Loading...
HomeMy WebLinkAboutInnovative Construction Consulting Services, LLC. - Eastside I-805 Community Greenbelt - CIP No. 22-09 - Change Order No. 15 - 2024 w Innovative Construction Consulting Services, LLC (c. P.O. Box 6211 Norco CA 92860 Phone (951) 532-6483 Lic. # 671810 sgi11@iccsinc.net CHANGE ORDER MEMORANDUM November 5,2024 To: Ricardo Rodriquez National City Engineering and Public Works Department City of National City From: Sean Gill Project: Eastside 1-805 Community Greenbelt CIP No.: 22-09 Subject: Change Order No.15 Change Order No.15 provides for: The city has directed the contractor to install additional scope as identified on the attached exhibits including approximately 13,400 SF of 1"asphalt overlay @ $1.38 per SF, 16,425 SF of 3"AC/6"Class II base @ $4.58 per SF,400 LF of asphalt dike @ $43.75 per SF, 2-ea 36" box trees @ $2,000 each, 109-ea 5-gallon shrubs @ $55 each, 270-ea 1 gallon shrubs @ $22 each, irrigation for added landscape @ $55,000,and the information kiosk @ $25,836.This work will beautify and extend the walking pathway from the Eastside 1-805 multi-use trail.All work shall be completed no later than December 31,2024,to comply with the Eastside 1-805 grant restriction.This added work has been authorized at the agreed price listed below. This change order is not effective until approved by the City. Payment for this change order will be at a lump sum price identified. Supporting Information: The El Toyon plans included work that would satisfy the Eastside 1-805 grant requirements. Since the El Toyon budget was challenged and grant funding capacity was available on the Eastside 1-805 project,it only made sisnce to move this work into the Eastside 1-805 project. The same unit prices for El Toyon were honored for this work. Time Adjustment: Zero(0)contract days were added to the contract time to coordinate the work. Cost Adjustment: The pay method and amount have been reviewed by ICCS and are considered fair and reasonable.The supporting documentation is on file with the project records. 11/05/24 7:4,e.........„41...e Pr ject Manager Date *-cA1.1 ORNIA -* NATIONAL Car rNCORPOA ATE Eastside I-805Community Greenbelt CHANGE ORDER NO. 15 CIP NO. 22-09 October 24,2024 Contractor: Dick Miller Inc. The City has directed the contractor to install additional scope as identified on the attached exhibits including approximately 13,400 SF of 1"asphalt overlay @$1.38 per SF, 16,425 SF of 3"AC/6"Class II base @ $4.58 per SF,400 LF of asphalt dike @ $43.75 per SF, , 2-ea 36" box trees @ $2,000 each, 109-ea 5 gallon shrubs @ $55 each, 270-ea 1 gallon shrubs @$22 each, irrigation for added landscape @ $55,000,and the informational kiosk @ $25,836. This work will beautify and extend the walking pathway from the Eastside I-805 multi-use trial. All work shall be completed no later than December 31, 2024 to comply to the Eastside 1-805 grant restriction. This added work has been authorized at the agreed price listed below. This Change Order modifies the Contractor's and the City's obligations and rights under the above-mentioned contract. This change order is not effective until approved by the City. Time adjustment: No(0)working days have been added to the contract time to complete the additional work Identified. Cost of Change Order: There is a cost increase to the original contract amount. $207,969.05 se.„........x4g Recommended by Project Manager:Sean Gill Date: 10/25/24. By signing this Change Order, the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: ;54 ^ af% CA. Date: t 01Z V2oz/ (Dick Miller Inc.) Approved by Project Coordinator: r. yj_/ Date: ,>/;7/27,I Approved by Assistant Director of E&PW; r` ( , _Date: t / /':2ii. I Approved by City Engineer: „„/7,L,,� Date: fl /,A.y Approved by City Manager: �r//(( 1 / Date- (Required for change orders$25,000 and above) CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) Date: 1-29-25 Engineering/Public Works From(Dept.): Tirza Gonzales Submitted by(First&Last Name): Various Construction Change Orders Vendor: Resolution: YES / NO 0 0 Resolution No.(if applicable): 1 2 3 4 Originals Provided to City Clerk(Select Quantity) 000 Department has Copy/Duplicate Original Vendor has Copy/Duplicate Original Submitted Originals to City Clerk's office:CIP 22-09 Change Orders 9,15