Loading...
HomeMy WebLinkAboutProject Professionals Corporation CIP 23-06 Change Order No. 23242q mR 3 q P 2: 03 ;;'ilOFjALCITY To: Stephen Manganiello, PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM April S, 2024 Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Randy Garcia Project Manager Project Professionals Corporation Project: Kimball Park Dog Park and Tot Lot+ Las Palmas Park Dog Park CIP No.: 23-06 Subject: Change Order No. 23 Change Order No. 23 provides for: Infill of soil along sidewalk at Kimball Park. Payment for this change order was determined by force account. Supporting Information: The revisions to plan sheet L2.1 provided by Jim Neri, the Landscape Architect, on August 16, 2023, modified the limits of the dog park on the north end of the park. The new fencing limits created a grade difference between the curb beneath the fence and the adjacent soil outside the dog park. Following the punch walk held on December 4, 2023, the Contractor was directed by Jim Neri to infll the soil along the sidewalk to V below the finished surface of the concrete. Excess soil material from Las Palmas Park was approved by PPC for placement as backfill material at Kimball Park. Time Adiustment: Zero (0) working days are to be added to the contract. Cost Adiustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of $1,556.78. The cost for this work was determined by force account. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. 04.05.24 Project Manager Date +- GAi,IR011,MIA r �RCORAOBA'ti0� KIMBALL PARK DOG PARK AND TOT LOT+ LAS PALMAS PARK DOG PARK CHANGE ORDER NO.23 CIP NO.23-06 March 28, 2024 Contractor: HSCC, Inc 12101 Lakeside Ave Lakeside, CA 92040 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are to be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor proceeded with Infill of soil along the sidewalk at Kimball Park. The additional work includes but is not limited to transporting soil from Las Palmas Park to Kimball Park, infilling soil along the sidewalk and compacting the soil. The total amount for all labor, material, equipment and all other associated work is $1,SS6.78. Recommended by Project Manager: a...e.� Date: 04.05.24 By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Leah Mayfield.' Date: 4/4/24 (print Name and Title) Approved by Project Coordinator: r`_ ( Date: p¢/» /' Approved by Assistant Director of E(& PW: `�/1�,t '�>W-� Date: S J Approved by City Engineer: , Date: J-12112 Y Approved by City Manager: Date: (Required for change orders $25,000 and above) + CALIFORNIA ^ NALTI0�nn1A� CCITg (jIlvCORFORAT 1) KIMBALL PARK DOG PARK AND TOT LOT+ LAS PALMAS PARK DOG PARK CHANGE ORDER NO. 23 CIP NO. 23-06 DATE: March 28, 2024 WORK PERFORMED BY: HSCCInc. DESCRIPTION OF WORK: Soil infill along sidewalk at Kimball Park ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT _—_u'�.. eti- Unit Qtv Wage Total 1) Cement mason HR 6.00 74.35 446.10 2) Cement mason HR 6.00 74.35 446.10 Sub -Total Labor: $ 892.20 Labor Burden(30%): $ 267.66 Labor Markup(20%): $ 178.44 TOTAL LABOR: EQUIPMENT Unit QtV Rate Total 1) Skid steer HR 1.00 35.36 35.36 2) Dump trailer HR 2.00 33.00 66.00 3) Crew truck HR 2.00 37.61 75.22 Sub -Total Equipment: $ 176.58 Equipment Markup (15%): $ 26.49 TOTALEQUIPMENT: $ 203.07 SUBTOTAL: $ 1,541.37 BOND PREMIUM (1%): $ 25.41 GRAND TOTAL: $ 1,556.78