HomeMy WebLinkAboutFinal Contract Balance ReportFINAL CONTRACT BALANCE DATE: February 10, 2011 PROJECT: National City Concrete Improvements Project, Specification No. 10-02 TO: Black Rock Construction Company. Mr. William Goshen 228 North Street Crispen Brea, CA 92821 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION OF CHANGE: $256,552.00 November 15, 2010 February 9, 2011 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 45 working days 11 working days 56 working days This change order is written to balance and finalize the amounts for said project. Please see attached Contract Final Balance sheet DISCUSSION: Added or revised line items: Additive Change Order Number One was added to the contract for $47,232.50 per the City resolution No. 2011-05 to use the remaining CDBG funds in both concrete and drainage improvements project accounts. This change order included work such as removing and replacing pedestrian ramps and cross gutters. Line Item Change No. 3 was to increase the sidewalk removal and replacement amount to make up for the contractor's shortage to reach the original contract amount. The shortage was mainly due to the difference in contractor's bid price and Engineer's estimate. The increase was 1456.75 square feet of sidewalk in the amount of $9,468.88. Line Item Change No. 5 was to increase the driveway quantity as more driveways were required to be removed and replaced during the construction_to_meet -ADA-requirements. The change amount was $5,237.19. Line Item Change No. 6 was to decrease the curb and gutter quantity. The decrease in the amount of $4,760.00 was as the result of Engineer's determination in the necessity of removal and replacement of curb and gutter at certain locations in the field. Page 1 1 FINAL CONTRACT BALANCE Line Item Change No. 7 was to add required extra base to substitute with unsuitable wet sub -grade. The base line item was increased by $2,512.50. Line Item Change No. 9 was to decrease the amount of asphalt work as it was not performed by the contractor. The line item amount was decreased by $4,590.00. Therefore, the construction bid price of $256,552.00 was increased by $55,101.07 due to said actual construction change orders and the net balance of line item changes resulting in a final construction cost of $311,653.07 CONTRACT ADJUSTMENT: As a result of the above change orders, the contract price is adjusted as follows: 1. The final contract price to date is adjusted to $311,653.07. 2. As a result of the satisfactory completion of said project, a retention amount of $31,165.31. is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Black Rock Construction Company will not be entitled to damages or additional payment for delays as described in the 2009 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 2 2 Contract Final Balance National City Drainage Improvements Project, Specification # 10-03 Original Contract Adjusted Contract No. Item Unit Bid Qty Unit Price Amount Qty Unit Price Amount 1 CLEAR & GRUBB INCLUDING STORM WATER POLLUTION PREVENTION LS 1 $9,500.00 $9,500.00 1 $9,500.00 $9,500.00 2 TRAFFIC CONTROL LS 1 $8,500.00 $8,500.00 1 $8,500.00 $8,500.00 3 Remove and Replace PCC Sidewalk Panels (G-7) SF 16318 $6.50 $106,067.00 17774.75 $6.50 $115,535.88 4 Remove and Replace Pedestrian Ramps per G-28, G-29, or G-31 with truncated domes (G-30) EA 52 $1,750.00 $91,000.00 52 $1,750.00 $91,000.00 5 Remove and Replace Driveway Apron (G-14) SF 800 $8.50 $6,800.00 1416.14 $8.50 $12,037.19 6 Remove and Replace (in - kind) Curb and Gutter (Modified G-2) or Curb Only (G-1) LF 381 $35.00 $13,335.00 245 $35.00 $8,575.00 7 Remove and Replace Unsuitable Subgrade with Crushed Aggregate Base (CAB) TN 20 $75.00 $1,500.00 53.5 $75.00 $4,012.50 8 Remove and Replace Alley Apron (G-17) SF 1700 $8.50 $14,450.00 1700 $8.50 $14,450.00 9 Variable Thickness Asphalt Concrete TN 40 $135.00 $5,400.00 6 $135.00 $810.00 Base Bid Subtotal $256,552.00 $264,420.57 Change Orders CO1 Adding Pedestrian Ramps and Cross Gutters SF 1 $47,232.50 $47,232.50 1 $47,232.50 $47,232.50 Grand Total $303,784.50 $311,653.07 3