HomeMy WebLinkAboutProject Professionals Corporation - Police Department Walkway Waterproofing Improvements - CIP No. 24-23 - Change Order No. 1 - 2025 P C PROJECT PROFESSIONALS CORPORATION Cif Y t r iiikTiONAL CITY CHANGE ORDER MEMORANDUM March 6,2025 To: Stephen Manganiello, Director of Engineering&Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Police Department Walkway Waterproofing Improvements CIP No.: 24-23 Subject: Change Order No. 1 Change Order No. 1 provides for: Proceeding with additional removal and replacement of joint sealant in areas adjacent to original bid limits. Payment for this change order was determined by bid unit price and measured LF. Supporting Information: During construction additional areas of damaged joint sealant adjacent to the work area were discovered and added to the scope.See attached exhibit for approximate locations. Time Adjustment: Zero(0)working days are to be added to the contract. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at unit bid price of$18 LF for an additional 93 LF for a total of$1,674.00 The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable.The supporting documentation is on file with the project records. Tosh Johnson, PPC 3/14/25 rojec Manager Date CALIFORNIA -'. NkTIONAL Cirp INCORPORATED POLICE DEPARTMENT WALKWAY WATERPROOFING IMPROVEMENTS CHANGE ORDER NO. 1 CIP NO. 24-23 March 6,2025 Contractor: JC Construction 12247 Hibbing Street Artesia,CA 90701 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero(0)working days are be added to the contract. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with additional removal and replacement of joint sealant in areas adjacent to bid limits for an approximate 93 additional linear feet. The total amount for all labor, material,equipment and all other associated work is$1,674.00. Recommended by Project Manager.?/ Josh Johnson, PPC Date: 3/14/25 By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Date: 03/13/2025 (Print Name and Title) Joao Cardos wner JC construction Approved by Project Coordinator: g gdgicfar'd Date: 0/7-//5/202 Approved by Assistant Director of E&PW: Date: Approved by City Engineer: 7 9,..16ss,....,x....x.......4.../Z Date: Approved by City Manager: Date: (Required for change orders$25,000 and above) I i JC CONSTRUCTION ••16- PHONE:562-544-9195 EMAIL:jcconstruction95@gmail.com ADDRESS:12247 Hibbing St, Artesia, CA 90701 Change Order Request National City Police Department Walkway Waterproofing Improvements Change Order Number: 01 Original Scope of Work: The general scope of work is to remove and replace approximately 1,940 linear feet of joint sealant along the National City Police Department walkway. Area depicted in Exhibit A (see attached). Reason for Change: Requested by the Police Department. Entire walkway surrounding the building was resealed except for two smaller areas at each gate entrance. Proposed Change: Removed and replaced an additional 93 linear feet of joint sealant located at gated parking area entrances (see attached). Attachments: (photos, documents, plans, etc) • Exhibit A - original scope of work. • Exhibit A- amended to reflect change. Joao Cardoso, Owner n 1€Y18n4,9:16AM Exhibit A - Scope of Work paill..t,r , .-. .. 4„..,..- . . ... ,,,,,,,,,, i 33.3 a + ,, . �R a i E�� — — - - - x.: "'1 hRemove and 4W xt 2=h St W t 2t❑,t ,w 12th St .. W 1 2te St _ replace joint ,� 1 '- sealant within gated parking _ >t � 1V area ,. C i c © t7 i �� > - t�1 99t t 44 imiil 1 ri l . t •` iallp } I . F k 111111111111 { s C s 1 U J,' .•vaO4,. 0 t N sump ding + � : FieMa•st F n : It m _ Nat• 7 GfSo nCaPfa ap Ii, t7 ,t m "*r' co S 1 i -' - - 1111111111MMINIIIII $ •• INIMINIONagnialli sty� n ,t�, l$ 44 Fi. W t l Remove and �� • l y replace joint ,> z• ;� . , ` sealant - _� ri ,, '�%" ` . k .c•Center Dr Civic Center Dr. „j _li T!s ) „a peel I 4 V ' Alla '—a-'—.....is I;r' https:/lwww.google.cotnfmaps/@32,6717973,-117.1059585,215a,35y,341.47h,0.24t/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDIOMTAxNS4wIKXMDSoASAFQAw%3D%3D 2/3 Exhibit A - Modified to Reflect Change 1 ♦ Ii , 4k Illg:414.0.40; ----.-----L ' iiireN aNiM - ,xa o'h-'1 ZY I' iir - • ,' , .-,,z a- l..ram r-.aKr` "�..`"^.'Y , — — — r _ _�k 1a Remove and 't •+ft 21 hSf 1, L 1�, 4.�,i Diu i - _._,. :. replace joint _, ,: =�;� ' sealant within - ` ' , gated parking area "c, - - - L. , 4.aa - ,asy r 1. 1 ,,,,.:„ er 1 . / • U _ 'p ( - ' . _ . I _i Removed and ,.J se �, O ' I , replaced joint sealant • MEN ?P 1 t• located at gated �' . •• Cii �o parking entrances F4 � s - u.- We ang _ - _ kl 7 n Southern-al !!c� IMPS { ' d - NaW.V iry 'Jr ♦ ♦ f h , w .'i i. A ,� Plam�nq Dpartrn: II • OM . MINI • -I I P,,, -;-- 11 • I �.. r,,;ill ' -;) I - '.., sio....... \ 00 i di Remove andI 1 ;ft/. !• ■ l Natar�l C' , • replace joint al ,,. men ' '' sealants‘i I A. , . - , a tl ,Tir1TC r Chic-Ctntbr DT y I • • https://www.google.com/maps/®32.671 I9 73,-117.1059585,215a,35y,341.47h,0.24t/data=!3m1!1e3?enhy=ttu&g_erEgoyMDIOMTAxNS4wIKXMDSoASAFQAw%3D%3D