Loading...
HomeMy WebLinkAboutFinal Contract BalanceFINAL CONTRACT BALANCE DATE: September 6, 2011 PROJECT: National City El Toyon Soccer Field Project, Specification 07-01 TO: Ohno Construction, Inc. Norm Hubbard 16714 Boyle Avenue Fontana, CA 92337 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $440,642.20 November 1, 2010 August 17, 2011(includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 75 working days 45 working days 120 working days This Final Contract Balance reports fmal line item amounts and summarizes all change order to produce a final contract amount. Please see attached Contract Final Balance sheet. DISCUS SION: Change Orders and line item adjustments: Change Order #1: The Contractor agreed to provide a 10 foot wide area along the entire north side of the field in preparation for the installation of the synthetic turf field, including but not limited to clearing, grubbing, demolition of curbs, preparation of subgrade, installation of drainage and sub -grade and all other work and coordination required to the satisfaction of Field Turf such that it is a finished product ready for the synthetic turf installation. The total cost for this change order was $18,750.53. Change Order #2: The Contractor agreed to perform all work necessary to install a new sewer main, laterals, manholes, and connections per exhibit "B" of the Change Order. The Change Order provided for a new alignment that allowed for the installation of a new main without pumping. The contractor agreed to upgrade the sewer main from 10" PVC to 12" PVC at no additional cost to the City. All work for this Change Order was line item work and was paid pursuant to the respective line items and therefore was a zero sum change order. 1 FINAL CONTRACT BALANCE National City El Toyon Soccer Field Project Specification 07-01 Change Order #3: The Contractor agreed to construct the following Additive Bid Items in accordance with the contract documents: A) Remove and Replace with Overlay AC a service road with 1 1/2" thick AC at a cost of $13,000.00; B) Restore decomposed granite path with 2" minimum thickness decomposed granite and install recycled plastic redwood header at a cost of $27,800; C) Install decomposed granite and concrete header adjacent to and south of soccer field at a cost of $28, 000.00; D) Relocate and paint bleachers at a cost of $2,200.00; E) Adjust/install irrigation and sod south of soccer field at a cost of $45,686.00; F) Clear, grub, and grade area inside dog runs and install 2" of decomposed granite at cost of $71, 071.20, install 4" high chain link fence at a cost of $9, 000.00, install ADA compliant self closing/locking swing gates at a cost of $1,100.00; G) Insta11 4", 2500 psi concrete pads for benches and trash cans at a cost of $2,500.00, install City provided benches and trash cans at a cost of $1,470.00; and H) Install 48" box tree, (Tipuana) at a cost of $11,200.00. These Additive Bid Items were paid per the line item costs bid by the contractor in the original bid documents, and the total cost for this change order was $159,117.20. Change Order #4: The Contractor agreed to install 140 lineal feet of 6" SDR 35 PVC drain pipe from the existing 60" storm drain to the new 12" PPC concrete area drain with metal grate located 10 feet from the northeast corner of the soccer field and 20 lineal feet of 6" SDR 35 PVC drain pipe from the existing area drain southeast of the soccer field to the north to the new 12" PPC concrete area drain with metal grate located 15 feet from the decomposed granite south of the soccer field. The total cost for this change order was $3,700.00. Change Order #5: The Contractor agreed to delete the quantities of work for line items, Additives A #1, 500 lineal feet; Additive B #2, 1,130 lineal feet; Additive F #1, 3,458 square feet; and repair the existing fencing around the dog runs by stretching the mesh, installing a bottom rail, and filling in the gaps; replace two #6 electrical pull boxes; remove two existing concrete pads west of the southerly bleachers; and rehabilitate all of the existing bleachers with wire wheeling the existing seating areas prior to painting and installing new synthetic wood skids and spiking into the ground. The total cost for this change order was $11,192.20. Change Order #6: The Contractor agreed to install two (2) yellow round football goal post pads to fit 6.5" diameter gooseneck goal posts at El Toyon Sports Field. The Contractor agreed to delete one tree per line item #1, Additive Bid H at a cost savings of $1,600.00. The total cost for this change order was $824.67. Line Item Change No. 5 was an increase in replacing existing sewer main with 10" PVC. The increase was 91 lineal feet of replacing existing sewer main with 10" PVC in an amount of $5,032.30. Line Item Change No. 6 was a decrease in replacing existing sewer main with 8" PVC. The decrease was 30 lineal feet of replacing existing sewer main with 8" PVC in an amount of $1,578.00. 2 of 4 2 FINAL CONTRACT BALANCE National City El Toyon Soccer Field Project Specification 07-01 Line Item Change No. 7 was a decrease in connections to the existing sewer main. The decrease was 3 connections to the existing sewer main in an amount of $1,370.00. Line Item Change No. 8 was a decrease in replacing existing sewer lateral with 6" PVC. The decrease was 4 lineal feet of replacing existing sewer lateral with 6" PVC in an amount of $169.15. Line Item Change No. 9 was an increase in replacing existing manholes. The increase was 1 replacement of existing manhole in an amount of $9,000.00. Line Item Change No. 13 was a decrease in providing and installing soccer goals. The decrease was 1 providing of and installing a soccer goal in an amount of $5,000.00. Therefore, the construction bid price of $440,642.20 was increased by $186,066.05 due to said actual construction change orders, the actual construction of additive bids, and the net balance of line item changes resulting in a final construction cost of $626,708.25. CONTRACT ADJUSTMENT: As a result of the above change orders, additive bids, and line item changes, the contract price is adjusted as follows: 1. The final contract price to date is adjusted to $626,708.25. 2. As a result of the satisfactory completion of said project, a retention amount of $53,249.81 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Ohno Construction, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. 3 of 4 3 CITY OF NATIONAL CITY El Toyon Soccer Field Project Specification No. 07-01 FINAL CONTRACT BALANCE September 6, 2011 Original Contract To Date Delta No. Item Unit Quantit Unit Price Amount Quantity Amount 1 Mobilization LS 1 62,700.00 62,700.00 1.00 62,700.00 - 2 Water Quality Control, MPDES LS 1 3,100.00 3,100.00 1.00 3,100.00 - 3 Clearing and Grubbing LS 1 19,000.00 19,000.00 1.00 19,000.00 - 4 Surveying LS 1 8,000.00 8,000.00 1.00 8,000.00 - 5 Replace existing sewer main with 10" PVC LF 489 55.30 27,041.70 580.00 32,074.00 5,032.30 6 Replace existing sewer main with 8" PVC LF 30 52.60 1,578.00 - - (1,578.00) 7 Connection to existing sewer main EA 3 1,370.00 4,110.00 2.00 2,740.00 (1,370.00) (169.15) 9,000.00 8 Replace existing sewer lateral with 6" PVC LF 275 42.30 11,632.50 271.00 11,463.35 9 Replace existing manholes EA 2 9,000.00 18,000.00 3.00 27,000.00 10 Install 6" sewer lateral cleanout EA 3 500.00 1,500.00 3.00 1,500.00 - 11 Grading and drainage LS 1 193,300.00 193,300.00 1.00 193,300.00 - 12 Install concrete curbing with anchoring system, for permieter of turf field LF 1,120 24.00 26,880.00 1,120.00 26,880.00 - 13 Provide and install soccer goals EA 2 5,000.00 10,000.00 1.00 5,000.00 (5,000.00) - 14 Provide and install football goals EA 2 12,500.00 25,000.00 2.00 25,000.00 15 Permiter Irrigation System LS 1 12,000.00 12,000.00 1.00 12,000.00 - 16 Provide field sweeper EA 1 1,300.00 1,300.00 1.00 1,300.00 - 17 Provide field groomer EA 1 6,400.00 6,400.00 1.00 6,400.00 - 18 Bonding LS 1 9,100.00 9,100.00 1.00 9,100.00 - Change Orders - 1 Add 10' to North Side of Field LS 1 18,730.53 18,730.53 1.00 18,730.53 - 2 Sewer (Q's shown on line items) - - - - 3A AC Overlay SF 5,000 2.60 13,000.00 4,500.00 11,700.00 (1,300.00) (621.50) 3B1 DG path SF 33,800 0.55 18,590.00 32,670.00 17,968.50 3B2 Recycled plastic redwood header LF 1,550 6.00 9,300.00 420.00 2,520.00 (6,780.00) - 3C DG and concrete header LS 1 28,000.00 28,000.00 1.00 28,000.00 3D Relocate and paint bleachers LS 1 2,200.00 2,200.00 1.00 2,200.00 - 3E Irrigation and Sod SF 17,240 2.65 45,686.00 17,240.00 45,686.00 - 3F1 Clear, grub, grade dog run, install DG SF 18,968 0.90 17,071.20 15,510.00 13,959.00 (3,112.20) - 3F2 Install 4" high chain link fence LF 500 18.00 9,000.00 500.00 9,000.00 3F3 Install swing gate EA 4 275.00 1,100.00 4.00 1,100.00 - 3G1 Install 4", 2500 psi concrete pads SF 500 5.00 2,500.00 500.00 2,500.00 - 3G2 Install benches and trash cans EA 7 210.00 1,470.00 7.00 1,470.00 - 3H Install 48" box tree EA 7 1,600.00 11,200.00 6.00 9,600.00 (1,600.00) - 4 Install drain pipe LS 1 3,700.00 3,700.00 1.00 3,700.00 5 Repair fencing, install electrical pullboxes, install concrete pads, rehabilitate bleachers etc. LS 1 11,192.20 11,192.20 1.00 11,192.20 - 6 Goal Post Pads LS 1 824.67 824.67 1.00 824.67 - TOTALS: 633,382.13 626,708.25 4