HomeMy WebLinkAboutProject Professionals Corporation - Police Pistol Range HVAC and Safety Improvements - CIP No. 20-05 - Change Order No. 8 - 20242029 OCT - 3 P 3- 11
PROJECT PROFESSIONALS CORPORATION
G! T i' OF rtAi 10HAL CITY
CHANGE ORDER MEMORANDUM
October 3, 2024
To Stephen Manganiello,
Director of Engineering & Public Works/City Engineer
Engmeenng and Public Works Department
City of National City
From Randy Garcia
Project Manager
Project Professionals Corporation
Project Police Pistol Range HVAC and Safety Improvements
CIP No 20-05
Subject Change Order No 8
Change Order No 8 provides for
The deletion of Contract additive bid line item #2
Payment for this change order was agreed upon at a lump sum pnce
Supporting Information
The City and Contractor agreed that 24-hour fire watch was not needed for the scope of work in this project
Time Adlustment
Zero (0) worlang days are to be added to the contract
Cost AdJustment
The total deduction for this change in the scope of work has been agreed upon at a lump sum price of ($4,800 00)
Each line item was paid in full and the deduction was as a lump sum on this change order
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable The
supporting documentation is on file with the project records
10 03 24
Project Manager Date
_ CALIF,ORKIA
POLICE PISTOL RANGE HVAC AND SAFETY IMPROVEMENTS CHANGE ORDER NO.8
CIP NO.20-05 September 6, 2024
Contractor Southwest Construction Services
11653 Riverside Dr Ste 153
Lakeside, CA 92040
This Change Order modifies Contractor's and the Citys obligations and rights under the abovementioned
contract This change order is not effective until approved by the City.
Time adjustment:
Zero (0) working days are to be added to the contract
cost of Charlste Order
The City and the Contractor agree to the deletion of bid line item #2 "Provide daily rate for as -needed
24-hour fire watch if dampers connected to alarm system or sprinklers need to be removed, replaced or
adjusted See additional description of fire watch requirements in the specifications. Note, this item will
used under a change of notice if services are required and the duration will be determined in
coordination with the contractor, the construction manager and the city " The total deduction for all
labor, material, equipment and all other associated work is ($4,800.00).
Recommended by Project Manager �i�""'.�,
Date 00324
By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc and that there will be no further compensation All of the terms and conditions of the
original contract documents are incorporated herein The signer for the Contractor confirms that he/she is
authonzed to bind the Contractor to this Change Order
Agreed and Accepted by Contractor
J
Date
(Pnn t Nana and Title)
Approved by Project Coordinator �i �j�
date I 0'f L1202_-�
Approved by Assistant Director of E & PW.
Date (
Approved by City Engineer
Date 1 (? ef
Approved by City Manager
Date
(Required for change orders $25,000 and above)
h
CCA� IFAORN'IA'—'-F
POLICE PISTOL RANGE HVAC AND SAFETY IMPROVEMENTS CHANGE ORDER NO.8
CIP NO 20-05
DATE -September 6,2024
WORK PERFORMED BY Southwest Construction Services Inc
DESCRIPTION OF WORK. Line itern adjustment
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Urdt Qty Rate Total
Provide daily rate for as -needed 24hour
fire watch if dampers connected to alarm
system or sprinklers need to be removed,
replaced or adjusted Seeadditional
description of fire watch requirements in
2) the speaflcations Note this item will be LS (1 00) 4,800 00 (4AW 00)
used under change notice if services are
required and the duratwn wdl be
determined m coorduatron with the
contractor, the crostructim manager and
Sub-Totah I $ (4,800 00
TOTALADIUSTMENTS.
GRAND TOTAL: 4,800