HomeMy WebLinkAboutExplanationEXPLANATION:
On August 3, 2010 a contract was awarded to ATP General Engineering for
the total construction cost of $2,918,289.57 to perform the City of National
City's Street Resurfacing Project consists of the repair of bituminous
pavements in various locations within the City of National City by removing
and replacing damaged asphalt, possible replacement of unsuitable sub -
grade, if found, placement of Type II asphalt slurry, asphalt overlay with
asphalt rubber hot mix, replacement of curbs, gutters, sidewalk, crosswalks,
pedestrian ramps, alley apron, striping, legends, signs, and traffic loops.
A final inspection was conducted and the completed work was found to be in
accordance with the approved plans and specifications.
On April 6, 2011 the contractor submitted all the final contract documents
for project acceptance and closure.
It is recommended that the work be accepted in the total final contract
amount of $2,843,844.49.
The purpose of the attached final contract balance report is to finalize the
contract quantities and construction completion time. With the total final
cost, the construction was completed under the original contract amount by
$74,445.08.