HomeMy WebLinkAbout2026-62 - Projects to Receive Funding Pursuant to SB1 from the Road Maintenance and Rehabilitation Account through the Local Streets and Roads Funding Program RESOLUTION NO. 2026 - 62
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, 1)
APPROVING THE FOLLOWING PROJECTS PROPOSED TO RECEIVE FUNDING FROM THE
ROAD MAINTENANCE AND REHABILITATION ACCOUNT THROUGH THE LOCAL
STREETS AND ROADS FUNDING PROGRAM AS REQUIRED BY SENATE BILL 1, THE
ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017: A) CITYWIDE PROTECTED LEFT
TURN ENHANCEMENTS PROJECT, CIP 19-22, B) 8TH STREET BICYCLE AND
PEDESTRIAN RAIL CROSSING ENHANCEMENTS, CIP 22-33, AND C) 24TH STREET
TRANSIT CENTER CONNECTIONS PROJECT, CIP 23-13; AND 2) AUTHORIZING THE
ESTABLISHMENT OF A GAS TAX(RMRA) FUND APPROPRIATION AND CORRESPONDING
REVENUE BUDGET OF $1,654,471 FOR FISCAL YEAR 2026-2027.
WHEREAS, Senate Bill 1 ("SB 1"), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017)was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi-modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of National City ("City") are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account("RMRA"), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City will receive an estimated $1,654,471 in RMRA funds for FY 2027;
and
WHEREAS, this is the tenth year in which the City is receiving SB 1 funding, which will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City prioritizes projects based on health and safety benefits, input from
the community, pavement conditions assessments, project costs, schedule and available funding,
and consistency with long-range planning documents and policies; and
WHEREAS, the list of projects proposed to receive funding from the RMRA were
developed based on these criteria to ensure revenues are being used on high-priority and cost-
effective projects that meet the community's priorities for transportation investment; and
WHEREAS, revenues received from the RMRA will greatly assist the City in increasing
the overall quality and sustainability of our transportation system for the benefit of the public; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate
approximately one (1) mile of roadways throughout the community this year, as well as funding
upgrades to traffic signals by adding protected left-turn phases and new signal heads at 13
intersections, in addition to funding the pre-construction phase of improvements to bicycle and
pedestrian facilities at one (1) intersection; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an "at-risk" condition and this revenue will help the
City increase the overall quality of our road system and, over the next decade, will bring our
streets and roads into a "good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY,
CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS:
Section 1: That the City Council hereby authorizes, as required by Senate Bill 1, the
following list of newly proposed projects to be funded in-part or solely with Road Maintenance
and Rehabilitation Account revenues in Fiscal Year 2026-2027:
1) Citywide Protected Left Turn Enhancements Project, CIP 19-22 — Construction Phase —
Upgrade existing permissive left-turn phases and signal heads with protected left-turn
phases on existing and/or new traffic signal poles and mast arms; add left turn lane striping
at project signalized intersections; Americans with Disabilities Act (ADA) improvements;
and miscellaneous concrete repairs associated with this work.
Location: E. 8th Street and Roosevelt Avenue; Plaza Blvd and Roosevelt Avenue; 16th
Street and D Avenue; 18th Street and D Avenue; 24th Street and D Avenue; L Avenue and
Plaza Blvd; N Avenue and Plaza Blvd; L Avenue and 18" Street; Palm Avenue and 16th
Street; Palm Avenue and 18" Street; Prospect Street and Sweetwater Road; Grove Street
and Plaza Blvd; Euclid Avenue and 20th Street; Harbison Avenue and 8th Street.
Estimated Project Schedule (Start-End): October 2026 to December 2027.
Estimated Project Useful Life: 20 years.
2) 8th Street Bicycle and Pedestrian Rail Crossing Enhancements, CIP 22-33 — Pre-
Construction Phase — Improve bicycle and pedestrian connections along 8th Street from
the Transit Station to Harbor Drive, including the BNSF rail crossing, including constructing
continuous ADA-compliant sidewalks and pedestrian crossings over the railroad and
Harbor Drive on both the north and south sides of 8th Street; traffic signal modifications,
lighting, water quality improvements, signing and striping; and pavement rehabilitation with
mill and overlay, ADA improvements, and miscellaneous concrete repairs associated with
this work.
Location: W. 8th Street from Harbor Drive to National City Blvd.
Estimated Project Schedule (Start-End): July 2026 to July 2028.
Estimated Project Useful Life: 10 to 15 years.
3) 24th Street Transit Center Connections protect, CIP 23-13 — Construction Phase —
Construct Class IV protected bikeways along E 30th Street between Hoover Avenue and
Highland Avenue; a combination of Class II and Class IV bikeways along D Avenue
between 22nd Street and 30th Street; and Class II facilities along D Avenue between 22nd
Street and 18th Street; construct a combination of Class III (sharrows) and Class IV
bikeways on 22nd Street between Wilson Avenue and D Avenue, and a combination of
Class II, Ill, and IV facilities on 24th Street between B Avenue and N Avenue; provide
safety and accessibility upgrades at key crosswalks and install two new traffic signals; and
pavement rehabilitation with mill and overlay, ADA improvements, and miscellaneous
concrete repairs associated with this work.
Location: E 30th Street between Hoover Avenue and Highland Avenue; D Avenue
between 22nd Street and 30th Street; D Avenue between 22nd Street and 18th Street;
22nd Street between Wilson Avenue and D Avenue; 24th Street between B Avenue and
N Avenue.
Estimated Project Schedule (Start-End): November 2026 to July 2028.
Estimated Project Useful Life: 10 to 15 years.
Section 2: That the City Council hereby authorizes, as required by Senate Bill 1, the
following previously proposed and authorized project (for Fiscal Year 2025-2026 funding) to be
funded in-part or solely with Road Maintenance and Rehabilitation Account revenues in Fiscal
Year 2026-2027, reaffirming the public and the State the intent to fund the project with Road
Maintenance and Rehabilitation Account revenues:
8th Street and Roosevelt Avenue Active Transportation Corridor, CIP 19-44 —
Construction Phase — Improvements to pedestrian and bicycle facilities along 8th
Street (between the MTS trolley tracks and Roosevelt Avenue), Roosevelt Avenue
(between 8th Street and Main Street), and Main Street (between Division Street and
Yama Street)within the City of National City including, but not limited to, construction
of a new shared-use path with landscaped buffer, installation of new lighting and
electrical infrastructure, irrigation and landscaping improvements, drainage
enhancements, and installation of new signage and striping, as well as pavement
rehabilitation with mill and overlay, ADA improvements, and miscellaneous concrete
repairs associated with this work.
Location: W. 8th Street from Harbor Drive to National City Blvd; Roosevelt Avenue
from W. 8th Street to Main Street; Main Street from Roosevelt Avenue to Yama Street.
Estimated Project Schedule (Start-End): October 2026 to December 2027.
Estimated Project Useful Life: 10 to 15 years.
Section 3: That the City Council hereby authorizes the establishment of an
appropriation and a corresponding revenue budget of $1,654,471 in the Gas Tax (RMRA) Fund
in Fiscal Year 2026-2027.
Section 4: That the City Clerk shall certify to the passage and adoption of this
Resolution and enter it into the book of original Resolutions.
PASSED and ADOPTED this 2nd day of June, 2026.
Morrison, Mayor
ATTEST:
-/?5, .ri, eilicvJA-vu----
'Art Shelle apel, MMC, City Clerk
APPROVED AS TO FORM:
V (1)C-
Heidi Skinner, Interim City ttorney
Passed and adopted by the City Council of the City of National City, California, on
June 2, 2026 by the following vote, to-wit:
Ayes: Yamane, Rodriguez, Bush, Molina, Morrison
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
Shelley Chapel
�E tua� 'ok`
d�, t City Clerk of the City of National City, California
44 \%
t l^; BY:
?' Shelle apel, MMC, City Clerk
t: (VI'