Loading...
HomeMy WebLinkAboutInnovative Construction Consulting Services, LLC - Eastside I-805 Community Greenbelt - Change Order No. 27 - CIP No. 22-09 - 2025 A Innovative Construction Consulting Services, LLC P.O. Box 6211 Norco CA 92860 Phone (951) 532-6483 Lic. # 671810 sgill@iccsinc.net CHANGE ORDER MEMORANDUM June 30,2025 To: Ricardo Rodriguez National City Engineering and Public Works Department City of National City From: Sean Gill Project: Eastside 1-805 Community Greenbelt CIP No.: 22-09 Subject: Change Order No.27 Change Order No.27 provides for: The city has directed the contractor to install a 25'flag pole at Filipino Plaza.The work consisted of excavation for the footing/sleeve, and the installation of the flagpole& necessary hardware. This Change Order modifies the Contractor's and the City's obligations and rights under the above- mentioned contract.This change order is not effective until approved by the City. Payment for this change order will be at a lump sum price identified. Supporting Information: The City requested a flagpole be installed at the Filipino Plaza. Time Adjustment: Two(2)contract days were added to the contract time to coordinate the work. Cost Adjustment: The pay method and amount have been reviewed by ICCS and are considered fair and reasonable.The supporting documentation is on file with the project records. /Da, , � 6/30/2025 Project Mana r Date CALIFORNIA -- NATIONAL airy � 1.3.31 -- , ' tNCORpoRATSD Eastside I-805Community Greenbelt CHANGE ORDER NO. 27 CIP NO. 22-09 June 27,2025 Contractor: Dick Miller Inc. The city has directed the contractor to install a 25'flag pole at Filipino Plaza.The work consisted of excavation for the footing/sleeve,and the installation of the flagpole& necessary hardware.This Change Order modifies the Contractor's and the City's obligations and rights under the above- mentioned contract.This change order is not effective until approved by the City. Time adjustment: Two(2)working days have been added to the contract time to complete the additional work Identified. Cost of Change Order: There is a cost increase to the original contract amount. $9,860.73 Recommended by Project Manager: Parker Gill pa/ Date: 7-27-25 By signing this Change Order, the Contractor confirms that he she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: 6a Date:S__ 07/14/2025 (Dick Miller Inc.) • Approved by Project Coordinator: 'C,,,, ',.(.p Date: Approved by Assistant Director of E&PW�� Date: Approved by City Engineer: „„ipa Date: Approved by City Manager: Date: (Required for change orders$25,000 and above) DMI 930 Boardwalk,Suite H,San Marcos,CA 92078 Phone 760-471-6842 FAX 760-471-6178 Contractor's State License No.380204,A,B,C-12-DVBE I SBE 853651 DMI JOB NO. 23053 COR#042-COST TO PROVIDE&INSTALL FLAG POLE ON E.PLAZA BLVD PROJECT:EASTSIDE 1-805 COMMUNITY GREENBELT PROJECT CONTRACT NO.: 22-09 Proposal Submitted To: Phone: Fax: Date Submitted: ICCS LLC 951.532.6483 07/02125 Street Job Name: Date Work Performed: PO BOX 6211 EASTSIDE I-805 COMMUNITY GREENBELT PROJECT 06126/25 Cary,State and Zip Code: 'Job Location NORCO,CA 92860 ABenbon: Architect Plan Sheets: SEAN GILL E-Mail: Spec Section: Addendas Noted: NIA SGILLL6ICCSINC.NET ESTIMATED UNIT UNIT ITEM DESCRIPTION QUANTITIES MEASURE PRICE TOTAL COR COST TO PROVIDE&INSTALL FLAG POLE ON E.PLAZA BLVD #042 MATERIAL CONCRETE BAGS 90 LB 20 EA $6.72 $134.40 FASTSET CONCRETE 50 LB 5 EA $7.47 $37.35 CONCORD FLAGPOLE 1 LS 52,678.00 52,678.00 ALL PURPOSE SAND 50LB 5 EA $4.57 522.85 MAR UP MATERIAL 15% $430.89 SUBTOTAL MATERIAL $3,303.49 LABOR 06.2625 (2)LABORER 16 HR $95.74 S1,531.84 FOREMAN 2 HR $126.58 $253.16 062725 (2)LABORER 16 HR $95.74 $1,531.84 FOREMAN 2 HR $126.58 $253.16 MARK UP LABOR 20% $714.00 SUBTOTAL LABOR S4,284.00 EQUIPMENT 062625 CREW TRUCK(CALTRANS RATE 12-20) 8 HR S52.44 S419.52 FOREMAN TRUCK(CALTRANS RATE TBTT 00-06) 2 HR $35.85 $71.70 062725 FLATBED TRUCK(CALTRANS RATE T8T 60) 8 HR $103.27 $826.16 CREW TRUCK(CALTRANS RATE 12-20) 8 HR $52.44 $419.52 FOREMAN TRUCK(CALTRANS RATE TBTT 00-06) 2 HR $35.85 $71.70 MARK UP EQUIPMENT 15% $27129 SUBTOTAL EQUIPMENT $2,079.89 SUBCONTRACTOR I MARK UP SUBCONTRACTOR 5% SUBTOTAL SUBCONTRACTOR 2.0%Add For Bond&Insurance Cost $193.35 ADDRIONAL WORKING DAYS REQUESTED: 2.00 SUBTOTAL $9,860.73 TOTAL AMOUNT OF COR#042: $9,860.73 Submitted for DMI BY: I3IAj SA-asji Pz DMI 23053-Change Orders&Log 1 of 1 7/3/2025 11:45 AM AGENCY: 1Il ' , Miff 10111,•Ot•MIIIM•OPINA ROWN/ItIff. Exhibit 1 FIELD ORDERS / DAILY EXTRA WORK REPORT -�7 CJ (PER"GREENBOOK''STANDARD., SPECIFICATIONSJ FOR PUBLIC WORKS CONSTRUCTION) _ WBS NO. G DATE PERFORMt r ( i 2—7—L_,�f DATE OF REPORT (f/Ji7,2_ F.O./C.C.O REPORT NO._-----—� — ___C / re"TiP WORK PERFORMED BY c M j EWAl)ATr: hOf t ct,(Z, fl cvose l -Clad, 0 '(' DESCRIPTION OF WORK l�f it Oa61 1 ✓ t► DSe �j 1Op fa _ EQUIP. HOURS *HOURLY EXTENDED NO EQUIPMENT HOURS HOURLY EXTENDED LABOR RATE AMOUNTS 1. RATE AMOUNTS _ O.T. �--- „5INk.r iA ? 0.4e4e4 REG. nil 1_ ,& tJ lLi l 4�y V ~ O.T. __ 1 t(Yiev1f/ REG. ' I♦ I O.T. 'j a 7- REG. / Illi O.T. REG. O.T. I . , REG. O.T- �J REG. — — I O.T. T REG. 111 O.T. MATERIAL AND/OR APPROVED WORK DONE BY SPECIALISTS — REG. DESCRIPTION NO.UNIT UNIT COST IA [,�L-- Ti 4 20 *HOURLY-PER SECTION 3-3.2.2 D Li) C0ntr T — TOTAL LABOR A TOTAL COST 0 UIPMENT, MATERIALS AND WORK1 )1. \ B ___�� + %MARKUP ON LABOR COST (A) + %MARKUP ON EQUIPMENT,MATERIAL AND (B) CONTRACTOR'S REPR ENTATIVE WORK COST + %MARKUP ON SUBCONTRACTED WORK (C) RESIDENT ENGINEER SUBTOTAL IS THIS WORK DONE UNDER GREENBOOK SECTION 3-5 + __ %BOND AND LIABILITY INSURANCE (B)(NOT APPLIED TO FIELD ORDERS) DISPUTED WORK? t j YES r I NO TOTAL DISTRIBUTION: White•RE Yellow-Contractor Pink-Work Order Eile ED-94(5-11)PW/PS-173 tx - AGENCY:1\�_1f IdAtcir TICKET NO: ntN$U1.■Na/Nfrulwa CONMAC me Exhibit 2 - FIELD ORDERS / DAILY EXTRA WORK REPORT (PER"GREENBOOK"STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION) WgS No..2305 ff �/ ( ' REPORT NO._ DATE PERFORMED (U ��� 'a DATE OF REPORT lf! 7r�- J F.OJC.C.O - WQRK PERFORMED BY � 1.. 6rM�- !h n�E -_ 1 a _--�--�LK f 0� ' �t .. DESCRIPTION OF WORK t( I a n EXTENDED EQUIP EQUIPMENT HOURS HOURLY EXTENDED LABOR 1 HOURS *HOURLY AMOUNTS NO. RATE AMOUNTS RATE I _ ,_ 0 T. IMIIIPIIIIIIIIII IIMI �------ yl; �i l'11 :_ 2� i- _i�"_ RE 1'�� O.T. '� aM4Q-- I rileA e.-2, REG. t, 111111,41111111. ' O.T. L �#►NCt fZ�P �. �k,1V1L(lfZ. ROET. �" ml 5 `-_(�"`_ REG. -_ O.T. REG. O.T. REG. _ O.T. _ — I r REG. I _ O.T. MATERIAL AND/OR APPROVED WORK DONE BY SPECIALISTS REG.LL 1 DESCRIPTION NO, JNIT UNIT COST y b et oiC eilW d,W _ *HOURLY-PER SECTION 3-3.2.2 .�I1- ',,,r 1 -_ A TOTAL LABOR TOTAL COST OF EQUIPMENT, MATERIALS AND WORKyi, B + LABOR COST �) k �_%MARKUP ON ç + %MARKUP ON EQUIPMENT,MATERIAL AND (B) CONTRACTOR REPRESENTATIVE WORK COST + %MARKUP ON SUBCONTRACTED WORK (C) ___ -_- SUBTOTAL RESIDENT ENGINEER + %BOND AND LIABILITY INSURANCE �B� IS THIS WORK DONE UNDER GREENBOOK SECTION 3-5 (NOT APPLIED TO FIELD ORDERS) DISPUTED WORK? _ j NO TOTAL YES DISTRIBUTION: it -R Yellow-Contractor Pink-Work Order File FD-c)A(S•11)PWfPS-173 Exhibit 3 Quote For Flagpole MAIN OFFICE: 1057 E. Imperial Hwy, Ste#471 Placentia, Ca 92870 ILOS ANGELES AREA: 562-821-0170 SAN DIEGO AREA: 619- 562-7762 T LAS VEGAS AREA: 702-454-3437 SPECIALTY BUILDING E-MAIL: sales(a�specialtybuilding.com COMPONENTS PRICE QUOTATION To: Estimating From: Kailey Hale Company: DMI Date: 04/02/2025 Pages: 2 including Cover Sheet Quote#: 2025-0143 Project Name: Eastside 805 Quote is valid until:05/02/2025 Per your request and information, we propose to furnish (1) Aluminum Flagpoles for the lump sum price of $2,678.00, F.O.B. factory, Freight allowed, and EXCLUDING sales tax as follows: 1(One) Concord-American Flagpole Model IRC25D61-SAT, Internal Reinforced with Cam Cleat - Rope Halyard, Exposed height of 25'0", Ground set with standard 10% set depth, Satin finish and Standard gold ball. • If there are any changes to the material quoted above, pricing is subject to change. If shipment of the sleeve in advance of the flagpole is required, there would be an additional charge based on method of shipment required. Notes: 1. Material quoted to be as manufactured by Concord-American Flagpole. 2. We are quoting a 1.6 safety factor against ultimate stress less an increase in allowable stress for wind by 40% per NAAMM-FP 1001-01. 3. We EXCLUDE asphaltic paint. 4. If California P.E. stamp for pole only is required, add $400.00 per pole submittal. 5. If seismic calcs are required please add $550.00/per pole submittal. This is for pole only and foundation is by others. 6. All material is FOB factory, freight allowed. 7. It is the customer's responsibility to inform us of any sizing or quantities changes. Pricing is subject to change without notice. *Despite best efforts,excessive color variations WILL occur in the anodizing process,both from components to component,and within components.Hapco WILL NOT accept responsibility for color variations of anodized poles.In lieu of anodizing,we recommend Hapco factory apply thermoset powder paint with guaranteed color uniformity. *If Custom Color is required please call for quote. *Quote is subject to Concord-American Flagpole's standard terms and conditions. *Poles above are made of aluminum.*Ground-set poles come standard with 10%set-depth unless otherwise noted. *A11 quotations are subject to acceptance by Concord-American Flagpole at time of order. *Bituminous paint,hardwood wedges,hard coat wax,and all installation is byothers. * Delivery&Packaging:PLEASE NOTE if your order has any issues of any kind(Damages or incorrect material)you MUST notify SBC within 24-48 hours of Floor Doors& Roof Hatches • Fascia& Coping Systems • Louvers& Sunscreens • Stair Nosings • Flagpoles • Ladders Page 2 of 2 0119 16.1111tai SPECIALTY BUILDING COMPONENTS receipt.If we are not notified within that time period,we will not be able to take any responsibility for any shortages,damages,or incorrectly made material. General Notes: 1. BID IS FOR MATERIAL ONLY. 2. We EXCLUDE field measurements. 3. We EXCLUDE installation. 4. We EXCLUDE caulking, sealants and fasteners/screws unless otherwise noted. 5. Pricing is based on all material shipping in one shipment to one location. We thank you for the opportunity to submit this quote and hope to be favored with your order. Sincerely, *iallee.1 Welk Kailey Hale If we are favored with you order we would require a purchase order made out to Concord-American Flagpole do Specialty Building Components. Name: Signature: Date: 4 Lt * l 1 1ii F Nr-iih, . i R. leastk 1 Flow ers dorie - Ihk.. v0P4v ' ', ‘ jet more . i., ' 5 t1A( KL 1 Pt..ALF AVENUL S Atv DI GO , CA 92113 (619) 2G , Exhibit 3 ` 1032 F. -,1 00004 06f�` O6/26/ 5 . 2 i ALE CASHIER R JENNIFER OOoo 29 2 t 2 7 E.: 0#CONCRETE <A> 90LB OUIKRETE CONCRETE MIX 2(46 . 72 ��� .0000- E 42-303 50# FAST SET <A>501_E� OUIKRETE FAST SET CONCRETE �4 . 40 �' 29 . 8 SUBTOTAL 164 . 28 SALES TAX 12 . 7 TOTAL $177 . 01 XXXXXX XXXXXU343 HOME DEPOT USD$ 177 . 01 AUTH CODE 0263O9/4041704 TA DICK MILLER INC RIVERA SANTIAGO Chip Read AID ,. ,. �. A 000000049999D84OG.��15 1 D *a�.�G PRnx PRO XTRA MEMBER STATEMENT * . . .4., 5 so dow. .,e. lif N . iiik olrif ,i, got, sok ... o • 90t, ill 6611bAditik ' ) 1 ' 4 - , 4 i. it otkill A 1110 it ' 7 4 * 4 , . oat st it t Asi 4,9 4 ., .. 0 a ark , t ii.0% .,f* * ,, . 11. • '*. Aso Ai,a, ?i ', ' , rAt **to t,ilt, at,,,Ikt 1**1114 * . ist)Iti coDE 2 :41 24/3.5903Tiv plat Ofitticti INC PIA/LA ' AGO "Ilk 4 .. Pik) XI Rifr Pt Pitt R 4 Al *NI ''''' -.. i. picv xlitA INI1 - 11.10 -11030 ,1,..... : 1pfurS RECEIPT PO/JOB W : 234. if33 . .. : oimeA4 Dan 1iaA spFikin (ifirw, . &Al