CHANGE ORDER MEMORANDUM
March 12,2025
To: Stephen Manganiello,
Director of Engineering&Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corporation
Project: Paradise Creek Emergency Storm Damage Repair
CIP No.: N/a
Subject: Change Order No.1
Change Order No. 1 provides for:
Proceeding with repairing damaged slope on the West side of Honeysuckle Road with removing and replacing
chain link fence and importing and compacting soil to repair slope.
Payment for this change order was determined by agreed upon lump sum.
Supporting Information:
During the 1000 year storm event the storm drain culvert below Honeysuckle Road reached full capacity and
water spilled over Honeysuckle Road causing damage to the slope and chain link fence as it re-entered the
culvert on the other side of the road.
Time Adjustment:
Two(2)working days are to be added to the contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$7,700.00.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The
supporting documentation is on file with the project records.
9sh Johnson, PPC 3/24/25
rojec anager Date
— CALIFORNIA —
NATIONAL Cory
INCORPOR ATV)
PARADISE CREEK EMERGENCY STORM DAMAGE REPAIR CHANGE ORDER NO. 1
CIP NO. N/A March 6,2025
Contractor: Wright Construction Engineering Corp
2625 S Santa Fe Ave
San Marcos,CA 92069
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Two (2)working days are be added to the contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with repairing damaged slope on
the West side of Honeysuckle Road with removing and replacing chain link fence and importing and
compacting soil to repair slope.The total amount for all labor, material, equipment and all other
associated work is$7,700.00.
Recommended by Project Manager cosh Johnson, PPC Date: 3/24/25
By signing this Change Order the Contrac •r confirms that he/she is completely familiar with and has fairly
negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor: 3/7/25
(Print Name and Title) Date:
Jason Merritt-Project Manager
Approved by Project Coordinator: L-g-' Date:
Approved by Assistant Director of E&PW: ./W I Date:
Approved by City Engineer: . /� Date:
Approved by City Manager: �- Date:
(Required for change orders$25,000 and above)
CALIFORNIA *�+
NATIONAL airy
�-- INCORPORATED
PARADISE CREEK EMERGENCY STORM DAMAGE REPAIR CHANGE ORDER NO. 1
CIP NO. N/A
DATE: March 12,2025
WORK PERFORMED BY: Wright Construction
DESCRIPTION OF WORK: Repairing damaged slope and chainlink fence from 1000 year storm event
ACCOUNTING FOR TIME,MATERIALS,AND EQUIPMENT
LABOR Unit Qty Wage Total
1) Laborer HR 16.00 71.16 1,138.56
2) Laborer HR 16.00 71.16 1,138.56
3) Laborer HR 16.00 71.16 1,138.56
4) Operator HR 8.00 91.58 732.64
Sub-Total Labor: $ 4,148.32
Labor Burden(19%): $ 788.18
Labor Markup(20%): $ 829.66
TOTAL LABOR: $ 5,76646
EQUIPMENT Unit Qty Rate Total
1) 305 Mini Ex HR 8.00 55.25 442.00
2) F-250 Utility Truck HR 12.00 41.96 503.52
3) Vibra Plate Compactor HR 8.00 5.38 43.04
4) 279 Skid Steer HR 4.00 48.93 195.72
5) Dump Truck HR 4.00 73.10 292.40
5) Water Truck HR 4.00 57.26 229.04
Sub-Total Equipment: $ 1,705.72
Equipment Markup(15%): $ 255.86
TOTAL EQUIPMENT: $ 1,961.58
SUB TOTAL: $ 7,727.74