HomeMy WebLinkAboutProject Professionals Corporation Police Pistol Range HVAC and Safety Improvements CIP No. 20-05 Change Order No. 6 - 2024PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM July 25, 2024 To Stephen Manganiello, Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From Randy Garcia Project Manager Project Professionals Corporation Project Police Pistol Range HVAC and Safety Improvements CIP No 20-05 Subject Change Order No 6 Change Order No 6 provides for Procurement and installation of 600V, 30A, time delay fuses within the existing fused switch Payment for this change order was determined by force account ? JUG 2S P 00 Supporting Information While investigating the existing sw tchgear within the mechanical room for the electncal shutdown, the Contractor identified wire jumpers within one of the existing fuse panels As per the RFI #11 response, the Contractor was directed by the City to replace wire jumpers with the appropriate time delay fuses During the electrical shutdown the Contractor investigated the remaining panels and did not identify any additional wire jumpers that needed to be replaced Time Adjustment Zero (0) worlang days are to be added to the contract Cost Adjustment The additional cost for this change in the scope of work has been agreed upon at a lump sum price of $412 40 The cost for this work was determined by force account The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable The supporting documentation is on file with the project records 1072524 Project Manager Date CALIFORNIA -� NXTIONALary 4 - oi►coaPOIL �a POLICE PISTOL RANGE HVAC AND SAFETY IMPROVEMENTS CHANGE jORDERly 4O. 6 CIP NO.20-05 Contractor Southwest Construction Services 116S3 Riverside Dr Ste 153 Lakeside, CA 92040 This Change Order modifies Contractor's and the City's obligations and rights under the abovement►oned contract This change order is not effective until approved by the C.ftV. Time adlustment• Zero (0) worlong days are to be added to the contract Cost of Change Order The City and the Contractor agree that the Contractor proceeded under force account with installing 60OV, 30A, time delay fuses in the existing fused switch The additional work includes but is not limited to procuring the fuses, removing and disposing of the existing wire jumpers, and installing the time delay fuses in the existing switches The total amount for all labor, material, equipment and all other associated work is $412 40. Recommended by Project Manager \��� "".�� Date 07 25 24 By signing this Change Order the Contractor confirms that he/she is completely famdiar vAth and has fairly If this Change Order is approved, Contractor will provide all of the negotiated its price, terms and conditions equipment, materials and labor necessary to provide a complete work as described above at that the price Contractor that the price is fair and complete and represents all costs associated Ndth stated herein confirms the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, that there will be no further compensation All of the terms and conditions of the insurance, profit, etc and original contract documents are incorporated herein The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order Agreed and AccepW by Con or• - Date 1 (Pnnt Name and Title) �r16Y\ Approved by Project Coordinator ,lo Date Og f Z/Zo2� Approved by Assistant Director of E & PW Date S Approved by City Engineer , Date' Approved by City Manager Date. (Regiflred for change orders $25,000 and above) -o-- CALIFORNIA .-*- TIO L CT" an�r 721TC08POR.6.'rEn POLICE PISTOL RANGE HVAC AND SAFETY IMPROVEMENTS CHANGE ORDER NO.6 CI P NO 20-05 DATE June 20, 2024 WORK PERFORMED BY Satum Electrx DESCRIPT10NOFWORK Provide and Install 60OV,30A, time delay fuses inexisting fused switch ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR -SUBCONTRACTOR Unit Qty Rabe Total 1) Foreman HR 100 8909 8909 Sub -Total Labor: $ 8909 Labor Markup (ZD%): $ 1782 TOTAL SUBCONTRACTORLABOR. $ MATERIALS -SUBCONTRACTOR Urdt ft I Rabe Total 1) 600V, 30A fuses LS 1 00 22600 22600 2) Sales tax LS 1 00 1752 1752 Sul�Total Matermis. $ 24352 Materials Markup (159Q: $ 36 53 TOTAL SUBCONTRACTOR MATERIALS: 106.91 SUB-TOTALSUBCDNTRACTOR: $ 386.96 PRIME CONTRACTOR MARKUP 5% $ 1&SS Bond (1 S%): $ &09 GRAND TOTAL' $ 412.40 4DI 1653 RivmKlc Dr Ste 153 I.Wwm&, CA 92040 P-619-258-9944 F-619-258-9946 be # 96n47 TITLE: Install Fuses in E)asbng Bucket PROPOSED CHANGE ORDER NO. * it (o PROJECT: Police Pistol Range WAC & Safety TI DATE: 07/17/2024 JOB: 22-M CONTRACTIPO: 20-06 TO, Attn Crty of National City 1243 National City Blvd SUBMITTED: Nabonal City, CA 91950 COMPLETED: Phone 1-619-336 4585 Fax 1-619-3364397 REQUIRED: DESCRIPTION Installabon of Fuses in Emstrng Bucket to replace unacceptable Wre Jumpers as requested Nun Item Destxrpbon Ref Qty Und Unit Price Amount 1 Satum Satum #12760 APP ROY Brian Bmwn Date: 07AMA2 a 1 000 5% O&P on Sub Cost 1.5% Bond 38898 38598 $386 96 $19 35 $610 $412 41 OATURN CHANGE ORDER PROPOSAL Job Nanw and Address' Police Pistol Range HVAC & Safety Improv 12W National City Blvd Deso option of Change. Provide and install 600V, 30A, Time delay fuses In e)dstrng fused switch Date 6/27/2024 Saturn Job #- 777 Change Order #. SAT-01 Project Manager Bob Dudek MATERIAL 1 Material $226 00 2. Sales Tax 7 75% of Line 1 $ 1752 3 Total Materfal Charge LABOR 4 ElecMwn Hrs. @ $86 00 S - 5 Foreman 1 irs @ $89 09 $ 89 09 6 General Foreman Hrs. $ - 7 Project Manager Hrs $ - & Subtotal (Lines 4, 5, 6 & 7) $ 8909 9 Overtime Premium average rate x 15 Hrs. $ ' 10 Total Labot Coat $ 11 Labor Burden 6296 of Line 8 12 Cartage & Handling 3916 of Lme 1 13 Ependables 4% of Line 8 $ - 14 Permits 15. Small Tools 4% of Line 8 16 Large Tools & Equipment Rentals 17 Total Expenses $ SUBCONTRACTS AND ONINEERING 18 Engineering, Drafting & Design 19 Subcontracts 20 Total Subcontrects/Engineenng S OVERHEAD & PROFIT 21- Subtotet of Lines.T&i 17(Materials, Tools Egwpment) $243 52 , 2Z Overhead Wee ` 15% of Line 21, $36 53 23. Subtotal oftim 10 jtaborj $8909 24 Overhead & Fee 20% of Line 23 $17 82 25 Subtotal 96 26 , Su600rd , np*enng Map _ 5% of Lirw-20 $ 27 Total Overtbead &Profit (Lines 22+U1 $54 35 BOND& FA SC UAMEOMCn515 2& 29 Bond Rabe 150% of UnE 28 $ 30 31. 32 , Total Bond dt (Llpias 29.30 &31) $ Total Cost P""wd fdiar�e; jSuaa opines 3, tA,17, flk 27) $ 4V�4kt� �ATURN electric 7552Trade Street • San Diego, CA 92121 85&-271-4100 KI 2 12760 License No. 219097 �-� DAILY LABOR AND MATERIAL VOUCHER �o JOB ,IOg 7--Po NO DATE THE AUTHORIZED BY DOES HEREBY AUTHORIZE SATURN ELECTRIC MC TO PROVIDE AND CHARGE FOR THE LABOR, MATERIAL AND OTHER EXPENSE8 LWED HEREIN - - DESCRI ON OF WORK r sw -- TOTAL :.• - BUSSMANN Fuse Reducer. H/K,100 A Max. Amps, 600V AC, 31 to 60 A, Nonrejection w`} Fits Fuse Block I'e+ri 6F452 Mfr Model NO 616 s4�" -f . y " Product Image Feedback 'Compare Pmduct Details Catalog Page 179 Brand 8MMANN Max Amps 100 A Ma., Voltage 600V AC For Fuse Class H, K Standards CSA CwUW (CLR47235 . UL Listed (E12853) UNSPSC 39121617 Gountry of Ongln Necdco (su6pt to drange) PfodL'ct Description Fuse reducers adapt bwer4ated fuses to fit higher -rated fuse bJwk% fuse holders, and fused di SMVv ct sw tches. nwjy a used on fuses of the same class and voltage when swttctung from higher amperage to kmw amperage ratings These reducers marntein a sUmV decUical contact to help ensure proper fuse operation r� Product DetadC Feedback Vjeb Price 1 $54.60 11 * Ship Pickup Expected to wr<ve Tue. Jun 18 Sh;p to 92101 � Change Shipping Weight 0.15 bs Strip Avadab(hty Terms Add to Lwt (sm Busann Class H, J, K & R Fuse LE-t, Reducers Data Sheet Eaton Bussrnam Fuse Reducer Catalog WTV, 2 29 PM 1 Cooper Buearnem 30 Amp 8ODW Duid EWravt CWm RKS Fuse FRS-R-30 - The Nome Depot Hover image t0 Zoom $21.00 • Fuse opens to disconnect an eleotrc ] arced Crafted with brass end cps and a fberghw tube for duraulity • Suitable for currenNowtog spplicabws View More Details Mom Mena Stare ✓ 8 in stock Aisle 06, Bay 001 L� IL.. n .... . - — . . . w . r .. .-. .- - --- - -- —