HomeMy WebLinkAboutExplanationDATE: PROJECT: TO: -r."CALIF;QRt1lA + NATION L CITY r^1 Ile c i ^` U c uponAvo, FINAL CONTRACT BALANCE September 27, 2011 National City Parks ADA Access Upgrades & Park Garden Project, Specification No. 10-05 Jimenez Inc. dba MJC Construction Mr. Javier Jimenez, President 3015 Sylvia Street Bonita, CA 91902 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $242,007.50 February 16, 2011 July 28, 2011 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 25 working days 0 working days 25 working days This Final Contract Balance reports final line item amounts and summarizes all change order to produce a final contract amount. Please see attached Final Contract Balance sheet. DISCUSSION: Change Orders and line item adjustments: Change Order #1: The Contractor agreed to install Alternate Bid "D" at the prices listed in the Contractor's Bidder's Proposal. The Contractor also agreed not to install Alternate Bid "C". This was a zero sum change order. Change Order #2: The Contractor agreed to reduce line item 2a Kimball Park, 6" sidewalk replacement by 1,430 square feet at $7.00 per square foot for a total cost savings to the City of $10,010.00. This was a zero sum change order. Change Order #3: The Contractor agreed to perform grading, clearing, grubbing and restoration work in El Toyon Park in the amount of $4,525.00, which was paid as line 1 FINAL CONTRACT BALANCE National City Parks ADA Access Upgrades & Park Garden Specification No. 10-05 item work, and additional grading and asphalt paving in the amount of $23,200.00, which represents the total costs of this Change Order. Change Order #4: The Contractor agreed to remove and dispose of existing concrete improvements and install 2 pedestrian ramps, 20 lineal feet of curb and gutter, and 105 square feet of 4" sidewalk at E. 17th Street just east of National City Boulevard per the applicable regional standard drawings. The total cost for the Change Order was $4,850.00. Change Order #5: The Contractor agreed to reduce various line items of work as represented on the spreadsheet attached to Change Order #5. This was a zero sum change order. Line Item Change No. 2 was an increase in the Removal and Replacement of 4" Sidewalk. The increase was 902 feet of removal and replacement of 4" sidewalk in the amount of $4,059.00. Line Item Change No. 3 was a decrease in the Removal and Replacement of 6" Sidewalk. The decrease was 618 feet of removal and replacement of 6" sidewalk in the amount of $3,708.00. Line Item Change No. 4 was an increase in the Removal and Replacement of Pedestrian Ramps. The increase was the removal and replacement of 4 pedestrian ramps in the amount of $7,000.00. Line Item Change No. 5 was an increase in the installation of New 4" Sidewalk. The increase was 1,990 square feet of New 4" Sidewalk in the amount of $9,950.00. Line Item Change No. 6 was a decrease in the installation of New Pedestrian Ramps. The decrease was 4 pedestrian ramps in the amount of $6,000.00. Line Item Change No. 7 was a decrease in the installation of New 6" Edge Curb. The decrease was 52 lineal feet of New 6" Edge Curb in the amount of $520.00 Line Item Change No. 8 was a decrease in the installation of New Galvanized Metal Handrails. The decrease was 70 lineal feet of New Galvanized Metal Handrail in an amount of $3,150.00. Line Item Change No. 9 was an increase in the installation of Parking Spaces. The increase was 2 Parking Spaces in the amount of $1,000.00. Line Item Change No. la was an increase in the Removal and Replacement of 4" Sidewalk at Kimball Park. The increase was 171 square feet of removal and replacement of 4" Sidewalk in the amount of $1,026.00. 2 of 4 2 FINAL CONTRACT BALANCE National City Parks ADA Access Upgrades & Park Garden Specification No. 10-05 Line Item Change No. 2a was a decrease in the Removal and Replacement of 6" Sidewalk. The decrease was 2,081 square feet of removal and replacement of 6" Sidewalk in an amount of $19,607.00. Line Item Change No. 3a was a decrease in the Removal and Replacement of Pedestrian Ramps. The decrease was 2 removal and replacements of Pedestrian Ramps in an amount of $3,000.00. Line Item Change No. 4a was a decrease in the installation of New 4" Sidewalk. The decrease was 200 square feet of New 4" Sidewalk in an amount of $1,600.00. Line Item Change No. 7a was a decrease in the installation of Cross -gutter. The decrease was 850 square feet of Cross -gutter in an amount of $10,200.00. Line Item Change No. lb was an increase in Clearing and Grubbing. The increase was 2.25 times the lump sum item in an amount of $4,500.00. Line Item Change No. 6b was a decrease in the installation of 4" Compacted Decomposed Granite. The decrease was 628 square feet of 4" Compacted Decomposed Granite in the amount of $753.60. Line Item Change No. 7b was a decrease in the installation of Synthetic Wood Edging for Decomposed Granite ADA Path. The decrease was 77.5 lineal feet of synthetic Wood Edging in the amount of $155.00. Line Item Change No. lc was an increase of 6' Tall Vinyl Coated Chain Link Fence. The increase was 90 linear feet of 6' Tall Vinyl Coated Chain Link Fence in an amount of $2,700.00. Therefore, the construction bid price of $242.007.50 was decreased by $16,908.60 due to said actual construction change orders and the net balance of line item changes resulting in a final construction cost of $225,098.90. CONTRACT ADJUSTMENT: As a result of the above change orders and line item adjustments, the contract price is adjusted as follows: 1. The final contract price to date is adjusted to $225,098.90. 2. As a result of the satisfactory completion of said project, a retention amount of $16,490.62 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. 3 of 4 3 FINAL CONTRACT BALANCE National City Parks ADA Access Upgrades & Park Garden Specification No. 10-05 This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. MJC Construction will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. 4 of 4 4