HomeMy WebLinkAboutProject Professionals Corporation Police Pistol Range HVAC and Safety Improvements CIP No. 20-05 Change Order No. 7 - 20241- r -'S PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM August 29, 2024 To Stephen Manganiello, Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From Randy Garcia Project Manager Project Professionals Corporation Project Police Pistol Range HVAC and Safety Improvements CIP No 20-05 Subject Change Order No 7 Change Order No 7 provides for The SDG&E service outage request and fee Payment for this change order was determined by force account Vq 4UG 2 9 P � i, 8 CI I y Or NATIONAL CITY Supporting Information During installation of the subpanel A within the electrical room, the Contractor identified the need for coordination with SDG&E for the electrical shutdown The existing switchgear had four existing fuse panels installed As per California Electrical Code, the switchgear is not required to have a City owned shutoff for power on any gear that has less than 6 switch panels This Change Order provides for the service outage fee as well as the site labor required for onsite coordination during the shutdown Time Adjustment Zero (0) worlang days are to be added to the contract Cost Adjustment The additional cost for this change in the scope of work has been agreed upon at a lump sum price of $5,200 28. The cost for this work was determined by force account The pay method and amount have been reviewed by the Project Manager and'are considered fair and reasonable The supporting documentation is on file with the project records 82924 Project Manager Date f cLugoR�ai� POLICE PISTOL RANGE HVAC AND SAFETY IMPROVEMENTS CHANGE ORDER NO.7 CIP NO.20-M - August C 2024 Contractor Southwest Construction Services 11653 Riverside Dr Ste.153 Lakeside, CA 92040 This Change Order modifies Contractor's and the Cays obligations and rights under the abovementioned contract This change order Is not effective until approved by the City. Time adiusUr—&M Zero (0) woridrig days are to be added to the contract. Cost of Chance Order The City and the Contractor agree that the Contractor proceeded with coordinating the electrical shutdown with SDG&E The additional work includes but is not limited to requesting, coordinating, and meeting with SDG&E for the service outage The total amount for all labor, material, equipment and all other associated work is $5,2002L Recommended by Project Manager \�� `' Date 8 29 24 By signing this Change Order the Contractor coriflnns that he/she is completely familiar with and has fairly If this Change Order Is approved, Contractor will provide all of the negotiated its price, terms and conditions. equipment, materials and labor necessary to provide a complete work as described above at that the price that the is fair and complete and represents all costs associated wrth stated herein Contractor confirms price the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, etc and that there will be no further compensation All of the terms and conditions of the insurance, profit, original contract documents are incorporated herein The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Agreed and Accepted by tractor Date a �� (Print Name and Tale) Approved by Project Coordinator Date 5 Approved by Assistant Director of E & PW Date Approved by City Engineer Date Approved by Crty Manager. Date (Requked for change orders $25AM and above)