HomeMy WebLinkAboutFinal Contract Balance Sheet'CALIFORNIA ' * q¢YCORp OB.it'rg FINAL CONTRACT BALANCE DATE: March 6,2013 PROJECT: Drainage Improvements Project, Specification No. 11-07 TO: Palm Engineering Construction 7330 Opportunity Road, #3 San Diego, CA 92111 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $187,212.90 May 9, 2012 July 20, 2012 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 30 working days 20 working days 50 working days This Final Contract Balance reports final line item amounts and summarizes all change order to produce a final contract amount, Please see attached Contract Final Balance sheet. DISCUSSION: Change Orders and Line Item Adjustments Change Orders #1 addedpotholing + Street after it determined Change Order :,� utilities on D �tree� was that there was an existing high-pressure gas main at 5th Street that would not have enough concrete cover once the work was complete. This Change Order added 60 LF of concrete cover. The total increase in price this work was $1,800.00. Change Order #2 increased Change Order #1 by 40 LF after it was determined in the filed that it was necessary to do so. This Change Order added 40 LF of concrete cover at the same unit price as Change Order #1. The total increase in price this work was $1,200.00. FINAL CONTRACT BALANCE National City Drainage Improvements Specification No. 11-07 Change Order #3 was for the removal and disposal of an abandoned asbestos concrete pipe (ACP) that was not shown as existing on the original plans. The total increase in price for this work was S1,081.31. Change Order #4 was for the potholing at the third phase of the project that was not included in the original contract line items and was not completed due to the lack of adequate funding. The total increase in price for this work was $2,948.53. Change Order #5 reconciled all the line iierrr work acivally performed and delivered to the project. Details are outlined below for the line item changes. The total decrease in price was (-14,307.53). Base Bid for 5th & D Streets: Line Item No. 4: "Excavation & Disposal of Unsuitable Subgrade and Replacement with CAB" was increased by 130 TONS for an increased cost amount of $7,800.00. Line Item No. 5: "Curb & Gutter (Modified G-2 including Transitions)" was increased by 147 LF for an increased cost amount of $4,410.00. Line Item No.8: "PCC Sidewalk (G-7)" was increased by 51 LF for an increased cost amount of $408.00. Line Item No. 10: "'3' Asphalt Grind" was increased by 2,453 SF for an increased cost of $5,641.90. Line Item No. 12: "Asphalt Concrete" was increased by 91.01 TONS for an increased cost of $12,468.37. Additive Bid "A" for 5`h & C Streets: Line Item No. 4: "Excavation & Disposal of Unsuitable Subgrade and Replacement with CAB" was increased by 5.47 TONS of "for an increased cost amount of $328.20. Line Item No. 5: "Curb & Gutter (Modified G-2 including Transitions)" was increased by 36,5 LF for an increased cost amount of $975.00. Line Item No.8: "PCC Sidewalk (G-7)" was increased by 25 LF for an increased cost amount of $200.00. CONTRACT ADJUSTMENT: As a result of the above change orders and line item adjustments, the contract price is adjusted as follows: 2 of4 FINAL CONTRACT BALANCE National City Drainage Improvements Specification No. 11-07 1. The final contract price to date is adjusted to $179,935.21. 2. As a result of the satisfactory completion of said project, a retention amount of $1,244.20 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered fall compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Palm Engineering Construction will not be entitled to damages or additional payment for delays as described in the 2012 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. 3 of 4 CITY OF NATIONAL CITY National City Drainage improvements Specification No. 11-07 FINAL CONTRACT BALANCE, ATTACHMENT "A" March 6, 2013 Original Contract To Date Delta No. Item Unit Quantity lUnit Price Amount !Final Quantities Amount Base Bid for 5th & D Streets: i 1 Mobilization/Demobilization LS 1 2,000.00 2,000.00 1.00 2,000.00 - 2 Traffic Control LS 1 2,500.00 2,500.00 . 1.00 2,500.00 - 3 Demolition, Excavation, and Disposal LS 1 2,000.00 2,000.00 1.00 2,000.00 - 4 Excavation & Disposal of Unsuitable Subgrade and Replacement with CAB TON 50 60,00 3,000.00 180.00 10,800.00 7,800.00 5 Curb & Gutter (Modified G-2 including Transitions) LF 204 30.00 6,120.00 351.00 10,530.00 4,410.00 6 Pedestrian Ramp (G-28) EA 4 2,000.00 8,000.00 4.00 8,000.00 - 7 Cross Gutter (G-12 modified with #4 rebar 24" O.C. each way) EA 2 4,500.00 9,000.00 2.00 9,000.00 - 8 PCC Sidewalk (G-7) SF 300 8.00 2,400.00 361.00 2,808.00 408.00 9 1.5" Asphalt Grind SF 97 2.00 194.00 97.00 194.00 - 10 3" Asphalt Grind SF 2,453 2.30 5,641.90 4,906.00 11,283,80 5,641.90 11 Crushed Aggregate Base TON 455 40.00 18,200.00 456.00 18,200.00 - 12 Asphalt Concrete TON 253 137.00 34,661,00 344.01 47,129.37 12,468.37 13 Sign Relocation EA 2 563.00 1,126.00 i 2.00 1,126.00 - 14 Replacement of Striping and Pavement Markings LS 1 1,250.00 1,250.00 1.00 1,250.00 - 15 Street Survey Monument (M-10) EA 1 200.00 200.00 1,00 200.00 - 16 Bonds LS 1 1,000.00 1,000.00 1.00 1,000.00 - Additive Bid "A" for 5th & C Streets: - 1 Mobilization/Demobilization LS 1 1,000.00 1,000.00 1.00 1,000.00 - 2 Traffic Control LS 1 1,500.00 1,600.00 1.00 1,500.00 - 3 Demolition, Excavation, and Disposal LS 1 1,500.00 1,500.00 1.00 1,500.00 - 4 Excavation & Disposal of Unsuitable Subgrade and Replacement with CAB TON 50 60.00 3,000.00 55.47 3,328.20 328.20 5 Curb & Gutter (Modified G-2 including Transitions) LF 64 30.00 1,920.00 96.50 2,895.00 975.00 6 Pedestrian Ramp (G-28) EA 2 2,000.00 4,000.00 2.00 4,000.00 - 7 Cross Gutter (G-12 modified with #4 rebar 24" D.G. each way) EA 1 4,500.00 4,500,00 1.00 4,500,00 - 8 PCC Sidewalk (G-7) SF 150 8.00 1,200,00 175.00 1,400,00 200.00 9 1.5" Asphalt Grind SF 135 2.20 297.00 135.00 297.00 - 10 Crushed Aggregate Base TON 155 50.00 7,750.00 155.00 7,750,00 - 11 Asphalt Concrete TON 85 165.00 14,025.00 85.00 14,025.00 - 12 Sign Relocation EA 2 663.00 1,126.00 2.00 1,126,00 - 13 Striping and Paving Markings LS 1 813.00 813.00 1.00 1 813.00 - 14 Bonds 1 750.00 750.00 1.00 750.00 - Additive Bid "B" for 4th & D Streets: 1 iMobi!Ization/Derrobilization LS 1 1,500.00 1,500,00 - - (1,500.00) (1,500.00) 2 Traffic Control LS 1! 1,500.00 1,500.00 - - 3 n etiG"• 4r, ExvQ7atiii , S,:Disposal i LS 1 1,500.00 i 1,500,04 I - (1,51X.00) , 4 Excavation & Disposal of Unsuitable Subgrade and Replacement with CAB TON 50 1 60.00 3,000.00 - - I (3,000.00) 5 Pedestrian Ramp (G-28) I EA 4 2,000.00 8,000.00 1 - - (8,000.00) 6 Cross Gutter (G-12 modified with #4 rebar EA 2 4,500.00 9,000.00 - - (9,000.00) 7 PCC Sidewalk (G-7) SF 300 8.00 2,400.00 - - (2,400.00) 8 1"- 2" A.sohalt Grind SF 937 3.00 2,811.00 - - (2,811.00) 9 Crushed A greate Base TON 50 60.00 3,000.00 - - (3,000.00) 10 Asphalt Concrete TON 50 190.00 9,500.00 - - (9,500.0C) 11 Sign Relocation EA 4 410.00 1,640 00 - - (1,640.00) (1,688.00) 12 Stripina and Paving Markings LS 1 1,688.00 1,688.00 - - 13 Bonds ; LS 1 1,000.00 1,000.00 - . - (1,000.00) Original Contract Total ! 187,212.90 Change Orders 1 Install 80 LF of Concrete Cover LS 1 1,800.00 1,800.00 1.00 1,800.00 s - 2 Instali 40 LF of Cor:crete Cover LS 1 1,200.00 1,200.00 1.00 1,200.00 - 3 Remove and dispose of ACP LS 1 i 1,081.31 1,081.31 1.00 1,081.31 - 4 Potholing at 4th1D LS 1 2,948.53 2,948.53 1.00 2,948.53 5 Reconciling Line Item AdJustmetns LS 1 (14,307.53) 1.00 - I (14,307.53) 'TOTALS: 194,242.74 179,935.21 I