CHANGE ORDER MEMORANDUM
March 28, 2025
To: Stephen Manganiello,
Director of Engineering&Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corporation
Project: Paradise Creek Water Quality and Community Enhancement Ph. II
CIP No.: 19-11
Subject: Change Order No.35
Change Order No.35 provides for:
Proceed with installation of 4 traffic loop detectors for Westbound Paradise Valley Road at the intersection of
Paradise Valley Rd and E.Plaza Blvd.
Payment for this change order was agreed upon at a lump sum price.
Supporting Information:
The plan revisions provided by HDR on February 14,2024,relocated the precast box culvert approximately 4'
North of the originally planned location to avoid conflicts with the existing VCP sewer main.The realignment
moved the trench zone to conflict with the existing traffic loop detectors and the homerun to the traffic signal
system for Westbound traffic on Paradise Valley Road.
Time Adjustment:
One(1)working days is to be added to the contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$3,150.00.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The
supporting documentation is on file with the project records.
Jash Johnson, PPC 4/1/25
oject anager Date
CALIFORNIA —
NATIONAL airy
INCORPORATED
PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT PH. II CHANGE ORDER NO.35
CIP NO. 19-11 March 28,2025
Contractor: Wright Construction Engineering Corp
2625 S Santa Fe Ave
San Marcos, CA 92069
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
One(1)working days is to be added to the contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with installation of 4 traffic loop
detectors for Westbound Paradise Valley Road at the intersection of Paradise Valley Rd and E. Plaza
Blvd.The additional work includes but is not limited to placing traffic control devices,sawcutting and
installing traffic loop detectors and connecting the loop detectors to the existing traffic signal system.
The total amount for all labor, material,equipment and all other associated work is$3,150.00.
Recommended by Project Manager:, osh Johnson, PPC Date: 4/1/25
By signing this Change Order the Contrac or confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor: Date:3/28/25
(Print Name and Title)Jason Merritt-Project Manager ,�/
Approved by Project Coordinator: l "f 4 Date:
Approved by Assistant Director of E&PW:liir Date:
Approved by City Engineer: '„�� " 'r . ✓ Date:
Approved by City Manager: Date:
(Required for change orders$25,000 and above)
CONSTRUCTION ENGINEERING CORP.
II(IRSI •S•SIS3
PROJECT CHANGE ORDER REQUEST #47
PROJECT NAME Paradise Creek Water Quality &Community Enhancements- Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 47
REQUESTING PARTY City of National City DATE OF REQUEST February 26, 2025
PROJECT MANAGER Randy Garcia CONTRACTOR Wright Construction Eng. Corp
OWNER City of National City ENGINEER Javier Alexandro Yescas
PROJECT DETAILS
Earthwork, Drainage System, Rip Rap, Flatwork, Headwalls. Precast Boxes, Hydroseed, Fencing,
Asphalt, Turf Reinforcing Mat & Culvert Grates
PROJECT CHANGE REQUEST DESCRIPTION
DESCRIPTION
OF CHANGES Installation of 4 additional traffic loops in westbound lane of Paradise Valley Road
NEEDED
REASON FOR Traffic Loops removed during installation of precast box culvert
CHANGE
List all attached documents which support the requested change and justify any increased cost and time.
SUPPORT& See Attached Quote & Force Account Analysis Sheet
JUSTIFICATION
DOCUMENTS
SPECIFICATIONS Special Provisions,Section 3-3 &Section 6-6.2
IMPACT OF New Traffic Loops Installed
CHANGE
RISK
MANAGEMENT
PROJECT NAME Paradise Creek Water Quality & Community Enhancements- Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 47
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
ORIGINAL PRICE $2,610,245.00 ORIGINAL TIMES 120 Working Days
NET CHANGES OF NET CHANGES OF PREVIOUS
PREVIOUS CHANGE ORDERS $624,038.44 CHANGE ORDERS IN DAYS 99 Working Days
NET INCREASE/DECREASE Increase $3,150.00 NET INCREASE/DECREASE Increase 2 Working Days
TOTAL CONTRACT PRICE TOTAL CONTRACT TIME
WITH APPROVED CHANGES $3,243,283.44 WITH APPROVED CHANGES 219 Working Days
CHANGE REQUEST PRIORITY LEVEL PRIORITY LEVEL JUSTIFICATION
PROJECT CHANGE ORDER DISCUSSION DOCUMENTATION
CHANGE HAS BEEN DISCUSSED WITH:
NAME&TITLE NAME&TITLE DATE
By
By
By
By
By
By
--T----
RECOMMENDED BY APPROVED BY
ENGINEER OWNER
DATE DATE
t- . ...._..._.....
ACCEPTED BY REVIEWED BY I
CONTRACTOR / -'..-"-" FUNDER
DATE February 26, 2025 DATE I
lit
•rtiititi eti raj'1
Estimate Breakdown
Dates: 2/26,25
Project Name Paradise Creek MItiption i Community Enhancements-Phase 2 Work Sheet No.
Prime Cormattcr Wright Construction Engineering Corp Orange Order Request 28
SuPPlier
Project No. CIP 19 11
LABOR Rates Hewn Total EQUIPMENT Rates Hoes Total SUBCONTRACTOR/Materials
Class Name Model Type Per Nr. Tot.hrs. Desorption inv.a Quart. Unit
Laborer Owls Storer $ 71.16 $ 106.74 0 0 Foreman Truck 00-06 $ 41.96 0 $ Perry Electric.Additional Loops RFC 1 4 5 250 OC 5 3.909 iX,
Laborer lose Reya $ 71.16 $ 106.74 0 0 305 Mird Excavator 0250 $ 55.25 0 $ -
Laborer Gustavo Marquez 5 71.16 $ 106.74 0 0 Caterpillar 314 0302158 $ 77,90 0 s -
Laborer Tory Marquez-Zermeno $ 71.16 $ 106.74 0 0 10 Wheel Dump Tnock 3631. $ 94.12 0 $ -
Laborer Emesto Murrill 5 71.16 $ 106.74 F-150 Tool(loan.* '06-12 $ 41.96
Laborer Robert Valle 5 71.16 $ 106.74 F-350 tool Bra Truck 0012 '$ 41.96" '$
Laborer Nick Hunter $ 71.16 $ 106.74 Ram 2500 Work Truck 06-12 '0 41.96 '$
$Laborer Jose htlf.lei $ 71.16 $ 106.74 Walk Behind Concrete Saw 20-33 $ 19.42 •
Laborer Julio Silva 5 71.16 $ 106,74 liCompactor 0-250 $ 8 $.01 •
laborrer Daniel Gonzales $ 71.16 $ 106.74 Water Trailer 10-020 5 7.34 5
Laborer Steam Gonzales 5 71.16 $ 106.74 Vitra Plate Compactor 0-250 $ 5.38 $
Laborer.Apprentice Dominic Drew $ 71.16 $ 106.74 2590 SIdd Steer(7311P1 .2159 .5 56.06
.
Carpenter Victor Crut $ 77.12 $ 115.68 279 Sbd Steer(66HP) A $ 4993 $ -
Carpenter Brian Nidrolson $ 77.12 $ 115.68 Roof Mounted Arrow Board RM $ 1.14- I -
Operator Steve Lofts $ 94.48 $ 141.72 F-250 Arrow Truck 00-06 $ 37.19 5 -
Operator Randy Matthews $ 94.48 $ ietn Air Compressor 165 025-045 --•-$ 47.34 -$ .-
Operator Stew Falkenstein $ 94.48 $ 141.72 Air Tools 60 5 177 $ -
Operator Nick Shearer $ 94.48 $ 141.72 Drum Roller 1150 $ 32.35 5 -
Carpenter Wes Wright $ 77.12 $ 115.68 Cutoff Saw 0-10 '$ 4.29' $
Small Tools 045-060 $ 0.36' $
Generator 0033.015 $ 12.34 $ - ,
110 High Cycle Vibrator EVHO $ 1.36 5 -
Water Truck 20-28 $ 57.26 $
Arc Welding Machine 250-500 $ 15.52 $
OCT Dump Tooth 2E00- $ 73.10 S -
314 Excavator 0302CL8 $ 77.90 $ -
3361 Excavator 0351F $238.96 $ -
480 Excavator 3010 $224.96 $ .
415 Skip Loader 1850E2 5 63.21 $ -
9705 Loader 2370 5 215.52 $ -
Surcharge 19% $ - Subtotal $ - -Subtotal 5 Subtotal $ 3,000.00 Markup 2C% $ - - Standard Mario, -Mart. 15% $ Smodard Markup Markup o% t 150.00
Total $ - i Total $ - Total $ 3,150.06 ITEM 1 Arnoont 1 % I hierkup Total
Descri cannot Work A Notes: I certify that the IS - I 0% 1 5 - $ •
•Cost Breakdown fa Replacement of Traffic Loops at Intersection in Westbound Lanes changes are accurately Equicvnent
-
reported for the Labor $
Attached Is the cost he the completion of work Re force account analysis work indicated Material/SUBCONTRACTOR $ 3,150.00
along with any additiorol documents pertaining to the cost of all wok Total(Equip..labor,Materials,Subbokractor) $ 3,150.00
Date: 2/26/25
X: Total,s Report I$ 3,150.00
EL C
RFC 1
Paradise Valley at Plaza Pullbox Relocate
Attn: Jason Merritt Page 1 of 1
Date: 2/26/2025
Item No. Description Qty Unit Unit Price Ext
1 Added Loops Westbound Paradise Valley 4 EA $ 750.00 $ 3,000.00
Total Amount $ 3,000.00
EXCLUSIONS
*Construction permits, inspection fees, encroachment permits, noise permits
* Bond
*Raising or lowering of conduits
*Utility Company fees and support of exisiting utilities.
*Repair or investigation of existing conduits, conductors, or systems
*Repair of existing landscape, tree work, or other improvements
*Demo or removal of existing foundation
*Night or weekend work
*AC or Concrete Repair
*Responsibility for function of system components
*Traffic Control Permits or Plans
*Stubouts
*Rock excavation or dewatering
*Any items of work not specificlly listed in the above pricing breakdown
*Design or engineering
Todd Perry
President
Contractor's License#747931(C-10) PO Box 710130 Santee,CA 92072 (619)449-0045/(619)449-0511 fax
11— B do us.lrn—r-LB yrto�. sw• ore
",reran 7 tC1 sn sirs anima all or ea a aim�:wx..v.nwro., ...eor.wm.w..,.
—
mann
frfailFer
CO kin IVNOLLVN AO ALTO (ice Wm/ma,
9 03r0.a091 6.9 NYld - tlnsg\O�tl ,R i
WNr1S OINKV. \ -•. ' / i 3 _ ' . n
31EOtld Of/199EN11330.00449.Md. ):A........-yam �. o04099 ; � / v: i
/� zv a
II 3SVNd•S1N3W3ONVHN3 A1INOWWOO •311am e
V/ ONV ALIvfO a31VMM33MO 3SIOVavd -� � .......\/.��/• i»b+w,a� ahr ae 0 .7 Z� � ' E
nvu9wM.uc, awwr. _ - t IWVaIYi: 'd ........_ ' �iZ.c e'�-` A
1,001,13Ma». _
_ aN.3.anon 1 aN
V 3DVMO3lipgdS3anrnuwvuao SBU }�4R"Ya�BM NI ® 11nili.t,o'5im '1\ , "' ....Mineii'•� �� �j�, Airt7t1}-I�� .�• SO
<
ousts r weOV de Sdoo o e� i 'o...,.a�..,a� No3..aoa `5/' ' ��� �i�A : .
.,,tic,uava,a.araa,nuwoma.�rauaeweia++u— - I M--l N► L'i-- \\ .\ „w3s.•"'°u.0ub ,,- . � r.._�� / • ` `."�
iaaMaa a //i J� a�w i • s'�
a3a 3.tra wetla.wa masm0(rem as IYHoud01 ..� laa,d«t,a,a.d , �,.i ,- �; , t4. .w�,,,r .�
M VON.m3rcs.nux0 —.-- --• ` / �"3a,"n,woes d�\ /J/�/// - K- �v«. mom• ♦�i:�• �N �
O ,o-a asaac aid 31mnn...mvaw� /wod a m etn. v\. / % %/� E,3 I li•`•�'l � � h
410413
roe3uaaama3>wdaeu wwa.3oaa,0 ® � 1=.4.��„ i//, /� ,
j.
p31.aa.atl.I uaam nONENMA a3d,aa,40 0' /�j �, 'a �ae0 aaa ' n3Ma ash ® /
(rai 0 B I o 1d01.3M �� 5 3•..•• / ..��ise .� \%�� ` 1n3 UIr3 W / /
tLa a3e im utfra>na,nan,wu irNxO ..� % .-� . Iin apY„O lawn, r / / ...
N
•
i I
/ i at`"
S
as emo au as. d dwa� z
//
I / F / IrmS31ON Nouont1SNOO m m- -'.../...m''.. � /
� N a3 . / 'aI/ / amafi
i : / »a�a30a33a3,1an.d
8 3n ION.
aaan . /
® v aRw / /� // �
b
z ' // .,, 1
NYaa
00•9 oa9 00,1 31IdOLld oo,e OO.z _ ooal 2 1 2
m a3n. - {{ I 1,31,5 o El
1 ziaoN.oz=-I ! F' 3 1 t I. E s 7-; , 3-':
44 Y Y -mOg 43 ' ! ( xxo y
E t F OS;
z m
3 a�3z,aa= aw,s ,a3 aaa • s ,�ww1
K.
as- 91,13
'g
091 '"'s a.«,,.a 0.390m1.e
09L
14'`" � na,
m xe,. a,na -
• -
------- -----
OLL 3.saaoa a3u.33ay.... a � aa3 a� �3 �" ^ ^ oeE s
.33aa,o do wm, as'3's/suu«ru i'id ` a3,3,srcs n3,.,.,a.-Issrza-- c
low 4X ' g
•
081. 1 09l K i