Loading...
HomeMy WebLinkAbout2026-91 - Rove Engineeering, Inc. - Awarding a Contract for the Roosevelt Active Transportation Corridor (PLA) RESOLUTION NO. 2026 - 91 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, 1) AWARDING A CONTRACT TO ROVE ENGINEERING, INC. IN THE NOT-TO-EXCEED AMOUNT OF $5,034,223.00 FOR THE 8TH AND ROOSEVELT ACTIVE TRANSPORTATION CORRIDOR PROJECT, CIP NO. 19-44; 2) AUTHORIZING A 10% CONTINGENCY IN THE AMOUNT OF $503,422.30 FOR ANY UNFORESEEN CHANGES; AND 3) AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT. WHEREAS, the 8th and Roosevelt Active Transportation Corridor Project, CIP No. 19-44 (the "Project") will improve pedestrian and bicycle facilities along 8th Street (from the MTS trolley tracks to Roosevelt Avenue), Roosevelt Avenue (from 8th Street to Main Street), and Main Street (from Division Street to Yama Street) within the City of National City, with work including, but not limited to, constructing a new shared-use path with a landscaped buffer; installing new lighting and electrical infrastructure; providing irrigation and landscaping improvements; enhancing drainage; and installing new signage and striping; as well as roadway improvements such as asphalt paving and construction of new curbs and gutters; and WHEREAS, on April 20, 2026, the bid solicitation for the Project was posted on PlanetBids, a free public electronic bidding system for contractors; and WHEREAS, on April 27th and April 28th, 2026, the bid solicitation was advertised in the local newspaper; and WHEREAS on May 29, 2026, eight (8) bids were received by the 5:00 p.m. deadline; and WHEREAS, upon review of all documents submitted, Rove Engineering, Inc.'s in the total bid amount of$5,034,223.00 was deemed responsive and they are the lowest responsible bidder qualified to perform the work as described in the Project specifications; and WHEREAS, City staff recommends 1) awarding a contract to Rove Engineering, Inc. in the not-to-exceed amount of $5,034,223.00 for the 8th and Roosevelt Active Transportation Corridor Project, CIP No. 19-44; 2) authorizing a 10% contingency in the amount of$503,422.30 for any unforeseen changes; and 3) authorizing the Mayor to execute the contract. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF NATIONAL CITY, CALIFORNIA, DOES RESOLVE, DECLARE, DETERMINE, AND ORDER AS FOLLOWS: Section 1: That the City Council hereby authorizes the Mayor to execute the contract with Rove Engineering, Inc. in the not-to-exceed amount of $5,034,223.00 for the 8th and Roosevelt Active Transportation Corridor Project, CIP No. 19-44. Section 2: That the City Council hereby authorizes a 10% contingency in the amount of$503,422.30 for any unforeseen changes. Section 3: That the City Clerk shall certify the passage and adoption of this Resolution and enter it into the book of original Resolutions. PASSED and ADOPTED this 30th day of June, 2026. Morrison, Mayor ATTEST: ieiShelley fil pel, MMC, City Clerk APPROVED AS TO FORM: Heidi Skinner, City Attorney Passed and adopted by the City Council of the City of National City, California, on June 30, 2026 by the following roll-call vote, to-wit: Ayes: Yamane, Bush, Molina, Morrison Nays: None. Absent: Rodriguez Recused: None. AUTHENTICATED BY: Ron Morrison Mayor of the City of National City, California timaL ,fir- Shelley Chapel e.)7(al City Clerk of the City of National City, California 1,k.,7r- * "tckn_ ,14c. / , de/t-e2-47ot-t-----) CAL Os BY: Shelley pel, MMC, City Clerk