County of San Diego and City of National City codes and regulations, and to the
satisfaction of the Owner.
2. CONTRACT PRICE
Owner hereby agrees to pay and the Contractor agrees to accept as full compensation for
constructing the project in accordance with these Contract Documents in an amount not
to exceed the contract price as set forth in Exhibit "B" attached hereto and incorporated
herein by reference. Payments to the Contractor shall be made in the manner described
in the Special Provisions.
3. TIME FOR PERFORMANCE
Time is of the essence for this Agreement and the Contractor shall construct the project
in every detail to a complete and turn -key fashion to the satisfaction of the Owner within
the specified duration set forth in the Special Provisions.
4. NON-DISCRIMINATION
In the performance of this Agreement, the Contractor shall not refuse or fail to hire or
employ any qualified person, or bar or discharge from employment any person, or
discriminate against any person, with respect to such person's compensation, terms,
conditions or privileges of employment because of such person's race, religious status,
sex or age.
,
5. AUTHORIZED OWNER REPRESENTATIVES
On behalf of the Owner, the Project Manager designated at the pre -construction meeting
shall be the Owner's authorized representative in the interpretation and enforcement of
all Work performed in connection with this Agreement.
6. WORKERS' COMPENSATION INSURANCE
a) By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for Workers' Compensation or to undertake self-insurance in accordance
with the provisions of that Code, and I will comply with such provisions before commencing
the performance of the Work of this Agreement.
b) The Contractor shall require each subcontractor to comply with the
requirements of Section 3700 of the Labor Code. Before commencing any Work, the
Contractor shall cause each subcontractor to execute the following certification:
"I am aware of the provisions of Section 3700 of the Labor Code, which requires
every employer to be insured against liability for worker's compensation or to
undertake self-insurance in accordance with the provisions of that Code, and I will
comply with such provisions before commencing the performance of the Work of
this Agreement."
7. ENTIRE AGREEMENT; CONFLICT
The Contract Documents comprise the entire agreement between the Owner and the
Contractor with respect to the Work. In the event of conflict between the terms of this
Agreement and the bid of the Contractor, then this Agreement shall control and nothing
herein shall be considered as an acceptance of the terms of the bid conflicting herewith.
8. MAINTENANCE OF AGREEMENT DOCUMENTATION
Contractor shall maintain all books, documents, papers, employee time sheets, accounting
records and other evidence pertaining to costs incurred and shall make such materials
available at its office at all reasonable times during the term of this Agreement and for three
(3) years from the date of final payment under this Agreement, for inspection by Owner
and copies thereof shall be furnished to Owner if requested.
9. INDEPENDENT CONTRACTOR
At all times during the term of this Agreement, Contractor shall be an independent
contractor and shall not be an employee, agent, partner or joint venturer of the Owner.
Owner shall have the right to control Contractor insofar as the results of Contractor's
services rendered pursuant to this Agreement; however, Owner shall not have the right to
control the means by which Contractor accomplishes such services.
10. LICENSES AND PERMITS
Contractor represents and declares to Owner that it has all licenses, permits, qualifications
and approvals of whatever nature which are legally required to practice its profession.
Contractor represents and warrants to Owner that Contractor shall, at its sole cost and
expense, keep in effect at all times during the term of this Agreement, any licenses, permits,
qualifications or approvals which are legally required for Contractor to practice its
profession.
11. GOVERNING LAW, VENUE
This Agreement and the Contract Documents shall be construed under and in accordance
with the laws of the State of California, and the appropriate venue for any action or
proceeding arising from this Agreement and/or the Contract Documents shall be had in the
Superior Court of San Diego, Central Branch.
12. COUNTERPARTS
This Agreement may be executed in any number of counterparts, each of which shall for all
purposes be deemed to be an original.
13. FALSE CLAIMS
Contractor acknowledges that if a false claim is submitted to the Owner, it may be
considered fraud and Contractor may be subject to criminal prosecution. Contractor
acknowledges that the False Claims Act, California Government Code sections 12650, et
seq., provides for civil penalties where a person knowingly submits a false claim to a public
entity. These provisions include within their scope false claims made with deliberate
ignorance of the false information or in reckless disregard of the truth or falsity of the
information. In the event the Owner seeks to recover penalties pursuant to the False
Claims Act, it is entitled to recover its litigation costs, including attorneys' fees. Contractor
hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from
further bidding on public contracts for a period of up to five (5) years.
I have read and understood all offtthe
�provisions of this Section 13, above:
(Initial) (Initial)
14. AGREEMENT MODIFICATION
This Agreement and the Contract Documents may not be modified orally or in any manner
other than by an amendment in writing and signed by the Owner and the Contractor.
IN WITNESS WHEREOF this Agreement is executed as of the date first written above.
Owner:
Bo t A w. i <n A- Nor- ine -
City Manager, City of National City
APPROVED AS TO FORM:
By: �
Barry1. Schultz
City Attorney
Contractor:
Wright Construction Engineering
Corp.
(Owner/Officer signature)
Wesley Wright- President
Print name and title
See Attached Corporate Resolution
(Second officer signature if a corporation)
Print name and title
09049155
Contractors City Business License No.
995153
State Contractor's License No. and Class
2625 S Santa Fe Ave.
Business street address
San Marcos, CA 92069
City, State and Zip Code
CERTIFICATE OF CORPORATE RESOLUTION
WRIGHT CONSTRUCTION ENGINEERING CORP.
I, Wesley Wright, President of Wright Construction Engineering Corp., organized and existing under the
laws of California and having its principal place of business at 3725 Trieste Dr. Carlsbad, California,
hereby certify that the following is a true copy of a resolution adopted by the Board of Directors of the
Corporation at a meeting convened and held on July S1k2014 at which a quorum was present and voting
throughout and that such resolution is now in full force"ana effect and is in accordance with the
gay D
provisions of the charter and by-laws of the Corporation. s,
1,- �11% w' 8 C� r�W rn' u r, n h" .s
I,further certify,thatthis, Corporption,is
called for by1he foregoing resolution.
DIRECTORS
President
Vice President���
Secretary
Treasurer
Witness my hand seal of this corporation on this lst day of July, 2014.
Date
Date
Date
Date
Co take the ac%& n'
r
EXHIBIT A
CONTRACT DOCUMENTS
Owner/Contractor Agreement
Exhibit B: Bid Schedule
Exhibit C: Scope of Work
Addenda
San Diego County Regional Standard Drawings
City of National City Standard Drawings
Standard Specifications for Public Works Construction and Regional Supplements
(Greenbook)
State Standard Specifications
State Standard Plans
California Building, Mechanical, Plumbing and Electrical Codes
Permits issued by jurisdictional. regulatory agencies
Electric, gas, and communications companies' specifications and standards
Sweetwater Authority specifications and standards
Specifications, standards and requirements of MTS, BNSF, SANDAG, Port of San Diego and
all other agencies that may be adjacent and/or affected by the project.
v
EXHIBIT B
CONTRACT PRICE
FOR 'I_
11
Wright Construction Engineering Corp
2625 S Santa Fe Ave.,
San Marcce, CA 92069
P:(760) 599.3915, F:(760) 599-3920
4122124
BILL TO FOR
City of National City Emergency Storm Damage Repairs
Attn: Engineering 8 Public Works Department
from January 22. 2024 Storm
1243 National City Blvd.,
National Ckv_ CA 91950
Item Derails
Units
Cluarift
Unit Price
AMOUNT
Mobillzator✓Demobilhation
LS
1
3000.00
$3,000.00
Remove Sediment from 18" RCP Diversion Pipe 8 Basin
LS
1
$7,538.92
$7,538.92
Install 1-Ton RID Rap
TN
415
$140.00
sm.100.00
Excavate 8 Re it Channel Bottom from 1122124 Storm
LS
1
S7.361.138
S7.361.08
Pump Out Standing Storm Water in Creek
LS
1
$1.6DO.00
$1,15M.00
Excavate B Compact Slopes Damaged from 1/22/24 Storm
ILS
it
$16,400.00
$16,400.00
OTHER
.00
$0.00
TOTAL
94 000.00
EXHIBIT C
SCOPE OF WORK
The scope of work is to repair the damaged slope along the upstream portion of Paradise
Creek along Paradise Valley Rd from Plaza Blvd to the eastern National City Limit. The scope
of work includes excavation and compaction to repair the damaged slopes, installing filter
fabric, filter blanket, and rip rap along the channel, removal of sediment from the 18" RCP
diversion pipe at the biofiltration basin along the creek, minor excavation to repair the
channel bottom, and pumping out ponded water within the channel at the culvert inlet.
CORPORATE CERTIFICATE
1, Wesley Wright certify that I am the Secretary of the
Corporation named as Contractor in the foregoing Contract; that
Wesley Wright , who signed said contract on behalf of the
Contractor, was then President of said
Corporation; that said contract was duly signed for and in behalf of said Corporation by
authority of its governing body and is within the scope of its corporate powers.
1, Wesley Wright certify that I am the Secretary of the
Corporation named as Contractor in the foregoing Contract; that
Wesley Wright who signed said contract on behalf of the
Contractor, was then President of said
Corporation; that said contract was duly signed for and in behalf of said Corporation by
authority of its governing body and is within the scope of its corporate powers.
Corporate Seal: