HomeMy WebLinkAboutBackgroundBACKGROUND REPORT FOR THE RESOULTION APPROPRIATING UP TO $300,000 FROM KIMBALL TOWER REPLACEMENT RESERVES FOR NUTRITION CENTER UPGRADES, REPAIRS AND BUILDING CODE RENOVATIONS The significance of this request is that it requests approval to use Replacement Reserve funds from Kimball Tower to pay for repairs, upgrades and renovations to the Nutrition Center portion of Morgan Tower. The reasoning behind this request is twofold. First, the Replacement Reserve fund for Morgan Tower is a HUD restricted fund that contains, as of June 30, 2012, approximately $375,000 of which $225,000 is currently budgeted in the CIP program for roofing and HVAC replacement on Morgan Tower itself and, from a Capital Needs Assessment performed in April 2011, another $175,000 is projected to be needed in the near future to replace the aging boilers which supply hat water to the entire building. In addition, HUD requires a margin be kept in the Replacement Reserve account and diminishing the account for the repairs listed below for the Nutrition Center would not pass HUD scrutiny. Secondly, and most importantly, the Replacement Reserve account for Kimball Tower has, as of June 30, 2012, a balance of $1,203,000 and those funds are not restricted by HUD since Kimball Tower is not under any regulatory agreements constraining the use of those funds. The use of these funds for the Nutrition Center will not diminish the Kimball Tower Replacement Reserve account to the extent that there would not be enough funds for significant emergency repairs to be performed if the need arises while, at the same, programming for future capital repairs. The following items represent the major expenditures related to extending the life of the Nutrition Center well into the future and limiting ongoing, un-programmed maintenance and repair costs. Significant Structural Problems Unrelated to Flood Damage Exposed During Flood Remediation Work: • Significant moisture damage to a structural steel post and adjacent metal studs and base plate on the wall between the boiler room and kitchen where the freezer and refrigerator are and moisture damage to metal studs and base plate on the wall between the kitchen and the manager's residence. Estimated Cost is $22,000. • Mold on the back side of the drywall along the wall between the kitchen and the manager's residence. Estimated cost is $4,000. • Bad waste line fitting from dishwasher behind wall in location above. Estimated cost is included above. Replacement of Obsolete HVAC and Refrigeration Equipment: • The walk-in refrigerator is original equipment and over 30 years old and well past its Iifespan and should be replaced. A similarly aged freezer was replaced in 2010. Upon discovering the structural problems noted above when walls were opened up after the flood it was obvious that condensation leaks from the freezer, prior to its replacement in 2010, had contributed to the structural damage and that the refrigerator had a contributory impact which will probably grow over time as its condensers and motors continue to wear out. Estimated cost is $40,000. • The roof mounted ventilation unit (which also is part of the fire suppression system) is also over 30 years old and should be replaced. Estimated cost is $8,000. • The roof mounted HVAC unit is over 30 years and should be replaced. Estimated cost is $9,600. Nutrition Center Roofing Replacement • The roofing on the Nutrition Center is past its lifespan and should be replaced as a part of any Nutrition Center Upgrade. Estimated cost is $17,000. Building Code Required Upgrade • The waste disposal piping does not meet current building codes and National City ordinances related to disposing of kitchen generated grease into the sewer system and will require a major renovation to include the installation of a grease interceptor device and re -plumbing of a toilet waste Tine to avoid contamination of recoverable/recyclable grease. The estimated cost (provided without benefit of design parameters) is $65,000. General Kitchen Equipment Upgrade Allowance • Based on a cursory review of the age and condition of the current kitchen equipment (stoves, ovens, fryers, dishwasher, faucets, steam tables, drink dispensers, etc.) there should, pending a complete review, an allowance for replacement and repair. The estimated cost is $28,500. First Phase Temporary Emergency Fire Sprinkler Line Installation and Ancillary Costs • In the immediate aftermath of the July 31, 2012 flood there were several costs, most notably the installation of the emergency fire sprinkler line, related to providing for the safety and security of the tenants of Morgan Tower. These costs are approximately $26,000. Permanent Replacement of Fire Sprinkler Line • The estimated cost to replace the failed fire sprinkler line is $40,000. *The total estimated cost for these items, including a 15% contingency, is $300,000.*