Loading...
HomeMy WebLinkAboutProject Professionals Corporation - Las Palmas Pool Modular Buildings - CIP No. 24-18 - Change Order No. 4 - 2025 P P C PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM August 29,2025 To: Stephen Manganiello, Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Las Palmas Pool Modular Buildings CIP No.: 24-18 Subject: Change Order No.4 Change Order No.4 provides for: Proceeding with an additional inspection and inspection report for the second foundation concrete pour involving the stem wall portion rebar and embed plates. Payment for this change order was determined by agreed upon lump sum. Supporting Information: The project was initially bid with a concrete masonry unit(CMU)stem wall foundation which only required one concrete/rebar inspection before stacking the CMU blocks.With the project approved foundation being a full concrete stem wall this required two concrete/rebar inspections.One for the footing of the stem wall and one for the stem wall. Time Adjustment: Zero(0)working days are to be added to the contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of 2,000.00. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. os Johnson, PPC 9/8/25 Pr jest Hager Date +9-- CALIFORNIA -- ALTI ONAL CITAP O ORA INCORPORATIlro LAS PALMAS POOL MODULAR BUILDINGS CHANGE ORDER NO.4 CIP NO.24-18 August 29.2025 Contractor: Blok Modular Constructors,Inc. 404 N.2nd Avenue Ste C Upland,CA 91786 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero(0)working days are be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with providing an additional inspection and inspection report for the second foundation concrete pour involving the stem wall portion rebar and embed plates.The total amount for all labor,material,equipment and all other associated work is$2,000.00. _Recommended by Project Manager: Johnson, PPC Date: 9/8/25 By signing this Change Order the Contract confirms that he/she is completely familiar with and has fairly negotiated its price,terms and conditions.If this Change Order is approved,Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit,etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. ,,.,ry spied by Fred Renton Agreed and Accepted byContractor: DN.,:.us. ( 8 P Fred Rienton �'",deepp�,.da'Vc.pge,aa-•Date: — Print Name and Title) bd na Canmuctvs nc.,cr,—Rem ^..etc.2025.09.0215:17:45-071V Approved by Project Coordinator: /g6/w.44, Date: Approved by Assistant Director of E&PW!ill Date: Approved by City Engineer: ,,,r6".- 2 Date: Approved by City Manager: Date: (Required for change orders$25,000 and above) CALIFORNIA - NATI.oAL ciTir rNCa p V ED LAS PALMAS POOL MODULAR BUILDINGS CHANGE ORDER NO. 4 OP NO. 24-18 DATE: August 29,2025 WORK PERFORMED BY: Blok Modular Constructors,Inc. DESCRIPTION OF WORK: Additional inspection and report ACCOUNTING FOR TIME,MATERIALS,AND EQUIPMENT Unit Qty Wage Total 1) Site visit,Inspection and report HR 8.00 200.00 1,600.00 2) Round trip flight/car/parking LS 1.00 400.00 400.00 Sub-Total: $ 2,000.00 TOTAL: $ 2,000.00 GRAND TOTAL: $ 2,000.00