Project Professionals Corporation - Paradise Creek Water Quality and Community Enhancement Ph. II - CIP No. 19-11 - Change Order No. 34 - 2025
4 P C EC IC ED &i..J >irk 34 A 8: t2 PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM k.;= AL CITY March 28, 2025 To: Stephen Manganiello, Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Paradise Creek Water Quality and Community Enhancement Ph.II CIP No.: 19-11 Subject: Change Order No.34 Change Order No.34 provides for: Proceeding with repairing Sweetwater Authority trench within Paradise Valley Road and E. Plaza Blvd intersection at approximate station 3+25. Payment for this change order was determined by agreed upon lump sum. Supporting Information: Sweetwater Authority provided disconnect and reconnect of a water line to allow the precast box culvert to be installed through the intersection of Paradise Valley Road and E. Plaza Blvd.With the project nearing completion Sweetwater Authority could not obtain crews fast enough to repair the trench without holding up the project and have opted for National City to provide trench repair under the Contract and then reimburse National City.See attached email with confirmation. Time Adjustment: Two(2)working days are to be added to the contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$13,584.88. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. Josh Johnson, PPC 4/1/25 roje Manager Date — CALIFORNIA — NATIONAL CITY an/ iNCORPORAT$D PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT PH. II CHANGE ORDER NO.34 CIP NO. 19-11 March 28,2025 Contractor: Wright Construction Engineering Corp 2625 S Santa Fe Ave San Marcos,CA 92069 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Two(2)working days are be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with repairing Sweetwater Authority trench within Paradise Valley Road and E. Plaza Blvd intersection at approximate station 3+25. Work to included but not limited to removal of temporary asphalt, installation of base course asphalt and 2"grind and overlay for trench limits.The total amount for all labor, material, equipment and all other associated work is$13,584.88. Recommended by Project Manager; - Os Johnson, PPC Date: 4/1/25 By signing this Change Order the Contra r confirms that he/she is completely familiar with and has fairly negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: � � Date:3/28/25 (Print Name and Title)Jason Merritt-Project Manager Approved by Project Coordinator: ` ,Cad�'✓ Date: Off► �� \) Approved by Assistant Director of E&PW. q,t� Date: Approved by City Engineer: ., 7 Date: Approved by City Manager: Date: (Required for change orders$25,000 and above) 4:4 CONSTRUCTION ENGINEERING CORP. LICIIIsl 1/99s113 PROJECT CHANGE ORDER REQUEST #48 PROJECT NAME Paradise Creek Water Quality &Community Enhancements- Phase II LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd. CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 48 REQUESTING PARTY City of National City DATE OF REQUEST March 17, 2025 PROJECT MANAGER Randy Garcia CONTRACTOR Wright Construction Eng. Corp OWNER City of National City ENGINEER Javier Alexandro Yescas PROJECT DETAILS Earthwork, Drainage System, Rip Rap, Flatwork, Headwalls. Precast Boxes, Hydroseed, Fencing, Asphalt, Turf Reinforcing Mat & Culvert Grates PROJECT CHANGE REQUEST DESCRIPTION DESCRIPTION Removal of temporary asphalt installed by Sweetwater Authority, installation of base course NEEDED CHANGES asphalt and then 2" grind of asphalt and installation of 2" thick asphalt finish course p p p Sweetwater Authority replaced water main that extended past limits of box culvert trench and REASON FOR had installed a temporary asphalt within areas of trench which is approximately 309.5 SF of CHANGE grind and overlay work List all attached documents which support the requested change and justify any increased cost and time. SUPPORT& See Attached Email Thread from City JUSTIFICATION DOCUMENTS SPECIFICATIONS Special Provisions,Section 3-3 &Section 6-6.2 IMPACT OF Additional Asphalt Work that extends past limits of box culvert trench CHANGE RISK MANAGEMENT PROJECT NAME Paradise Creek Water Quality & Community Enhancements- Phase II LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd. CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 48 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES ORIGINAL PRICE $2,610,245.00 ORIGINAL TIMES 120 Working Days NET CHANGES OF $649,345.74 NET CHANGES OF PREVIOUS 101 Working Days PREVIOUS CHANGE ORDERS CHANGE ORDERS IN DAYS NET INCREASE/DECREASE Increase $13,584.88 NET INCREASE/DECREASE Increase 3 Working Days TOTAL CONTRACT PRICE $3,259,590.74 TOTAL CONTRACT TIME 221 Working Days WITH APPROVED CHANGES WITH APPROVED CHANGES CHANGE REQUEST PRIORITY LEVEL PRIORITY LEVEL JUSTIFICATION PROJECT CHANGE ORDER DISCUSSION DOCUMENTATION CHANGE HAS BEEN DISCUSSED WITH: NAME&TITLE NAME&TITLE DATE By By By By By —I ._.._._ ..�. BY RECOMMENDED BY APPROVED BY S ENGINEER OWNER DATE DATE ..,_,..r _ _ ....I ACCEPTED BY REVIEWED BY CONTRACTOR FUNDER DATE March 17,2025 DATE i REVISIONS BY APPROVED DATE CONSTRUCTION RECORDS SURVEYOR: SAMPO ENGINEERING INC. $I ENGINEERING DEPARTMENT CC APPROVED IG'ZS Y LVER oDAACI1x BENLHMA aEA AIm1 rLOGiELn 11.E ME AS BUILT BY APPRDVED DATE 1 DATE STARlEO. _ m(n nasl 9 INSPECTOR: HORIZONTAL CONTROL: i •o61 iV®i�POMr •e.BE P DATE COMPLETED: MONITOR MOM. y _ I �, fii' I i xi,-.rrI.F OD P X' 8 o S ' IA `iLiE S S_ 1 . .. 1. \ .. 0. .„,.. ,t., ..., I il ail.1-- - Iv liWtt'llt-,..;,,; - G 1 6.,4,1�6.0 i t / phi •i1 g U TL ��1ti1a�li��i���lul�jtn� g ft�1���i NMI I\ �T� l�pp�'�11,��; WI 0�' ��i/l�i / 0I 0 11 Q e;Q 1 gk ggg I m lit " nir ,, .,1„' , \ "A\\ ;18 i I 1 t g i \ , v Al,11_g ,+yam rii i"IgAllir ••,. 11,---:: °' • • i p % ,�� ell'2i r• g '74 ii _.-' p 2 '� _ a , g� �X erg :�:� -,m V \, \\ i S�& �1\� k g ,4 TyR \ \`1 11 11 \iilA t,;\st"- ) 1 1 1- /Ilia �� 4i 1 ', .2 g , i \ i i t\ .c I l .1 eik i 40a ..., ie. '4 ' = I S!•S\ l• ({ •r d 9 .- I SEn IN '1 0liigAi9 ; s \ �� '�p ge31 I 1 ,,;:711‘ 10 11111 i i _ i i4 MATCHLINE;TA 6.00 \11' '''' ' \ �B� �ai3 3 SEE SHEET 6 3i MA • ` SIABWO 779 ©"i®'®®® 0000 0 € 008 SEES EETB idJIt 1-1 o ggimIUitl )L� g i 5 ! �4 a pm N 42 a N 1 i I �H 1 FINAL BID SET PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT-PHASE II