Loading...
HomeMy WebLinkAbout2025-69 - Wright Construction Engineering Corp - Granger Avenue Storm Drain Project RESOLUTION NO. 2025 - 69 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, 1) AWARDING A CONTRACT TO WRIGHT CONSTRUCTION ENGINEERING CORP IN THE NOT-TO-EXCEED AMOUNT OF $272,500 FOR THE GRANGER AVENUE STORM DRAIN PROJECT, CIP NO. 25-05; 2) AUTHORIZING A 15% CONTINGENCY IN THE AMOUNT OF $40,875 FOR ANY UNFORESEEN CHANGES; AND 3) AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT. WHEREAS, the Granger Avenue Storm Drain Project, CIP No. 25-05 (the "Project"), located on Granger Avenue between E. 19th Street and E. 20th Street, represents the initial phase of improving the storm drainage system in this area, with a primary objective of increasing system capacity to avoid flooding during high intensity rain events; and WHEREAS, the Project will replace approximately 260 feet of 18-inch reinforced concrete pipe ("RCP") on Granger Avenue with 24-inch RCP, in addition to other system improvements; and WHEREAS, on May 20, 2025, the bid solicitation for the Project was posted on PlanetBids, a free public electronic bidding system for contractors; and WHEREAS, on May 24th and May 31st, 2025, the bid solicitation was advertised in the local newspaper; and WHEREAS, on June 11, 2025, eight (8) bids were received by the 1:00 p.m. deadline; and WHEREAS, upon review of all documents submitted, Wright Construction Engineering Corp's bid in the total bid amount of $272,500 was deemed responsive and they are the lowest responsible bidder qualified to perform the work as described in the Project specifications; and WHEREAS, City staff recommends 1) awarding a contract to Wright Construction Engineering Corp in the not-to-exceed amount of$272,500 for the Granger Avenue Storm Drain Project, CIP No. 25-05; 2) authorizing a 15% contingency in the amount of $40,875 for any unforeseen changes; and 3) authorizing the Mayor to execute the contract. 8NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS: Section 1: That the City Council hereby authorizes the Mayor to execute the contract with Wright Construction Engineering Corp in the not-to-exceed amount of $272,500 for the Granger Avenue Storm Drain Project, CIP No. 25-05. Section 2: That the City Council hereby authorizes a 15% contingency in the amount of$40,875 for any unforeseen changes. Section 3: That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions. PASSED and ADOPTED this 17th day of e, 2025. n Morrison, Mayor ATTEST: 47( /A-4(AA Shelle hapel, MMC, City Clerk t‘eyt APPROVED AS TO FORM: 'V fair Barry J. S d City Attorney Passed and adopted by the City Council of the City of National City, California, on June 17, 2025 by the following roll-call vote, to-wit: Ayes: Molina, Rodriguez, Yamane, Bush, Morrison Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: Ron Morrison Mayor of the City of National City, California Shelley Chapel f City Clerk of the City of National City, California o ant BY: 7, * Shelley C f el, MMC, City Clerk ,o0