PROJECT PROFESSIONALS CORPORATION
a..: ; . .. �. �,L CITY
CHANGE ORDER MEMORANDUM
February 14,2025
To: Stephen Manganiello,
Director of Engineering&Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corporation
Project: Paradise Creek Water Quality and Community Enhancement Ph.II
CIP No.: 19-11
Subject: Change Order No.30
Change Order No.30 provides for:
Grouting the rip rap at the center of the creek from approximate stations 13+80 to 14+25
Payment for this change order was determined by force account.
Supporting Information:
With removing the maintenance access ramp west of the downstream rip rap section a path of travel had to
be established through the rip rap section.With the revised access ramp location from HDR it was
recommended to grout the rip rap in the middle of the creek to provide a stable path of travel for
maintenance to cross the rip rap section with a skid steer to maintenance the west end of the creek.
Time Adjustment:
Zero(0)working days are to be added to the contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$8,127.87.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The
supporting documentation is on file with the project records.
Josh Johnson, PPC 2/14/25
ojec anager Date
-,- CALIFORNIA —R
NATIONAL CITp
to 1
INCORPORATED
PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT PH. II CHANGE ORDER NO.30
CIP NO. 19-11 February 14,2025
Contractor: Wright Construction Engineering Corp
2625 S Santa Fe Ave
San Marcos, CA 92069
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Zero(0)working days are be added to the contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor is to proceed with grouting the rip rap at the
center of the creek from approximate stations 13+80 to 14+25.The total amount for all labor, material,
equipment and all other associated work is$8,127.87.
Recommended by Project Manager: Johnson, PPC Date: 2/14/25
By signing this Change Order the Contract r confirms that he/she is completely familiar with and has fairly
negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor: -- Date:2/14/25
(Print Name and Title)Jason Merritt-Project Manager
Approved by Project Coordinator: ,a,, \`''�� Date:
Approved by Assistant Director of E&PW: iler 0(.. `g-, Date:
'i1j "'
!
Approved by City Engineer: 7 Date:
Approved by City Manager: Date:
(Required for change orders$25,000 and above)
+}-t CALIFORNIA
N LTIONAL cI'Z'Y
a3,POINCORPORATED
PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENTS - PH. II
CIP NO. 19-11
DATE: December 20,2024
WORK PERFORMED BY: Wright Construction Engineering Corp.
DESCRIPTION OF WORK: Grouting rip rap within downstream section
ACCOUNTING FOR TIME,MATERIALS,AND EQUIPMENT
Unit Qty Wage Total
1) Superintendent-Brian N. HR 3.00 77.12 231.36
2) Superintendent-Brian N. (Overtime) HR 1.00 115.68 115.68
3) Laborer-Jose R. HR 3.00 71.16 213.48
4) Laborer-Jose R.(Overtime) HR 1.00 106.74 106.74
5) Laborer-RobertV. HR 3.00 71.16 213.48
6) Apprentice Laborer-JacobS. HR 2.00 40.05 80.10
Sub-Total Labor: $ 960.84
Labor Burden(19%): $ 182.56
Labor Markup(20%): $ 192.17
TOTAL LABOR: $ 1,335.57
Unit Qty Rate Total
1) Superior Ready Mix-2500 PSI concrete LS 1.00 5,388.96 5,388.96
Sub-Total Materials: $ 5,388.96
Materials Markup(15%): $ 808.34
TOTAL MATERIALS: $ 6,197.30
SUBCONTRACTOR Unit Qty Rate Total
1) Double Pumping-Concrete Pump Service LS 1.00 566.67 566.67
Sub-total Subcontractor: $ 566.67
Prime Contractor Markup(5%): $ 28.33
TOTAL SUBCONTRACTOR: $ 595.00
SUB TOTAL: $ 8,127.87
GRAND TOTAL: $ 8,127.87
WRIGHT
PROJECT CHANGE ORDER REQUEST #38
PROJECT NAME Paradise Creek Water Quality & Community Enhancements-Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-1 I CHANGE ORDER NO. 38
REQUESTING PARTY City of National City DATE OF REQUEST January 6, 2025
PROJECT MANAGER Randy Garcia CONTRACTOR Wright Construction Eng. Corp
OWNER City of National City ENGINEER Javier Alexandro Yescas
PROJECT DETAILS
Earthwork, Drainage System, Rip Rap, Flatwork, Headwalls. Precast Boxes, Hydroseed, Fencing,
Asphalt, Turf Reinforcing Mat & Culvert Grates
PROJECT CHANGE REQUEST DESCRIPTION
DESCRIPTION
OF CHANGES Installation of concrete within rip rap located downstream of box culvert
NEEDED
CHANGE
ON FOR City's Request to install grout within bottom of creek for access of City personnel
List all attached documents which support the requested change and justify any increased cost and time.
SUPPORT& See Attached Email from City
JUSTIFICATION
DOCUMENTS
SPECIFICATIONS Special Provisions, Section 3-3 &Section 6-6.2
IMPACT OF Rip Rap within bottom of creek on downstream section will have concrete filled within voids
CHANGE
RISK
MANAGEMENT
PROJECT NAME Paradise Creek Water Quality 8,Community Enhancements- Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 38
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
ORIGINAL PRICE $2,610,245.00 ORIGINAL TIMES 120 Working Days
NET CHANGES OF NET CHANGES OF PREVIOUS
PREVIOUS CHANGE ORDERS $596,076.43 CHANGE ORDERS IN DAYS 99 Working Days
NET INCREASE/DECREASE Increase $8,346.80 NET INCREASE/DECREASE Increase 0 Working Days
TOTAL CONTRACT PRICE $3,206,321.43 TOTAL CONTRACT TIME 219 Working Days
WITH APPROVED CHANGES WITH APPROVED CHANGES
CHANGE REQUEST PRIORITY LEVEL PRIORITY LEVEL JUSTIFICATION
PROJECT CHANGE ORDER DISCUSSION DOCUMENTATION
CHANGE HAS BEEN DISCUSSED WITH:
NAME&TITLE NAME&TITLE DATE
By
By
By
By
By
By
RECOMMENDED BY APPROVED BY
ENGINEER OWNER
DATE I DATE
ACCEPTED BY REVIEWED BY
CONTRACTOR FUNDER
DATE January 6, 2025 DATE
Estimate Breakdown
Dates: 12/20/24
Project Name Paradise Creek Mtlgation&Community Enhancements-Phase Work Sheet No.
Prime Contractor Wright Construction Engineering Corp Charge Order Request 38
Supplier
Project No. OP 19-11
LABOR Pete, Han Total EQUIPMENT Rates Han Total SUBCONTRACTOR/Materials
Class Name S.i. O.T. S.. O.T. S.T. O.T. Model Type Per Hr. Tot.tea. Description Inu.R Quint. Unit
Laborer Chris Suster $ 71.16 $ 106.74 Foreman,Truck 00-06 $ 41.96 $ Superior Ready MD-2503 poi Concrete 468964 12.667 $5,3118.96 $ 5,3138.96
Laborer Jose Reya $ 71.16 $ 106.74 $ 213.48 $ 106.74 305 Mini Excavator 0250 $ 55.25 $ - Double Pumping-Concrete Pump Service 1 .$ 566.67 $ 566.67
Laborer Gustavo Marquez $ 71.16 $ 106.74 Caterpillar 314 0302QR $ 77.90 $ -
Laborer Tony Marquez-Zermeno $ 71.16 $ 106.74 10 Wheel Dump Truck 3A%L $ 94.12 $ -
Laborer Ernesto Murrill $ 71.16 $ 106.74 F-250Tod Bar Truck 0612 $ 41.96 $
Laborer Robert Valle $ 71.16 $ 106.74 $ 21348 $ 106.74 F-350tod Box Truck 06-12 $ 41.96 $
Laborer Nick Hunter $ 71.16 $ 106.74 Ram 2500 Work Truck 06-12 $ 41.96 $
Laborer lose Marquez $ 71.16 $ 106.74 Walk Behind Concrete Saw 20-33 $ 19.42 $ -
Laborer Julio Silva 5 71.16 $ 106.74 U Compactor 0250 5 841 $ -
Laborrer Daniel Gonzales $ 71.16 $ 106.74 Water Trailer 10-020 $ 7.34 $ -
Laborer Steven Gonzales $ 71.16 $ 106.74 Vibra Plate Compactor 0-250 $ 5.38 $ -
Laborer-Apprentice Jacob Swain $ 40.05 $ 60.08 $ 30.10 2590 Sled Steer(73HP) 2159 $ 56.06 $ -
Carpenter Victor Cruz $ 77.12 5 115.68 279Skd Steer(66HP) A $ 48.93 $ -
Carpenter Brian Nicholson $ 77.12 $ 115.68 $ 231.36 5 115.68 Rod Mounted Arrow Board RM $ 1.14 $ -
Operator Steve Loftin $ 94.48 $ 141.72 F.250 Arrow Truck 00.06 $ 37.19 $ -
Operator Randy Matthews $ 94.48 5 141.72 Air Compressor 185 025-045 $ 47.34 $ -
Operator Steve Falkenstein $ 94.48 $ 141.72 Air Tools 60 $ 1.77 $ -
Operator Nick Shearer $ 94.48 $ 141.72 Drum Roller 1150 $ 32.35 $ -
Carpenter Wes Wright $ 77.12 $ 115.68 Cutoff Saw 0-10 $ 4.29 $
Small Tools 045-060 $ 0.36 $
Generator C08-015 5 12.34 5 -
110 High Cycle Vibrator EVHD $ 1.36 5 -
Water Truck 20-28 57.26 $
Arc Welding Machine 250-503 $ 15.52 $
SCY Dump Truck 2Ay1 $ 73.10 $ -
314 Excavator 0302QR $ 77.90 $ -
336F Excavator 0351F $238.96 $ -
480 Excavator 3010 $224.98 $ -
415StpLoader 1850F2 $ 63.21 $ -
970FLoader 2370 $215.52 $ -
Surcharge 19% 5 82.33 Subtotal $ 748.42 $ 329.16 Subtotal $ - Subtotal 5,955.63
Markup 20% $ 149.68 $ 65.83 Standard Markup Markup 15% T< - Standard Markup Markup 15% 893.34
Total $ 1,040.30 $ 457.53 Total $ - Total $ 6,848.97
ITEM I Amount % Marko, Total
Description Of Work&Note, I certify that the I$ - 0% 5 - 5 -
costBreakdownforGreutingRipRapwithinBowlineofDown,treamSection changes are accurately Equipment $ -
reported for the labor $ 1,497.83
Attached is the cost for the completion of work via force account analysis work Indicated Material/SUBCONTRACTOR $ 6,848.97
along with any additional documents pertaining to the cost of all work Total(Egdp.,Labor,Materials,Subcontractor) $ 8,346.80
Date: 1/6/24
0: Total This Report I$ 8,346.80
0604
1 DAILY RECORD OF EXTRA WORK ��../j
one t,r2° l I l r'i . -
,P, ,Try. a Dy ParctiNttratit. wart u..+<ara
rime t marectar %Wet Cetbervtteon tr,r$r*$f Ina Carp 1 .Order ha
i . r;a1.=... «..,...., ..Ma..
twet..+wwn
.rrsp"t7 NO
tlt�otE KernOMTM , [YX1�11KM aT a e, ra Total MMTD I
`
___ Moee 1 I O T $T 0 T MrU1 Tie tat MT Orw1}Ow h+.r! CMrAt 1oI N
p ;an • LI Z y.2m F-55o _ .__.. day .Jov�.z ► SQ2 n t
. VOr -114yL. , i __.-
4tr4..)aeolo S 2..
_a T- os.e, v.. 11 2- LI 2.. 044- Z A$1., ,
,G t 9ts __� Jib.
,� !did ‘ day
mai Amara s taw
Descrlptton of Work&Notes RV/da f p s Certify that Dta dunces ara accurately rebated for tt»
E
wort
i...a' ".
14P lay, "el". V Ste) pea0r# ' ( L.t:, i
I'v'lti' by/ 200' hate. 14/07fd siv. .r ra.,ltts•,.r ratter&K.Eaoao
y 411 IV 3 -i +.t «c 1'D i�Ll (`L-`t . �° .
Data
SUPERIOR READY MIX
CONCRETE, L.P. INVOICE
*�h 1564 W.MISSION RD.*ESCONDIDO,CA 92029
_ PHONE(760)745-0556'FAX (760)740-9557
•
WRIGH030 12/20/2024 468964 1
WRIGHT CONSTRUCTION ENGINEER
2625 S. SANTA FE AVENUE
SAN MARCOS, CA 92069
TERMS NET 30 DAYS
A FINANCE CHARGE WILL BE IMPOSED ON PAST DUE ACCOUNTS.THE
FINANCE CHARGE IS COMPUTED BY A PERIODIC RATE OF 1 1/2% PER
MONTH,WHICH IS AN ANNUAL PERCENTAGE RATE OF 18%OR A MINIMUM
SERVICE CHARGE OF$5.00 WHICHEVER IS GREATER.
DATE JOB NUMBER-JOB LOCATION-ADDRE ; UNIT
000044 PARADISE CREEK WATER QUALITY PHASE II
3958 E. PLAZA BLVD. NATIONAL CITY
12/20/24 38.00 CY 6625P 169. 000 497 .72 6919 . 72
6.25 SK 2500 PSI CONCRE
4 .00 LD CFS 30. 000 9.32 129.32
FUEL SURCHARGE
4 .00 LD EE 40. 000 12.40 172 .40
ENVIRONMENTAL/ENERGY SUR
4 .00 LD PWF 200. 000 62 .00 862 . 00
PUBLIC WORKS FEE AB219
TICKET DATE TOTALS: 7502 .00 581.44 8083.44
JOB TOTALS 7502 .00 581.44 8083 .44
TICKETS: 004-491946 004-491956 004-491969 004-491974
Minus $2,694.48 for Rip Rap Grout Between Wingwalls
AMOUNT DUE 8 1 : • 4 4
$5,388.96
., . m,,,,, ,,.. ,
DhllIDIE—
PUMPINGv....6,,
• 3/4 Big Rock
"l - _ .. • 3/8" Pea Gravel
• Footing / Slabs
.,,,/l • Copping
I �7 • Steps P 2 127
/ r (760) 802-3474
610 Carlann Ln • Escondido, Ca. 92027
COD ACCT. CASH DATE /2 '`76 "2'4/
Bill To Li (rIl i, I (''Q`,�' /tvc71-it 0,1 / ..1
Job Address -7.-- 703 G P;'` 2- e` er/ l/di
Driver Azei. it.e-liq cti e-( 'Ty
776)/1
Due on Job Started Pour Stopped Pour Yardage Hose
Mac Co Mix PSI Pump Size Mix Color Job Descnpbon //
JOB INFORMATION
Customer must furnish water on the job site and Set Up3,5 c,
a place to clean out. In the event of equipment
failure,we assume no responsibility for concrete, Yardage . G�' O
standby time, labor or any other charges Customer Short Load
Is also to provide for and assume responsibility
for area or container for clean out and responsible Extra Hose
for any grey water capture.All jobs are C 0 D
unless prior arrangements have been made Moves
TERMS: Net Cash Positively No Discounts All Stand By 7 ,'!
accounts due and payable on 10th of month
following date of service. Past due accounts subject Washout
to 17.8%monthly penalty and all costs of collection. Total Y Q�`
including Attorney Fees
NOTE:Exceptions&Claims shall be deemed waived unless made to us in writing within 2 days after
receipt of services.Company assumes no responsibility for damage inside curb or property line We are
not responsible for delays caused by improper scheduling in trucks changes in labor. services,damage
to any equipment of materials furnished or which will be furnished are not paid, the property which is
being improved and the improvements thereon may be subject to mechanics liens
COD CUSTOMERS: Preliminary Notice Charges to be charged to customer if balance not paid on
delivery
Accepted by: 1, _ `
Signature Print Name --
ALL RETURNED CHECKS WILL BE CHARGED A$20 SERVICE FEE
From: JoshJormson josh@ppc-sd.com
Subject: Paradise Creek Water Quality.Grouted Rip Raptor access road downstream
Dale: December 16,2024 at 1:42 PM
To: Jason Marritt jmerritt@wcec.net
Co: Richard Talley nchard@ppc-sd.com, LucaZappiello IZappiello@nationalcityca.gov
Jason,
Please proceed with grouting the rip rap within the center of the downstream section of rip rap to
line up with the graded access road. See attached photo with sketch. Please provide pricing for this
additional work. Let me know if you have any questions or comments.
Thanks,
} ' $
•
•
. ' 1 I' Ott t tr 1+/ +1ti €fir
p - ' 7k- 12-: 1-* •,i• C C '41,! • 1
,.m.ivaStrivi
—, . '111111‘' 4
ACIII ...- 4. ii,,,r,,,,,,,,, lir ',on-. - .'ir
, Silk
qb .4.5.710igisio,lar ift Oil 11114k0 ...V
Josh Johnson,PE
Vice President/Senior Project Manager
Project Professionals Corporation