Loading...
HomeMy WebLinkAboutProject Professionals Corporation - Paradise Creek Water Quality and Community Enhancement Ph. II - CIP No. 19-11 - Change Order No. 29 - 2026 r P C 7.O5 EAR I3 , IC: I5 PROJECT PROFESSIONALS CORPORATION ci c <wT-1ONAL CITY CHANGE ORDER MEMORANDUM February 13,2025 To: Stephen Manganiello, Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Paradise Creek Water Quality and Community Enhancement Ph.II CIP No.: 19-11 Subject: Change Order No.29 Change Order No.29 provides for: Additional 3433 square feet of procuring and installing High-Performance Turf Reinforcing Mat(TRM)system for approximate Stations 4+84 to 10+70 for anchor trenches. Payment for this change order was determined by line items attached. Supporting Information: CO#25 covered the square feet measurements of the TRM system installed on the slopes and bottom of the creek for approximate stations 4+84 to 10+70.The anchor trenches for the TRM system were not measured and needed to be included for an additional 3433 SF. Time Adjustment: Zero(0)working days are to be added to the contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$20,598.00 The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. Josh Johnson, PPC 2/14/25 P oject anager Date _*- CALIFORNIA -- N TIONAL CITY INCORPORATED PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT PH. II CHANGE ORDER NO. 29 CIP NO. 19-11 February 13,2025 Contractor: Wright Construction Engineering Corp 2625 S Santa Fe Ave San Marcos,CA 92069 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero(0)working days are be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor is to proceed with an additional 3433 square feet of procuring and installing High-Performance Turf Reinforcing Mat(TRM)system for approximate Stations 4+84 to 10+70 for anchor trenches.The total amount for all labor, material, equipment and all other associated work is$20,598.00. Recommended by Project Manager: il^^--- Josh Johnson, PPC Date: 2/14/25 By signing this Change Order the Contrac or confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: fr---A! Date:2/14/25 (Print Name and Title)Jason Merritt-Project Manager 7- Approved by Project Coordinator: ¢ at Date: Approved by Assistant Director of E&PW: iiir Date: Approved by City Engineer: vi / ? • Date: Approved by City Manager: �� Date: (Required for change orders$25,000 and above) Paradise Creek Water Quality and Community Enhancements - Ph. II . CALIFORNIA CIP No. 19-11 , NATIONAL airy INCORPORATED Paradise Creek Water Quality and Community Enhancements - Ph. II CIP#: 19-11 CO#29 February 13, 2025 Line Items No. Item Unit Quantity Unit Price Amount Upstream Scope 1 High-Performance Turf Reinforcing Mat (TRM) SF 3433 6.00 20,598.00 TOTALS: 20,598.00 Page 1 of 1