HomeMy WebLinkAboutPC Reso 2017-13 - 341 East 30th StreetRESOLUTION NO. 2017-13
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF NATIONAL CITY, CALIFORNIA,
Item no. 7
May 15,2017
APPROVING A TENTATIVE SUBDIVISION MAP FOR A MIXED-USE CONDOMINIUM
PROJECT TO BE LOCATED AT 341 EAST 30TH STREET.
CASE FILE NO. 2016-23 S
APN : 562-190-32
WHEREAS, the Planning Commission of the City of National City considered a
Tentative Subdivision Map for a mixed-use condominium project to be located at 341
East 3oth Street at a duly advertised public hearing held on May 15, 2017, at which time
oral and documentary evidence was presented; and,
WHEREAS, at said public hearings the Planning Commission considered the
staff report contained in Case File No. 2016-23 S maintained by the City and
incorporated herein by reference along with evidence and testimony at said hearing;
and · . '
WHEREAS, this action is taken pursuant to all applicable procedures required by
State law and City taw; and,
WHEREAS, the action recited herein is found to be essential for the preservation
of public health, safety, and general welfare.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of National City, California, that the testimony and evidence presented to the Planning
Commission at the public hearing held on May 15, 2017, support the following findings :
1. The proposed map is consistent with the National City General Plan and applicable
specific plans, because the project is in compliance with all required density and
floor area maximums; provides additional home and business ownership
opportunities, consistent with the General Plan and Housing Element; and meets
all requirements of the Subdivision Ordinance (NCMC Title 17), including minimum
lot size and dimension.
2. The site is physically suitable for the proposed type of development, because the
12,500 square-foot lot can accommodate the requested number of units within the
limits for density and floor area established by the General Plan and Land Use
Code.
Planning Commission
Meeting of May 15, 2017
Page2
3. The site is physically suitable for the proposed density of development, because the
proposed multi-family residential development, at a density of 41 units per acre, is
less than the 48 units per acre allowed in the Minor Mixed-Use Corridor (MXC-1)
zone, and the proposed infill development increases the available housing units in
the City.
4. The design of the subdivision or the proposed improvements is not likely to cause
substantial environmental damage or substantially and avoidably injure fish or
wildlife or their habitat, because there is no natural habitat in the area or bodies of
water present on-site . In addition, the property is surrounded by urban development
and is currently developed with a residential use.
5. The design of the subdivision and the proposed/required improvements are not likely
to cause serious public health problems, because the property is currently
developed and surrounded by existing residential developrr.ents. In addition, the
land use and zoning designations allow for the density requested, which was
analyzed as part of the environmental document associated with the most recent
land use update.
6. The design of the subdivision and the proposed/required improvements will not
conflict with easements, acquired by the public at large, for access through or use of
the property within the proposed subdivision, because no such easements would be
affected by the proposed development.
7 . The discharge of sewe rage waste from the subdivision into the City of National City
sewer system will not result in violation of existing requirements prescribed by the
California Regional c;luality Control Board pursuant to Division 7 (commencing with
Section 13000) of the Water Code, as specified by Government Code Section
66474.6, because the project is required to install and/or upgrade to current
requirements for sewage disposal by the Conditions of Approval of this permit.
8. T he subdivision has been considered by the Planning Commis$ion with regard to its
effect on the housing needs of the region, and these needs are balanced by the
public service needs of the residents and available fiscal and environmental
resources, ~cause the project will provide eleven new homeownership
opportunities, which is consistent with and encouraged by the City's Housing
Element.
Planning Commission
Meeting of May 15, 2017
Page3
9. The design of the subdivision provides, to the extent feasible, for future passive and
natural heating and cooling opportunities in the subdivision , based on consideration
of local climate, topography, property configuration and other design and
improvement requirements without requiring reduction in allowable density or lot
coverage , because the existing property is already developed and the site is
surrounded by existing residential development. All new construction proposed in
the future will be in compliance with the California Building Code, which takes such
factors in to consideration .
10. That the proposed project has been reviewed in compliance with the California
Environmental Quality Act, because staff has determined the proposed use to be
categorically exempt from environmental review pursuant to Class 32 Section
15332 (In-Fill Development Projects), for which a Notice of Exemption will be filed
subsequent to approval of this Tentative Subdivision Map.
BE IT FURTHER RESOLVED that the application for Conditional Use Permit is
approved subject to the following conditions :
General
1. This Tentative Subdivision Map authorizes a 12-unit mixed-use condominium project
located at 341 East 30th Street. Except as required by conditions of approval, all
plans submitted for permits associated with the project shaii conform to Exhibits A-
Revised and B-Revised , Case File No . 2016-23 S, dated 3/1612017).
2. Before this Tentative Subdivision Map shall become effective, the applicant and the
property owner both shall sign and have notarized an Acceptance Form, provided by
the Planning DeparlfT'Ient, acknowledging and accepting all conditions imposed upon
the approval of this permit. Failure to return the signed and notarized Acceptance
Form within 30 days of its receipt shall automatically terminate the Tentative
Subdivision Map. The applicant shall also submit evidence to the satisfaction of the
Planning Department that a Notice of Restriction on Real Property is recorded with the
County Recorder. The applicant shall pay necessary recording fees to the County.
The Notice of Restriction shall provide information that conditions imposed by
approval of the Tentative Subdivision Map are binding on all present or future interest
holders or estate holders of the property. The Notice of Restriction shall be approved
as to form by the City Attorney and signed by the City Manager or assign prior to
recordation.
3. Within four (4) days of approval, pursuant to Fish and Game Code 711 .4 and the
California Code of Regulations, Title 14, Section 753.5 , the applicant shall pay all
necessary environmental filing fees for the San Diego County Clerk. Checks shall be
made payable to the County Clerk.
Planning Commission
Meeting of May 15, 2017
Page4
4 . This permit shall become null and void if not exercised within one year after adoption
of the resolution of approval unless extended according to procedures specified in
Section 18.12.040 of the Municipal Code.
Building
5. Plans submitted for improvements must comply with the current editions of the
California Building, Electrical, Plumbing, Mechanical, and Fire Codes.
Engineering
6 . A Hydrology study (1 00 year flood} is required for the new project. The study should
consider the proposed project area to the closest municipal storm drain collection
point. The study should consider the adequacy of the existing storm drain system to
convey any additional run off. All Hydrology study findings and recommendations
are part of Engineering Department requirements.
7. The Priority Project Applicability checklist for the National Pollutant Discharge
Elimination System (NPDES) is required to be completed and submitted to the
Engineering Department. The checklist will ·be required when a project site is
submitted for review of the City Departments. The checklist js available at the
Engineering Department. If it is determined that the project is subject to the "Priority
Project Permanent Storm Water BMP Requirements" and the City of National City
Storm Water Best Management Practices of the Jurisdictional Urban Runoff
Management Program (JURMP} approved Standard Urban Storm Water Mitigation
·Plan (SUSMP} documentation will be required prior to issuance of an applicable
engineering permit. The SUSMP shall be prepared by a Registered Civil Engineer.
8. The Best Management Practices (BMPs) for the maintenance of the proposed
construction shall be undertaken in ·accordance with the National Pollutant
Discharge Elimination System (NPDES) regulations which may require a Storm
Water Pollution Prevention Plan (SWPPP) for the project. An approved SWPPP will
be required prior to issuing of a construction permit.
9. All surface run~off shall be treated with an approved Standard Urban Runoff
Mitigation Plan (SUSMP) Best Management Practice (BMP} for all Priority SUSMP
projects. No runoff will be permitted to flow over the sidewalk. Adjacent properties
shall be protected from surface run-off resulting from this development.
10. The property owner, or its successors and assigns shall be responsible for the
maintenance, repair, or reconstruction of all irrigation and landscaping
improvements installed within the public right-of-way. Sprinkler heads shall be
adjusted so as to prevent overspray upon the public sidewalk or the street. The
proposed sprinkler heads shall be installed behind the sidewalk, and the irrigation
mainline upon private property only, as required by the City. The property owner or,
its successors or assigns, shall be remove and relocate all irrigation items from the
public right-of-way at no cost to the City, and within a reasonable time frame upon a
written notification by the City Engineer.
Planning Commission
Meeting of May 15, 2017
PageS
11. Metallic identification tape shall be placed between the bottom layer of the finished
surface and the top of all irrigation lines in the public right-of-way .
12 .A grading and drainage plan shall be submitted showing all of the proposed and
existing on-site and off-site improvements. The plan shall be prepared in
accordance with the City's standard requirements by a Registered Civil Engineer. All
necessary measures for prevention of storm water pollution and hazardous material
run-off to the public storm drain system from the proposed parking lot or
development shall be implemented with the design of the grading . This shall include
the provision of such devices as storm drain interceptors, cla.rifiers, or filters. Best
Management Practices for the maintenance of the parking lot, including sampling,
monitoring, and cleaning of private catch basins and storm drains, shall be
undertaken in accordance with the National Pollution Discharge Elimination System
(NPDES) regulations. A private storm water treatment maintenance agreement shall
be signed and recorded. A check list for preparation of the grading plan/drainage
plan is available at the Engineering Department.
13.AII existing and proposed curb inlet on property shall be provided with a "No
Dumping " signage in accordance with the NPDES program.
14.A sewer permit will be required. The method of sewage collection and disposal shall
be shown on the grading/drainage plan. Any new sewer lateral in the City right-of-
way shall be 6 inch in size with a clean qut. A sewer stamp "S" shall be provided on
the curb to mark the location of the lateral.
15. Separate street and sewer plans prepared by Registered Civil Engineer, shall be
submitted showing a!! of the existing and proposed improvements. The plans shall
be in accordance with City requirements.
16.A soils engineering report shall be submitted for the Engineering Department's
review, after Planning Commission approval. The report shall address the stability of
all of the existing and proposed slopes on the property. It snail also address the
adequacy of the building pads, the criteria for any new retaining wall design, the
maximum allowable soil bearing pressure and the required pavement structural
sections for the proposed streets, the parking areas, and the driveways. As a
minimum , the parking lot pavement sections shail be 2 inch A. C. over 4 inch Class n·
aggregate base. The street pavement sections shall be in accordance with National
City modified Standard Drawing G-34 . All soils report findings and recommendations
shall be part of the Engineering Department requirements.
17. The deteriorated portions of the existing street improvements along the property
frontages shall be removed and replaced.
18. The existing pedestrian ramp on the northwest corner at the intersection of "D"
Avenue and 30th Street shall be removed and replaced with standard ramp
complying with the ADA requirements and the Regional Standard Drawings.
19. The existing street improvements along the property frontage(s) shall be kept free
from weed growth by the use of special weed killers , or other approved methods.
Planning Commission
Meeting of May 15~ 2017
PageS
20. All existing survey monuments~ including any benchmark, within the boundaries of
the project shall be shown on the plans. If disturbed, a licensed land surveyor or
civil engineer shall restore them after completion of the work. A Corner Record shall
be filed with the County of San Diego Recorder. A copy of the documents filed shall
be given to the City of National City Engineering Department as soon as filed.
21. A permit shall be obtained from the Engineering Department for all improvement
work within the public right-of-way, and any grading construction on private property.
22. Street improvements shall be in accordance with the City Standards. All missing
street improvements shall be constructed. Abandoned driveway aprons shall be
replaced with curb, gutter, and sidewalks.
23. A title report shall be submitted to the Engineering Department, after the Planning
Commission approval, for review of all existing easements and the ownership at the
property.
24.AII new dwellings are subject to a· Transportation Development Impact Fee. This
includes new homes, condos and apartments.
25.AII electrical, telephone and similar distribution service wires for the new structure(s)
shall be placed underground.
26.A cost estimate for all of the proposed grading, drainage, street improvements,
landscaping and retaining wall work shall be submitted with the plans. A
performance bond equal to the approved cost estimate shall be posted. Three
percent (3%) of the estimated cost shall also be deposited with the City as an initial
cost for plan checking and inspection services at the time the plans are submitted.
The deposit is subject to adjustment according to actual worked hours and
consultant services.
27. A hydromodification plan or a letter sealed and signed by the Engineer of Work
explaining why the project is exempt from hydromodification requirements shall be
submitted.
28. The final parcel map shall meet all of the requirements of the Subdivision Map Act,
and the City of National City Municipal Codes including certification,
acknowledgement, complete boundary information and monumentation.
29. The deveiQper shall submit to the Fire Department a letter from Sweetwater
Authority stating existing fire flow. if determined by ihe Fire Department that
additional improvements are needed , the developer shall enter into an agreement
for the water improvements with the Sweetwater Authority prior to obtaining the final
map approval.
30. Separate water and sewer laterals shall be provided to each lot/parcel.
31. The developer shall bond for the monumentation, the public improvements and the
on-site grading, drainage, landscaping, and other improvements through an
agreement with the City prior to the approval of the final map.
Planning Commission
Meeting of May 15, 2017
Page7
32. SUSMP documentation must be submitted and approved.
33. The final map shall be recorded prior to issuance of any building permit.
34 .AII new property line survey monuments shall be set on private property, unless
otherwise approved.
35. The parcel map/final map shall use the California Coordinate System for its "Basis
of Bearings" and express all measured and calculated bearings in terms of the
system. The angle of grid divergence from a true meridian and the north point shall
appear on the map. Two measured ties from the boundary of the property to
existing horizontal control stations shall be shown.
Fire
36. Plans submitted for improvements must comply with the current editions of the
California Fire Code (CFC) and National Fire Protection Association (NFPA).
37. Fire Sprinkler, Fire Alarm, Fire Protection Systems and Fire Underground plans are
to be directly submitted to the National City Fire Department under separate permit
for review and permitting. Fees along with 3 sets of plans including all "Cut Sheets
and Calculations" shall be included upon submittal. Plan review shall· be a 30-day
plan review process or 21 working days. A fire department connection will be
required for this site .
38. Supervision (Fire Alarm) of sprinkler piping and fire detection devices shall be
automatically supervised where more than 20 sprinklers are on the system. An
annunciator panel will be required
Planning
39. No plans for construction shall be approved until East 30th Street has been restriped
and the red curbing along the property frontage removed to the satisfaction of the City
Engineer.
40.A minimum of one on-site parking space shall be dedicated to commercial customers
and shall be accessible to those with disabilities.
41. All future signage for the commercial units (live/work) shall be in compliance with
Chapter 18.47 of the National City Municipal Code.
42. The landscape plan submitted for grading and/or construction shall meet all
regulations contained in Chapter 18.44, including all required street trees.
Sweetwater
43. Fire Service, water meter, and valve placement locations and design shall comply
with the Authority's minimum required clearances .
BE IT FURTHER RESOLVED that copies of this Resolution be transmitted
forthwith to the applicant and to the City Council.
Planning Commission
Meeting of May 15, 2017
Page 8
BE IT FINALLY RESOLVED that this Resolution shall become effective and final on the
day following the City Council meeting where the Planning Commission resolution is set for
review, unless an appeal in writing is filed with the City Clerk prior to 5:00 p.m. on the day of
that City Council meeting. The City Council may, at that meeting, appeal the decision of the
Planning Commission and set the matter for public hearing.
CERTIFICATION:
This certifies that the Resolution was adopted by the Planning Commission at their meeting of
May 15, 2017, by the following vote:
AYES: Garcia, Yamane, Sendt, Flores, Dela Paz, Quintero
NAYS: None.
ABSENT: Baca
ABSTAIN: None.