Loading...
HomeMy WebLinkAboutFinal Contract BalanceDATE: PROJECT: TO: CALIFORNIA -« NATIONAL CIrT'r e 'ICORP oft ATED FINAL CONTRACT BALANCE March 15, 2011 National City Street Resurfacing Project FY 10-11, Specification No. 10-01 ATP General Engineering Contractors, Inc. Mr. Donald L. Daley III 187 Mace Street Chula Vista, CA 91911 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $2,918,289.57 August 10, 2010 March 15, 2011 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 70 working days 7 working days 77 working days This Final Contract Balance reports final line item amounts and summarizes all change order to produce a final contract amount. Please see attached Contract Final Balance sheet. DISCUSSION: Change Orders and line item adjustments: Change Order #1 added Bay Marina Drive from Tidelands to Cleveland, 16th Street from National City Boulevard to D Avenue, and on D Avenue from 8`h Street to 9th Street to the Resurfacing project and extended contract line items such as cold milling, asphalt overlay, asphalt dig -outs, removal of unsuitable sub -grade, crack filling, weed abatement, removal and replacement of sidewalk, curb and gutter, and pedestrian ramps, raising of manhole covers, installation of traffic loops, and installation of traffic striping and markings. All of the work for this change order was paid as an extension of line item for each item of work as described below. 1 FINAL CONTRACT BALANCE National City Street Resurfacing Project FY 10-11 Specification No. 10-01 Change Order #2 added additional striping, crosswalks and signage for 8`1' Street and other locations to the contract as recommended by the City Traffic Engineer. All of the work for this change order was paid as an extension of line the item for each item of work as described below. Change Order #3 was subtracted from the contract in an amount of ($8,373.57). This Change Order was for the installation of two additional speed humps on M Avenue at a price of $3,537.40. The Change Order was also for a 15% reduction in payment price as an offset for the low -compaction results for asphalt placed at 16th Street from National City Boulevard to D Avenue and on D Avenue from 8th Street to 9th Street, and for the Contractor to provide an additional one-year warranty, for a total of a two-year warranty for those sections of asphalt from the date of acceptance by the City. The total reduction in price for the low -compaction results was ($11,910.97) for a net reduction of ($8,373.57). Line Item Change No. 2 was for the increase in Cold Milling required for the additional streets identified in Change Order No. 1. The increase was 38,795 square feet of Cold Milling in the amount of $8,534.90 Line Item Change No. 3 was for the increase in Asphalt (Hot Rubber Mix) required for the additional streets identified in Change Order No. 1. The increase was 836.57 tons of Asphalt (Hot Rubber Mix) in the amount of $83,113.23. Line Item Change No. 4 was for the decrease in Type II Slurry for work not performed by the contractor as a result of Engineer's determination that such work was not required. The base line item amount was decreased by $12,313.60. Line Item Change No. 5 was for the decrease in 6" Asphalt Concrete Dig -outs and Replacement for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $30,442.63. Line Item Change No. 6 was for the decrease in 2"-4" Asphalt Concrete Dig -out and Replacement for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $144,321.58. Line Item Change No. 7 was for the decrease in Remove Unsuitable Sub -Grade and Replace with CMB and Geo-fabric for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $28,078.77. 2 of 4 2 FINAL CONTRACT BALANCE National City Street Resurfacing Project FY 10-11 Specification No. 10-01 Line Item Change No. 8 was for the increase in Crack Filling/Weed Abatement required for the additional streets identified in Change Order No. 1. The increase was 12,633.22 square yards of Crack Filling/Weed Abatement in the amount of $3,537.30. Line Item Change No. 9 was for the increase in Removal and Replacement of 4" PCC Sidewalk required for the additional streets identified in Change Order No. 1. The increase was 4,611.50 square feet of Removal and Replacement of 4" PCC Sidewalk in the amount of $26,977.28. Line Item Change No. 10 was for the increase in Curb and Gutter, G-2 Modified required for the additional streets identified in Change Order No. 1. The increase was 1,138.50 lineal feet of Curb and Gutter, G-2 Modified in the amount of $37,058.18. Line Item Change No. 11 was for the increase in PCC Drive Way required for the additional streets identified in Change Order No. 1. The increase was 1,352.00 square feet of PCC Drive Way in the amount of $14,534.00. Line Item Change No. 12 was for the increase in Alley Apron required for the additional streets identified in Change Order No. 1. The increase was 20 square feet of Alley Apron in the amount of $1,760.00. Line Item Change No. 13 was for the increase in Cross Gutter required for the additional streets identified in Change Order No. 1. The increase was 1,368.75 square feet of Cross Gutter in the amount of $20,668.13. Line Item Change No. 14 was for the decrease in Pedestrian Ramps for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $72,960.00. Line Item Change No. 16 was for the decrease in Raising Survey Monument Covers for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $2,502.00. Line Item Change No. 17 was for the increase in Traffic Loops required for the additional streets identified in Change Order No. 1. The increase was 32 Traffic Loops in the amount of $10,003.20. Line Item Change No. 18 was for the increase in Traffic Striping Removal and Replacement required for the additional streets identified in Change Order Nos. 1 and 2. The increase was in the amount of $30,060.87. Line Item Change No. 20 was for the decrease in Tree removals/stumping for work not performed by the Contractor as a result of Engineer's determination that such work was not required. The base line item was decreased by $11,700.00. 3 of 4 3 FINAL CONTRACT BALANCE National City Street Resurfacing Project FY 10-11 Specification No. 10-01 Therefore, the construction bid price of $2,918,289.57 was decreased by $74,445.08 due to said actual construction change orders and the net balance of line item changes resulting in a final construction cost of $2,843,844.49. CONTRACT ADJUSTMENT: As a result of the above change orders, the contract price is adjusted as follows: 1. The final contract price to date is adjusted to $2,843,844.49. 2. As a result of the satisfactory completion of said project, a retention amount of $142,192.22 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. ATP Engineering Contractors, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. 4 of 4 4 -- CALIFORNIA >-- NATIONAL Cir INCORPORATED STREET RESURFACING FY10-11 Specification #10-01 FINAL CONTRACT BALANCE, Attachment "A" No. Line Items Unit Bid Qty Unit Price Bid Amount Actual Qty Unit Price Actual Amount Delta 1 Mobilization LS 1 81,000.00 81,000.00 1 81,000.00 81,000.00 - 2 Cold Milling SF 185,652 0.22 40,843.44 224447 0.22 49,378.34 8,534.90 3 Asphalt (Rubber Hot Mix) TON 7,432 99.35 738,369.20 8268.57 99.35 821,482.43 83,113.23 4 Type II Slurry SY 34,886 2.08 72,562.88 28966 2.08 60,249.28 (12,313.60) 5 2"-4" Asphalt Concrete Dig -out and Replacement TON 4,200 95.30 400,260.00 3880.56 95.30 369,817.37 (30,442.63) (144,321.58) (28,078.77) 3,537.30 6 6" Asphalt Concrete Dig -outs and Replacement TON 9,635 92.20 888,347.00 8069.69 92.20 744,025.42 7 Remove Unsuitable Sub -Grade and Replace with CMB and Geo-fabric TON 1,000 30.65 30,650.00 83.89 30.65 2,571.23 8 Crack Filling/Weed Abatement SY 120,685 0.28 33,791.80 133318.22 0.28 37,329.10 9 4" PCC Sidewalk SF 9,696 5.85 56,721.60 14307.5 5.85 83,698.88 26,977.28 10 Curb and Gutter, G-2 Modified LF 1,348 32.55 43,877.40 2486.5 32.55 80,935.58 37,058.18 11 PCC Drive Way SF 3,681 10.75 39,570.75 5033 10.75 54,104.75 14,534.00 12 Alley Apron SF 140 88.00 12,320.00 160 88.00 14,080.00 1,760.00 13 Cross Gutter SF 3,766 15.10 56,866.60 5134.75 15.10 77,534.73 20,668.13 14 Pedestrian Ramps, All Types EA 165 1,920.00 316,800.00 127 1,920.00 243,840.00 (72,960.00) 15 Raise Manhole Covers EA 74 163.60 12,106.40 74 163.60 12,106.40 - 16 Raise Survey Monument Covers EA 11 834.00 9,174.00 8 834.00 6,672.00 (2,502.00) 10,003.20 17 Traffic Loops (Caltrans Type E) EA 110 312.60 34,386.00 142 312.60 44,389.20 18 Traffic Striping/Markings Removal and Replacement LS 1 18,000.00 18,000.00 1 48,060.87 48,060.87 30,060.87 19 Tree -trimming LS 1 5,200.00 5,200.00 1 5,200.00 5,200.00 - 20 Tree removals/stumping EA 10 1,300.00 13,000.00 1 1,300.00 1,300.00 (11,700.00) 21 Remove and replace in -roadway lighting crosswalk system LS 1 9,000.00 9,000.00 1 9,000.00 9,000.00 - 22 Provide 30" x 30" Signs EA 12 285.00 3,420.00 12 285.00 3,420.00 - 23 Striping and raised pavement markers (CalTrans Std Plans, Detail 38A w/ 38C) LF 850 1.15 977.50 850 1.15 977.50 - 24 Pedestrian Crossing Signs (W11-2, W16-7 - MUTCD) EA 4 235.00 940.00 4 235.00 940.00 - 25 Remove existing Ped Crossing sign (W11-2) and sign post EA 2 52.50 105.00 2 52.50 105.00 - TOTALS: 2,918,289.57 Change Orders Adding Line Item Work (Costs are shown in the actual line items above.) - 1 Additional Line Item Work Bay Marina Drive, 16th Street, and D Street LS 1 - - 0 - - - 2 Additional Striping at 8th Street within original work area LS 1 - - 0 - - - Change Orders 3 Add Speed Humps on M St. /Credit for Low Compaction Results on 16th St, and D St. LS 1 (8,373.57) (8,373.57) 1 (8,373.57) (8,373.57) - TOTALS: 2,843,844.49 (74,445.08) ine items with additions and reductions shown in bo