Loading...
HomeMy WebLinkAboutProject Professionals Corporation - 3131 Valley Road Storm Drain Repair - CIP No. 24-21 - Change Order No. 1 - 2025 P C PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM June 18,2025 To: Stephen Manganiello Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Randy Garcia Senior Construction Manager Project Professionals Corporation Project: 3131 Valley Road Storm Drain Repair CIP No.: 24-21 Subject: Change Order No.1 Change Order No. 1 provides for: The concrete encasement of the existing ACP waterline in lieu of replacing the water line. Payment for this change order will be as agreed upon at a lump sum price. Supporting Information: During the initial excavation to expose the 6"ACP waterline for removal and replacement,the Contractor recommended concrete encasement of the waterline in lieu of removal and replacement. However,after surveying it was determined that the top of the existing ACP pipe would only have a 4"clearance to the bottom of the newly installed RCP storm drain pipe.The RFI#1 response directed the Contractor to shutdown the waterline and remove and replace the pipe as per contract. Upon further review of the elliptical pipe layout,the Contractor determined that a minimum of 10"of clearance would be available from the top of the ACP pipe to the bottom of the elliptical storm drain pipe.The Contractor was field directed by the City to encase the ACP pipe using 4500 PSI concrete in lieu of removal and replacement. Time Adjustment: Zero(0)working days are to be added to the Contract. Cost Adjustment: The cost for this change in the scope of work was determined by providing a credit for the original contract scope of work removing and replacing the pipe and applying the additional cost for encasing the pipe.The total credit for this change in the scope of work has been agreed upon at a lump sum price of($9,427.65). The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. 06.18.25 Project Manager Date ,... CALIFORNIA -- NATIONAL CITY` INCORPORATED 3131 VALLEY ROAD STORM DRAIN REPAIR CHANGE ORDER NO. 1 CIP NO.24-21 June 2,2025 Contractor: Rove Engineering 8291 Aero PI.,Ste 100 San Diego,CA 92123 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0)working days to be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with the encasement of the existing 6"ACP waterline in lieu of removal and replacement of the waterline.The additional work includes but is not limited to excavating to expose the existing line, pouring the encasement,and backfilling around the waterline.The cost for this change in the scope of work was determined by providing a credit for the contract work to remove and replace the pipe and applying the added cost to encase the waterline.The total credit for all labor, material,equipment and all other associated work is($9,427.65). Recommended by Project Manager: \Zf,,,�' l�0- Date: 06.16.25 By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price,terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Date: 06�1$�2025 (Print Name and Title) Approved by Project Coordinator: igCLs c,,oi;,,,,,ix Date: Approved by Assistant Director of E&PW: AJ� Date: — ifi Approved by City Engineer: �i2� ? Date: Approved by City Manager: Date: (Required for change orders$25,000 and above) CALIFORNIA -+ NATY.01N .L airy. ajj INCORPORATED 3131 VALLEY ROAD STORM DRAIN REPLACEMENT CHANGE ORDER NO. 1 CIP NO. 24-21 DATE: May 27,2025 WORK PERFORMED BY: Rove Engineering DESCRIPTION OF WORK: Concrete encasement of existing ACP waterline ACCOUNTING FOR TIME, MATERIALS,AND EQUIPMENT LABOR Unit Qty Wage Total 1) Operator/Laborer HR 4.00 177.25 709.00 Sub-Total Labor: $ 709.00 TOTAL LABOR: $ 709.00 MATERIALS Unit Qty Rate Total 1) Concrete ready mix CY 3.00 257.33 771.99 2) Restocking fees ACP adaptors(Ferguson) LS 1.00 1,560.00 1,560.00 Sub-Total Materials: $ 2,331.99 TOTAL MATERIALS: $ 2,331.99 EQUIPMENT Unit Qty Rate Total 1) Excavator(CAT 308) HR 4.00 132.84 531.36 Sub-Total Equipment: $ 531.36 TOTAL EQUIPMENT: $ 531.36 SUB TOTAL: $ 3,572.35 CREDITS Unit Qty Rate Total Line 11 Replace existing 6"private water line LS 1.00 (13,000.00) (13,000.00) Sub-Total Credits: $ (13,000.00) TOTAL CREDITS: $ (13,000.00) GRAND TOTAL: $ (9,427.65)