HomeMy WebLinkAboutFinal Contract Balance Sheet and Final Billing Statement1 CALIFORN A +-�
1 $ '1 A _r
aoariy-
FINAL CONTRACT BALANCE
DATE: February 27, 2013
PROJECT: Citywide Safe Routes to School, Phase ill - Pedestrian Crossing Project
FY 11-12
Specification No. 12-03
TO:
Palm Engineering
7330 Opportunity Road, Suite J
San Diego, CA 92111
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION:
$556,132.00
June 25, 2012
November 16, 2012
100 Working Days
1 Working Day
101 Working Days
The Final Contract Balance reports final line item amounts and summarizes all change orders to produce
a final contract amount.
CHANGE ORDERS AND LINE ITEM ADJUSTMENTS:
Change Order #1 required a field change to modify the existing driveway condition that did not meet
Code as designed on Palmer Way. This work was performed at an agreed upon price. This Change
Order total amount was $ 1,147.01.
Change Order #2 required the use of a flagman to assist with morning school traffic. This work was
tracked on a T&M basis. This Change Order total amount was $ 2,345.76.
Change Order #3 removed and replaced a driveway at 2437 Highland to conform to ADA requirements.
The work was performed at an agreed upon price. This Change Order total amount was $ 5,089.63.
Change Order #4 added additional survey needed on Palmer Way. This work was performed on a T&M
basis. This Change Order total amount was $ B40.00.
Changer Order #5 added additional survey needed on Lanoitan. This work was performed on a T&M
basis. This Change Order total amount was $ 945.00.
FINAL CONTRACT BALANCE
National City Citywide Safe Routes to School, Phase III - Pedestrian Crossing Project, FY 11-12
Specification No. 12-03
Change Order#6 was a back charge to the contractor for soils testing. The costs associated with this
back charge were direct cost from Ninyo & Moore. This Change Order resulted in a deduct to the
contractor in the of $ 2,156.00.
All Change Orders listed above increased the total contract amount $ 8,211.40.
There were numerous line item adjustments per the attached FINAL BILLING STATEMEN-f"that resulted
in a total deduct of $ 53,256.28,
CONTRACT ADJUSTMENT:
As a result of the above change orders and line item adjustments, the contract price is adjusted as
follows:
1. The final contract price is adjusted to $ 511,087.12.
2. As a result of the satisfactory completion of said project, a retention amount of $ 25,554.36 is
set for invoice processing and payment upon the receipt of signatures and City Council's
ratification of this agreement and the Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation for furnishing
and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for
performing the work described above. Palm Engineering will not be entitled to damages or additional
payment for delays as described in the 2012 edition of the Standard Specifications for Public Works
Construction, Section 6-6,3, for performing the work as described above.
CITY OF NATIONAL CITY
Citywide Safe Routes to School,
Phase (II - Pedestrian Crossing Project
Specification No. 12-03
FINAL BILLING STATEMENT
February 27, 2013
Original
Contract
To Date
Delta
ITEM
NUMBER
DESCRIPTION
MobIllzatlorDemobilization
QUANTITY
Site
1
UNIT UNIT PRICE
#1 — 8th Street
$ 3,000,00
I AMOUNT
TOTAL QUANTITY
OR % TO DATE,
1
TOTAL AMOUNT .
TO DATE
-- -
$ 3,000.00
1
at Olive Avenue
$ 3,000.00
2
Survey, Staking, Including monument
Markers
1
$ 3,000.00
$ 3,000.00 '
1
$ 3,000.00
-
3
Clear $Gn.b
1
5,000.00
$ 5,000.00'
1
1 1$
5,000,00
-
4
Traffic Control
1
$ 3,000.00
$ 3,000.00
1 i
$ 3,000,00
-
5
Unclassified Excavation
350
$ 45.00
$ 15,750.00
244
$ 10,980.00
(4,770.00a
734-40
6
Construct 4" AC Pavement
124
$ 120.00
$ 14,880,00
130,12
$ 15,614.40
7
Construct Aggregate Base (1D")
311
$ 27.00
$ 8,397,00
198
$ 5,346,00
(3,051.00)
8
Construct 6" CFType G Curb and Gutter per
SDR5D G-2 (Modified)
206
$ 28-00
$ 5,768.00
121
$ 3,388.00
(2,380.00)
9
Construct Type 3-3 Curb per SDRSD G-6
600
$ 20.00
$ 12,000.00
585
$ 11,700.00
(300.00)
10
Construct Cross Gutter per SDRSD G-12
640
$ 10.c0
$ 6,400.00
589
$ 5,890.00
(510.001
11
Construct Sidewalk per SORSO G-7
1785
$ 6.00
$ 10.710.00
1857
$ 11,142.00
432.00
12
Construct 4" Stamped/Colored PCC Pavement
1,722
$ 7.00
$ 12,054.00
1481
$ 10,367.00
(1,687.00)
13
Construct Type A Curb Ramp per City of San
Diego Standard Drawing 50G-132
2
$ 1,900.00
$ 3,800.00
3
$ 5,700.00
1 ,900.00
14
Construct Type Cl Curb Ramp per City of San
Diego Standard DrawingSDG-134
2
$ 1,900.00
$ 3,800.00
1
$ 1,900.00
(1,900.00)
15
Construct Truncated Domes per City of San
Diego Standard Drawing S0G-130
2
$ 700.00
$ 1,400 00
2
$ 1,400-00
16
Signing, Striping and Pavement Markers
1
$ 15,000.00
$ 15,000.00
1
$ 15,000.00
-
Sub Taal Site # 1
$123,959.00
$1112,427.40
(11,531 ,60)
CITY OF NATIONAL CITY
Citywide Safe Routes to School,
Phase III - Pedestrian Crossing Project
Specification No. 12-03
FINAL BILLING STATEMENT
February 27, 2013
Original Contract
To Date
Delta
ITEM
NUMBER
DESCRIPTION
Site
Mobilization/Demobilization
CONTRACT
i QUANTITY
#t2 — Plaza
1
UNIT UNIT PRICE
Boulevard Mid
$ 3,0U0.U0
AMOUNT
-Block Pede
$ 3,000.00
QUANTITY
OR % TO DATE
Irian Crossing
1
TOTAL AMOUNT
TO DATE
$ 3,000.00
-
17
18
Survey, Staking, Including monument
Markers & Comer Markers
1
$ 3,500.00
$ 3,500.00
1
$ 3,500.00
-
19
Clearing & Grubbing
1
$ 5,000.00
$ 5,000.00
1
$ 5,000.00
-
20
Traffic Control
1
$ 3,000.00
$ 3,000.00
1
$ 3,000.00
-
21
Unclassified i xcavation
525
$ 45.00
$ 23,625.00
386.6
$ 17,397.00
(6,228.00)
22
Construct4' AC Pavement
170
$ 120.00
$ 20,400.00
175.6
$ 21,072.00
672.00
23
Construct Aggregate Base (10")
426
$ 27,00
$ 11,502.00
388.58
$ 10,491.66
(1,010.34)
24
Construct 8" CF Type G Curb and Gutter per
SIDRSUG-2{Modified)
260
$ 28.00
$ 7,280.00
225
$ 6,300.00
(980.00)
25
Construct Type B-1 Curb per SDRS D G-6
473
$ 22.00
$ 10,406.00
449
$ 9,878.00
(528.00)
26
Construct Sidewalk per SDRSD G-7
2202
$ 6.00
$ 13,212.00
1008
$ 11,448.00
(1,764.00)
27
Construct 5-1/2" thick Sidewalk per SDRSD G-7
491
$ 7.00
$ 3,437.00
84
$ 588.00
(2,849.00)
28
Construct4' StampedfColor=d PCC Pa'ernen_
1701
$ 7.00
$ 11,907.00
1549
$ 10,843.00
(1,064.00)
29
Construct 5-1/2" PCC Driveway per SDRSD G14
A, Including Portion Behind Back of Sidewalk
346
$ 7.00
$ 2,422.00
372
$ 2,604,00
182.00
30
Construct Type A Curb Ramp per City of San
Diego Standard Drawing SDG-132
1
$ 1,900.00
$ 1,900.00
1
$ 1,900.00
-
31
Construct Type C Curb Ramp per SDRSD G-29
and Detail. on Plans
1
$ 1,900.00
$ 1,900.00
1
$ 1,900.00
-
32
Construct Curb outlet - Type Aper 5DRSDD-25
1
$ 1,500.00
$ 1,500.00
1
$ 1,500_00
-
33
Construct Sidewalk Underdrain Pipe per SDRSD
D-27
2
500.00 $$
1,000.00
2
$ 1,000.00
-
34
Adjust Water Meter Frame and Cover to Grade
{Meter frame/cover provided/
3
$ 250.00
$ 750.00
3
$ 750.00
-
35
Adjust Sewer Manhole Frame and Cover to
Grade
1
$ 350.00
$ 350.00
1
$ 350.00
-
36
Adjust Irrigation Vahre to Grade
1
$ 250.00
$ 250.00
1
$ 250.00
-
CITY OF NATIONAL CITY
Citywide Safe Routes to School,
Phase III - Pedestrian Crossing Project
Specification No. 12-03
FINAL BILLING STATEMENT
February 27, 2013
Original Contract
To Date
Delta
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL QUANTC{-1(
OR % TO DATE
TOTAL AMOUNT
TO DATE
37
Provide and Install Conduit, 5ull-Boxes and all
related Work & Appurtenances for Future
Lighted Stop Bar with In -Road warning Light
Flashers (to be installed under separate City of
National City contract) Per Detail an Plans,
Also, Remove and Salvage existing In -Street
Flashers and Plug and Abandon Existing
Conduit_
•
•
1
•
•
4,000.00
$ 4,000.00
1
$ 4,000.00
-
38
Signing, Striping and Pavement Markers
1
$ 10,250.0D
$ 10,250.00
1
$ 10,250.00
-
Sub Total Site #2
Site la
1
— lei Street
$ 3,000.00
$ 140,591.00
1
$ 127,021.66
(13,569.34)
Mobilization/Demobilization
at Lanoitan Avenue
$ 3,000.00
$ 3,000.00
-
39
40
Survey, Staking, Including monument
Markers
1
$ 3,500.00
$ 3,500.00
1
$ 3,500.00
-
41
Clear & Grub
1
$ 3,000.00
$ 3,000.00
1
$ 3,000.00
-
42
Traffic Control
1
$ 4,000.00
$ 4,000.00
1
$ 4,000.00
-
43
Unclassified Excavation
230
$ 45.00
$ 10,350.00
187
$ 8,415.00
(1,935.00)
44
Construct 4" AC Pavement
88
$ 120.00
$ 10,560.00
105.65
$ 12,678.00
2,118.00
45
Construct Aggregate Base (10")
220
$ 27.00
$ 5,940.00
135
$ 3,645.00
(2,295.00)
46
Construct 6" CF Type G Curb and Gutter per
SDRSD G-2 (Modified)
272
$ 28 DD
$ 7,616.00
260
$ 7,280.00
(336.00)
47
Construct Sidewalk per SDRSD G-7
2000
$ 6.00
$ 12,000.00
2077
$ 12,462.00
462.00
48
Construct 5-1/2" FCC Driveway per SDRSD G14.
A, Including Portion Behind Back of Sidewalk
126
$ 7.00
$ 882.00
110
$ 770.00
(112.00
49
Construct Type A Curb Ramp per City of San
Diego Standard DrawingSDG-132
4
$ 1,900.00
$ 7,600.00
4
$ 7,600.00
-
50
Install Type I Pedestrian Barricade Per Caltrans
Std Plan ES-7P
1
$ 1'200.00
$ 1,200,00
1
$ 1,200.D0
-
51
Adjust Water Meter Frame and Cover to Grade
(Meter frame/cover provided)
2
$ 250.00
$ 500.00
2
$ 500.00
-
CITY OF NATIONAL CITY
Citywide Safe Routes to School,
Phase Ill - Pedestrian Crossing Project
Specification No. 12-03
FINAL BILLING STATEMENT
February 27, 2013
Original Contract
To Date
Delta
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL QUANTITY
OR % TO DATE
TOTAL AMOUNT
TO DATE
52
Adjust Sewer Manhole Frame and Cover to
Grade
1
$ 350.00
$ 350.00
1
$ 350.00
-
53
Signing, Striping and Pavement Markers
1
$ 18,750.00
$ 18,750.00
1
$ 18,750.00
-
Sub Total Site ft 3
$ 89,248.00
$ 87,150.00
(2,098.00)
Site
Mobilization/Demobilization
DA — PaInner
'I
Street, from
3 3,01:JU.00
Earle Drive to
$ 3,000.00
Palmer Way
1
3,0011.00
-
54
55
Survey, Staking, Including monument
Markers
1
$ 3,500.Ofl
3,500.00
l
1 I
$ 3,500.00
-
56
Clear & Grub
1
$ 4,000.00
$ 4,000.00
1 1
$ 4,000.00
-
57
Traffic Control
1
$ 6,000,00
$ 6,000.00
1
$ 6,000.00
-
58
Unclassified Excavation
700
$ 40.00
$ 28,000.00
422.6 .
$ 16,904.00
(11,096.00)
576.00
59
Construct 3" AC Pavement
224
$ 120.00
$ 26,880.00
228.8 .
$ 27,456.00
60
Construct Aggregate Base [8")
597
$ 27.00
$ 16,119.00
463.58
$ 12,516.66
(3,602.34)
61
Construct 6" CF Type G Curb and Gutter per
SDR5DG-2{Modified)
580
$ 2$.00
$ 16,240.00
427
$ 11,956,00
(4,284.00
62
Construct 4" CF Type G Curb and Gutter per
SDRSD G-2 {Modified)
232
$ 28.00
$ 6,496.00
162
$ 4,536.00
(1,960.00)
-
63
Construct Type A AC Dike per SDRSD G-5
18
$ 30.00
$ 540.00
18
$ 540.00
64
Construct Cross Gutter per SDR5 D G-12
2015
$ 10.00
$ 20,150.00
1460
$ 14,600.00
(5,550.00)
65
Construct Sidewalk per SDRSD G-7
4675
5 6-00
$ 28,050.00
4723
$ 28,338.00
288.00
66
Construct 5-1/2" PCC Driveway perSDRSD G14
A, Including Portion Behind Back of Sidewalk
637
7.00
$ 4,45900
540
$ 3,780.04
{679.00}
67
Construct Type A Curb Ramp per City of San
Diego Standard Drawi-ig 5DG-132
12
$ 1,900.00
$ 22,800.00
12
$ 22,800.00
-
68
Install Type I Pedestrian Barricade Per Ca/trans
Std Plan ES-7P
2
$ 1,200.00
$ 2,400.00
2
$ 2,400.00
-
60
Adjust Water Meter Frame and Cover to Grade
(Meter frame/cover provided)
3
$ 250.00
$ 750.00
4
$ 1,000.00
250.00
70
Adjust Sewer Manhole Frame and Cover to
Grade
2
$ 350.00
$ 700.00
2
$ 700.00
-
71
Adjust Irrigation Valve to Grade
1
$ 250.00
$ 250.00 :
1
$ 250.00
A -
CITY OF NATIONAL CITY
Citywide Safe Routes to School,
Phase III - Pedestrian Crossing Project
Specification No. 12-03
FINAL BILLING STATEMENT
February 27, 2013
Original Contract
To Date
Delta
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITY
UNIT PRICE
AMOUNT
TOTAL QUANTITY
OR % TO DATE
TOTAL AMOUNT
TO DATE
72
Signing, Striping and Pavement Markers
1
$ 12,000.00
$ 12,000.00
1
$ 12,000.00
-
Sub Total Site IP 4
$ 202,334.00
$ 176,276.66
(26,057.34)
ORIGINAL CONTRACT ITEMS
$ 556,132.00
FINAL CONTPACT�MS
Modify d riveway on Palmer Way
502.875.72_��gfl
CCO#1
1
1,747.U1
$ 1,147.01
-
$ 1,147.u'I
-
CCO#2
riagman
1
$ 2,345.76
$ 2,345.76
1
$ 2,345.76
-
CCO#3
2437 Highland driveway
1
$ 5,089.63
$ 6,089.63
1
$ 5,089.63
-
CCO#4
Additional Survey on Palmer Way _
1
$ 840.00
$ 840.00
1
$ 840.00
-
CCO#5
Lanoitan Survey
1
$ 945.00
$ 945.00
1
$ 945.00
_ -
CCO#6
Soils Testing Charges
1
$ {2,166.00)
$ {2,156.00)
1
$ (2,156.00)1
-
Sub Total Change Orders
$ 8,211.40
$ 8,211.40
-
FINAL ADD/DEDUCT
(53,256.281
$ 564,343.40
$ 511.087.12