CHANGE ORDER MEMORANDUM
March 28,2025
To: Stephen Manganiello,
Director of Engineering&Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corporation
Project: Paradise Creek Water Quality and Community Enhancement Ph.II
CIP No.: 19-11
Subject: Change Order No.36
Change Order No.36 provides for:
Proceed with investigating and repairing small sinkhole at approximate station 2+30 within project limits.
Payment for this change order was determined by force account.
Supporting Information:
After a rain event a small sinkhole on the North side of Paradise Valley Road was discovered within the
dirt/sidewalk area.As part of the project scope a section of pipe was called to be abandoned in place. It appears
water found a path to the abandoned pipe.The abandoned pipe was removed and sinkhole backfilled.
Time Adjustment:
Zero(0)working days are to be added to the contract.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of$1,078.68.
The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The
supporting documentation is on file with the project records.
?/ct"--� Josh Johnson, PPC 4/1/25
Projeager Date
•
-- CALIFORNIA —0
NATIONAL CIrp
l:3)1 �
INCO RPOR ATBU
PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENT PH. II CHANGE ORDER NO.36
CIP NO. 19-11 March 28,2025
Contractor: Wright Construction Engineering Corp
2625 S Santa Fe Ave
San Marcos, CA 92069
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Zero(0)working days are to be added to the contract.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with investigating and repairing
small sinkhole at approximate station 2+30 within project limits. The total amount for all labor,
material,equipment and all other associated work is$1,078.68.
Recommended by Project ManagerG osh Johnson, PPC Date: 4/1/25
By signing this Change Order the Contra or confirms that he/she is completely familiar with and has fairly
negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor: ��.��� Date:4/1/25
(Print Name and Title)Jason Merritt-Project Manager
I
Approved by Project Coordinator: 1_ Date:
Approved by Assistant Director of E&PW: V Ur r Date:Af
Approved by City Engineer: ,�tZ� Date:
Approved by City Manager: �'''�� Date:
(Required for change orders$25,000 and above)
•. CALIFORNIA +�*
NATIONAL CflIr
any
INCORPORATED
PARADISE CREEK WATER QUALITY AND COMMUNITY ENHANCEMENTS - PH. II CHANGE ORDER NO. 36
CIP NO. 19-11
DATE: February 19,2025
WORK PERFORMED BY: Wright Construction Engineering Corp.
DESCRIPTION OF WORK: Investigate and repair sinkhole at approximate station 2+30
ACCOUNTING FOR TIME, MATERIALS,AND EQUIPMENT
IIABOR Unit Qty Wage Total
1) Superintendent HR 2.00 77.12 154.24
2) Laborer HR 2.00 71.16 142.32
3) Laborer HR 2.00 71.16 142.32
Sub-Total Labor: $ 438.88
Labor Burden(19%): $ 83.39
Labor Markup(20%): $ 87.78
TOTAL LABOR:
EQUIPMENT Unit Qty Rate Total
1) Cat 314 HR 2.00 77.90 155.80
2) Utility Truck HR 2.00 41.96 83.92
3) Air Compressor HR 2.00 47.34 94.68
3) Dump Truck HR 1.00 73.10 73.10
Sub-Total Equipment: $ 407.50
Equipment Markup(15%): $ 61.13
TOTAL EQUIPMENT: $ 468.63
SUB TOTAL: $ 1,078.68
GRAND TOTAL: $ 1,078.68
CONSTRUCTION ENGINEERING CORP.
LICENSE ♦ENSISS •
PROJECT CHANGE ORDER REQUEST #49
PROJECT NAME Paradise Creek Water Quality &Community Enhancements- Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-11 CHANGE ORDER NO. 49
REQUESTING PARTY City of National City DATE OF REQUEST March 17, 2025
PROJECT MANAGER Randy Garcia CONTRACTOR Wright Construction Eng. Corp
OWNER City of National City ENGINEER Javier Alexandro Yescas
PROJECT DETAILS
Earthwork, Drainage System, Rip Rap, Flatwork, Headwalls. Precast Boxes, Hydroseed, Fencing,
Asphalt, Turf Reinforcing Mat & Culvert Grates
PROJECT CHANGE REQUEST DESCRIPTION
DESCRIPTION
OF CHANGES Installation of 3- loads of dirt and compaction of soil to fill void caused by abandoned pipe
NEEDED
REASON FOR Sinkhole occurred during February 14, 2025 Rain Event
CHANGE
List all attached documents which support the requested change and justify any increased cost and time.
SUPPORT& See Attached Force Account Analysis
JUSTIFICATION
DOCUMENTS
SPECIFICATIONS Special Provisions,Section 3-3 &Section 6-6.2
IMPACT OF Had to delineate area off from public and excavate around area to install soil to fill voids
CHANGE
RISK
MANAGEMENT
PROJECT NAME Paradise Creek Water Quality & Community Enhancements- Phase II
LOCATION OF WORK Corner of Paradise Valley Road & Plaza Blvd.
CONTRACT NO. CIP 19-1 1 CHANGE ORDER NO. 49
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
ORIGINAL PRICE $2,610,245.00 ORIGINAL TIMES 120 Working Days
NET CHANGES OF NET CHANGES OF PREVIOUS
PREVIOUS CHANGE ORDERS $649,345.74 CHANGE ORDERS IN DAYS 101 Working Days
NET INCREASE/DECREASE Increase $1,078.67 NET INCREASE/DECREASE Increase 0 Working Days
TOTAL CONTRACT PRICE $2 3,259,590.74 TOTAL CONTRACT TIME 221 Working Days
WITH APPROVED CHANGES WITH APPROVED CHANGES
CHANGE REQUEST PRIORITY LEVEL PRIORITY LEVEL JUSTIFICATION
PROJECT CHANGE ORDER DISCUSSION DOCUMENTATION
CHANGE HAS BEEN DISCUSSED WITH:
NAME&TITLE NAME&TITLE DATE
By
By
By
By
By
By
RECOMMENDED BY APPROVED BY
ENGINEER OWNER
DATE DATE
ACCEPTED BY $ REVIEWED BY
CONTRACTOR � FUNDER
DATE March 17,2025 DATE
•
Estimate Breakdown
Dates: 2/19/25
Project Name Paradise Creek Mitigation RCwnmuolty Enhancements-Phase 2 Work Sheet No.
Prime Contractor Wright Construction Engineering Corp Change Order Request 49
Supplier
Project No. OP 19-11
LABOR Rates Noun Total EQUIPSENT Rates Hoes Total SUBCONTRACTOR/Materials
Class Name S.T. O.T. S.. 0.. S.T. O.T. Mosel Type Per Hr. Tot.hrs. Descriptkn Irw.R Quart. Unit
Laborer Chris Suter $ 71.16 $ 106.74 $ 142.32 Foremaos Truck 00-06 $ 41.96 $
laborer lose Reps $ 71.16 $ 106.74 305 Mini Excavator 0250 _$ 55.25_ _$ -
Laborer Gustavo Marquez $ 71.16 $ 106.74 Caterpillar 314 0302CLR $ P.90 $ 155.80
Laborer Tory Marquez-Zermeno $ 71.16 $ 106.74 10 Wheel Dump Truk 3480. $ 94.12 $ -
Laborer Ernesto Murrill $ 71.16 $ 106.74 F-250Too4 Box Truk 06-12 .$ 41.96 $
laborer Robert Valle 5 71.16 $ 106.74 $ 142.32 F-350 toot Box Truck 06-12 $ 41.96 $ 83.92
laborer Nick Hurter $ 71.16 $ 106.76 Rein 2500 Work Truk 06-12 $ 41.96 $
laborer Jose Marquez $ 71.16 $ 106.74 Walk Behino Concrete Saw 20.33 5 19.42 $
Laborer Julio Silva $ 71.16 $ 106.74 1/Cornpactor 0-250 s$ 8.01 -5 -
Laboner Daniel Gonzales $ 71.16 $ 106.74 Water Trailer Gonzales
_$ 7.34 $ _ -
Laborer Steven Guales $ 71.16 $ 106.74 Vibra Plate Compactor - 0-250 $ 5.38 $ -
Laborer-Apprentice Dominic Drew $ 71.16 $ 106.74 259D Skid Steer(73HP) 2159 $ 56.06 $ -
Carpenter Victor Cru $ 77.12 $ 115.68 2795Hd Steer(66HP) A $ 48.93 $ -
Carpenter Brian Nicholson $ 77.12 $ 115.68 $ 154.24 Roof Mounted Arrow Bwtd RM $ 1.54 $ -
Operator Steve Loftis $ 94.48 $ 141.72 F-250 Arrow Truck O-06 $ 37.19 $ -
Operator Rarely Matthews $ 94.48 $ 141.72 Air Compressor 175 025-045 $ 47.34 $ 94.68
Operator Steve Falkenstein $ 94.48 $ 141.72 Alr Tools 60 $ 1.P $ -
Operator Nick Shearer $ 94.48 $ 141.72 Drum Roller 1150. $ 32.35 $ - _
Carpenter Wes Wright $ 77.12 $ 115.68 Cutoff Saw 0-10 $ 4.29 $
Small Tools 045-060 5 0.36. $Generator boa-ois $ 12.34 $ -
_
110 High CVde Vibrator EVHD $ 1.36 $ -
Water Truck 20-28 $ 57.26 $
Arc Welding Machine 250-500 $ 15.52 $
SCY Dump Truck 2A3L $ 73.10 $ 73.10
314 Excavator 0302CLR .$ 77.90 $ -
336F Excavator 0351F $238.96 5 -
_ 480 Excavate. 3010 $226.38 $ -
415 Skip Loader 1850F2 $ 63.21 $ -
970Floader 2370 $215.52 $ -
Surcharge 19% $ 83.39 Subtotal $ 438.88 $ - Subtotal 5 407.50 Subtotal $
Markup 20% 67.78 $( - Standard Markup MarNq 1$% $ 61.13 Standard Marup Markup 15% $
Total 610.05 $ - Total $ 468.63 Total $ •
REM I Maw* I % Markup Total
Description Of Work&Nobs: Icertify lint the $ 0% S - $ -
Cost Breakdown for changes are accurately Egdpment $ 468.63
reported for the labor $ 610.05
Attached is the coat for the completion of work Ma force account analysis work indicated Material/SUBCONTRACTOR $along with with any additional documents pertaining to the cost of all work To6l(Egolp.,labor,Materials,SubcortraxSarj $ 1,078.67
Date: 3/17/25
X - Total This Report 15 1,078.67