Loading...
HomeMy WebLinkAboutFinal Contract Balance FormFINAL CONTRACT BALANCE DATE: February 8, 2011 PROJECT: National City Cultural Arts Center Landscape Improvements, Specification No. 09-17 TO: Blue Pacific Engineering Shahram Eliho 3770 Hancock Ste. H. San Diego, CA 92110 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION OF CONTRACT: $51,152.50.00 October 11, 2010 December 16, 2010 48 working days 0 working days 48 working days Original Contract Adjusted Contract ( No Adjustments to Contract) No. Item Unit Bid Qty Unit Price Amount Qty Unit Price Amount 1 Clearing & grubbing s.f. 4505 1 4505 4505 1 4505 2 Mobilization, construction ea. 1 2000 2000 1 2000 2000 3 Topsoil import to make ea. 1 2000 2000 1 2000 2000 4 Drainage -drain lines and l.t: 150 30 4500 150 30 4500 5 Drainline cleanout ea. I 500 500 1 500 500 6 Mulch only (in lieu of s.f. 850 .6 510 850 .6 510 7 Stabilized decomposed granite (D.G.) paving s.f. 380 7.5 2850 380 7.5 2850 8 Soil Preparation s.f. 4125 .6 2475 4125 .6 247.5 9 Landscape Planting s.f. 4125 2 8250 4125 2 8250 10 Landscape Irrigation s.f. 4125 405 405 4125 405 405 1 1 Ribbon Bike Rack installed ea. 1 1500 1500 1 1500 1500 12 Concrete header - 4" I.f. 100 12 1200 100 12 1200 13 ADA parking sign addtion ea. 2 250 500 2 250 500 14 ADA parking signage on new break -away post ea. 1 300 300 1 300 300 15 90 Day maintenance ea. 1 1500 1500 1 1500 1500 TOTAL 51,152.50 Page 1 1 FINAL CONTRACT BALANCE SEE ATTACHED CONTRACT BALANCE SUMMARY DETAIL. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Industrial Coating and Restoration Services, Inc. will not be entitled to damages or additional payment for delays as described in the 2009 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 2 2