HomeMy WebLinkAboutProject Professionals Corporation - P2 Sewer Upsizing Project - CIP No. 24-03 - Change Order No. 7 - 2026 P C PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM March 9,2026 To: Steve Manganiello,TE Director of Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado �3 Senior Construction Manager Project Professionals Corporation Project: P2 Sewer Upsizing Project CIP No.: 24-03 Subject: Change Order No.7 Change Order No. 7 provides for: Documenting the contractors requested adjustment to the required potholing sequence. Supporting Information: Under Contracts Specification Section 5—Utilities,all utility potholing is to be completed prior to beginning construction to avoid conflicts,rework,and interruption of production.At the contractor's request,the City acknowledges that the contractor will proceed with potholing concurrently with construction activities rather than completing all potholes in advance.This does not waive any contract requirements and sole acknowledges the contractor's chosen means and methods.The contractor accepts full responsibility and liability for all impacts resulting from incomplete potholing,including,but not limited to utility conflicts,delays,damages,re-excavation, additional traffic control,re-sequencing,or any other operation disruptions caused by encountering utilities during construction. Time and Cost Adjustment: This is a no-cost, no-time change order. 3/9/26 Senior roject Manager Date 4)- CALIFORNIA —� NATIONAL CITY alaM t _ INCORPORATRV P-2 Sewer Upsizing Project CHANGE ORDER NO.7 CIP NO.24-03 December 9,2025 Contractor: Burtech Pipeline, Inc. 1325 Pipeline Drive, Vista,CA 92081 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero(0)working days are added to contract time. Cost of Change Order: This change order documents the contractor's requested adjustment to the required potholing sequence.Under Contracts Specification Section 5—Utilities,all utility potholing is to be completed prior to beginning construction to avoid conflicts,rework,and interruption of production.At the contractor's request,the City acknowledges that the contractor will proceed with potholing concurrently with construction activities rather than completing all potholes in advance.This does not waive any contract requirements and solely acknowledges the contractor's chosen means and methods. eqf vAi ii 4t es 51n owr or glans f rn.w+ue ou4 Under this change ordeOle contractor accepts full responsibility and liability for all impacts resulting from incomplete potholing, including, but not limited to utility conflicts,delays,damages,re-excavation, additional traffic control, re-sequencing,or any other operational disruptions caused by encountering utilities during construction.The contractor agrees that no additional compensation,delay claims,or time extensions may be sought for issues arising from this modified sequencing and that all schedule or cost impacts related to potholing performed after start of construction are solely the contractor's responsibility. This dv' %ot ' el five v'i%ii S no} shy+ 4ttAhs or- *^eve bt4cli 00 • Nothing in this change order modifies or waives the contractor's responsibilities under Special Provisions Section 5-1.27.The contractor remains fully responsible for locating, identifying,and verifying all utilities shc"."^ an Qom: and for notifying the Engineer of any conflicts prior to performing work in accordance with the contract documents.This is a no-cost, no-time change order. P2 Sewer Project,CIP No.24-03 Change Order No.7 1219/25 Page 2 of 2 Recommended by Project Manager: _Alt? --- 3/9/26 Date: By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment,materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment,materials,labor,supervision,overhead,fees,bonds,insurance,profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Date: (Print Name and Title) Approved by Project Coordinator: ee Date: Approved by Assistant Director of E&PW• Date: Approved by City Engineer: .... /� Date: Approved by City Manager: Date: (Required for change orders$25,000 and above)