Loading...
HomeMy WebLinkAboutProject Professionals Corporation - Paradise Creek Emergency Storm Damage Repair - Change Order No. 1 - 2025 ... a eia�{ IV P P C or: E Y F'k f"t'77) t i• PROJECT PROFESSIONALS CORPORATION 71..1.15 MR 2 u n 3: 53 v I i o Ai tU AL CITY CHANGE ORDER MEMORANDUM March 12,2025 To: Stephen Manganiello, Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Paradise Creek Emergency Storm Damage Repair CIP No.: N/a Subject: Change Order No.1 Change Order No. 1 provides for: Proceeding with repairing damaged slope on the West side of Honeysuckle Road with removing and replacing chain link fence and importing and compacting soil to repair slope. Payment for this change order was determined by agreed upon lump sum. Supporting Information: During the 1000 year storm event the storm drain culvert below Honeysuckle Road reached full capacity and water spilled over Honeysuckle Road causing damage to the slope and chain link fence as it re-entered the culvert on the other side of the road. Time Adjustment: Two(2)working days are to be added to the contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$7,700.00. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. 9sh Johnson, PPC 3/24/25 rojec anager Date — CALIFORNIA — NATIONAL Cory INCORPOR ATV) PARADISE CREEK EMERGENCY STORM DAMAGE REPAIR CHANGE ORDER NO. 1 CIP NO. N/A March 6,2025 Contractor: Wright Construction Engineering Corp 2625 S Santa Fe Ave San Marcos,CA 92069 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Two (2)working days are be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with repairing damaged slope on the West side of Honeysuckle Road with removing and replacing chain link fence and importing and compacting soil to repair slope.The total amount for all labor, material, equipment and all other associated work is$7,700.00. Recommended by Project Manager cosh Johnson, PPC Date: 3/24/25 By signing this Change Order the Contrac •r confirms that he/she is completely familiar with and has fairly negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: 3/7/25 (Print Name and Title) Date: Jason Merritt-Project Manager Approved by Project Coordinator: L-g-' Date: Approved by Assistant Director of E&PW: ./W I Date: Approved by City Engineer: . /� Date: Approved by City Manager: �- Date: (Required for change orders$25,000 and above) CALIFORNIA *�+ NATIONAL airy �-- INCORPORATED PARADISE CREEK EMERGENCY STORM DAMAGE REPAIR CHANGE ORDER NO. 1 CIP NO. N/A DATE: March 12,2025 WORK PERFORMED BY: Wright Construction DESCRIPTION OF WORK: Repairing damaged slope and chainlink fence from 1000 year storm event ACCOUNTING FOR TIME,MATERIALS,AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer HR 16.00 71.16 1,138.56 2) Laborer HR 16.00 71.16 1,138.56 3) Laborer HR 16.00 71.16 1,138.56 4) Operator HR 8.00 91.58 732.64 Sub-Total Labor: $ 4,148.32 Labor Burden(19%): $ 788.18 Labor Markup(20%): $ 829.66 TOTAL LABOR: $ 5,76646 EQUIPMENT Unit Qty Rate Total 1) 305 Mini Ex HR 8.00 55.25 442.00 2) F-250 Utility Truck HR 12.00 41.96 503.52 3) Vibra Plate Compactor HR 8.00 5.38 43.04 4) 279 Skid Steer HR 4.00 48.93 195.72 5) Dump Truck HR 4.00 73.10 292.40 5) Water Truck HR 4.00 57.26 229.04 Sub-Total Equipment: $ 1,705.72 Equipment Markup(15%): $ 255.86 TOTAL EQUIPMENT: $ 1,961.58 SUB TOTAL: $ 7,727.74 GRAND TOTAL: $ 7,727.74