HomeMy WebLinkAboutFinal Contract Balance Sheety, Y » CALIFORNIA • cos FINAL CONTRACT BALANCE RETENTION REDUCTION DATE: May 13, 2013 PROJECT: 8th Street Undergrounding and Sewer Replacement, Specification No. 11-04 TO: Basile Construction, Inc 7952 Armour Street San Diego, CA 92111 ORIGINAL CONTRACT AMOUNT: START DATE: . COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $2,386,365.49 May 7, 2012 January 28, 2013 (includes downtime due to multiple change orders, correctional work, clean-up, inspection, and document delays) 180 working days 0 working days 180 working days This Final Contract Balance reports final line item amounts and summarizes all changes to produce a final contract amount. Please see Attachment "A" to this Final Contract Bal ance. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: Change Order #1 provided for the removal of line items for Media 3 utility company as they were removed from the utility undergrounding project. 'ihis Change Order removed Media 3 Line Items from the original contract. This is a zero sum change order the decrease for which is reflected in line items 41(S)-44(S) below. Change Order #2 provided for the undergrounding of Access Cable utilities by furnishing and installing 2" CATV conduit in a trench under D Avenue from the south side of the 8th Street to the north side of 8th Street which was not included in the original plans. This Change Order increased the total contract amount by $2,304.28. Change Order #3 provided for the installation additional joint trench due to an existing abandoned asbestos cement waterline pipe (ACP) that was not shown on the original plans. This Change Order increased the total contract amount by $5,652.03. FINAL CONTRACT BALANCE Bch Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #4 provided for hand excavations not calculated in the Contractor's bid price due to unmarked abandoned utility conduits not shown as existing on the original plans. This Change Order increased the total contract amount by $398,07. Change Order #5 provided for the relocation of an angled sewer lateral to be installed perpendicular to the sewer main connection point in order to comply with the City's sewer lateral installation standard. This Change Order increased the total contract amount by $707.76. Change Order #6 provided for potholing at multiple locations to determine the location of sewer lateral that did not comply with the City's sewer lateral installation standard. This Change Order increased the total contract amount by $1,618.49. Change Order #7 provided for hand excavations not calculated in the Contractor's bid price due to an unmarked abandoned utility conduit that was not shown as existing on the original plans. This Change Order increased the total contract amount by $720.89. Change Order #8 provided for the installation of higher capacity Cable TV vaults at the request of COX Communications and COX agreed to fully compensate the City for the cost of this change order. The Change Order increased the total contract amount by $6,940.18. Change Order #9 provided for the removal and disposal of unsuitable subgrade and the importation of suitable subgrade. This Change Order increased the total contract amount by $1,803.74. Change Order #10 provided for the installation of underground utilities on the southeast comer of the Harbor View Condo Project on 8th Avenue and D Street. This Change Order increased the total contract amount by $6,126.80. Change Order #11 provided for the removal of additional existing electrical conduit that was not shown as existing on the original plans. This Change Order increased the total contract amount by $2,817.69. Change Order #12 provided for a locking manhole cover required by City safety standards but not called for in the original contract. This Change Order increased the total contract amount by $247.83. Change Order #13 provided for additional soil excavation and placement of a larger shoring box to remove an encased 18" drop sewer main not shown as existing on the original plans. The Change Order increased the total contract amount by $3,308.78. Page 2 FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #14 provided for time and materials for breaking and removing of unmarked concrete encased drop sewer mains. This Change Order increased the total contract amount by $5,675,93. Change Order #15 provided for time and materials for the completion of the removal of unmarked concrete encased drop sewer mains. This Change Order increased the total contract amount by $3,437.17, Change Order #16 provided for the removal of additional oversaturated subgrade and the pumping out of additional fluid due to an unmarked old concrete sewer main. This Change Order increased the total contract amount by $5,381.95. Change Order #17 provided for the installation of a concrete plug in the unmarked existing sewer main. This Change Order increased the total contract by $746.10. Change Order #] 8 provided for the removal and disposal of an unmarked existing sewer main and unsuitable subgrade and replacement with 82 tons of suitable import material. This Change Order increased the total contract by $6,441.92. Change Order #19 provided for the adjustment of AT&T line item quantities to reflect actual quantities installed. This Change Order increased the total contract by $81,897.96. Change Order #20 provided for the adjustment of SDG&E line item quantities to reflect actual quantities installed. This Change Order increased the total contract by $136,281.27. Change Order #21 provided for the installation of three (3) additional lighting units in the lighted crosswalk at 8tr Street and E Avenue to restore crosswalk to fully functioning condition. This Change Order increased the total contract by $13,649.55. Change Order #22 provided for the removal and reconnection of sewer laterals not shown as existing on the original plans. This Change Order increased the total contract by $2,943.03. Change Order #23 provided for the Contractor to locate an unknown "Y" connection at the private property line so a perpendicular lateral could be installed. This Change Order increased the total contract by $362.23. Change Order #24 provided for the removal and reconnection of a sewer lateral from the private property connection to the sewer main. This Change Order increased the total contract of $893.39. Page 3 FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Change Order #25 provided for the installation of the SS Straps, SS Anchor Bolts, and application of epoxy to maintain the sewer pipe installed inside manholes MH264, 60, & 60A to accommodate the elevation changes at these manholes. This Change Order increased the total contract by $3,346.46. Change Order #26 provided for the removal of five (5) 3312 handholes and the installation of one (1) 3311 handhole (single) and four (4) 3311 handholes (double). This Change Order increased the total contract by $2,467.50. Change Order #27 provided for the installation of 3' x 5' pull boxes at 2 locations instead of 2' x 3" pull boxes called for in the contract. This Change Order increased the total contract by $4,032,00. Change Order #28 provided for an additional move on to complete Change Order #10 due to a delay by SDG&E in setting a utility pole. This Change Order increased the total contract by $525.00. Change Order #29 provided for an adjustment in bond costs incurred by the Contractor due to additional work. This Change Order increased the total contract by $2,089.78. Change Order #30 provided for additional excavations and the installation of four sewer sleeves due to conflicts with proposed dry utilities. This Change Order increased the total contract by $2,491.78. Line Item #4, "Remove and replace sidewalk repairs", was decreased by 1,000 SF for a decrease in the total contract of $12, 310.00. Line Item #7, "Protection post installation per SDRSD", was increased by 7 EA for an increase in the total contract amount of $2,471.70. Line Item #36(S), "Trench for CATV only", was decreased by 224 LF for a decrease in the total contract amount of $13,901,44, Line Item #37(S), "Furnish and install CATV(1)-3" conduit"; was decreased by 896 LF for a decrease in the total contract amount of $2,204.16. Line Item #38(S), `Furnish and install CA T V(1)-2" conduit", was decreased by 1,566 LF for an increase in the total contract amount of $2,599.56. Line Item #41(S), "Furnish and install CATV(1)-3" conduit", was decreased by 60 LF for a decrease in the total contract amount of $147.60. Line Item #42(S), "Furnish and install CATV(1)-2" conduit", was decreased by 18,390 LF for a decrease in the total contract amount of $30,527.40. Page 4 FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Line Item #43(S), "Furnish and Install CATV SGL 17"x30"x12""', was decreased by 15 EA for a decrease in the total contract amount of $9,469.5 i. Line Item #/14(S), "Furnish and Install CATV DBL 17"x30"x24", was decreased by 9 EA for a decrease in the total contract amount of $6,596.55. Line Item #48, "Replace 10" PVC Sewer Main (less than 6' depth)", was decreased by 92 LF for a decrease in the total contract amount of $12,731.88. Line Item #49, "Replace 8" PVC Sewer Main (6'-10' depth)", was decreased by 16 LF for a decrease in the total contract amount of 1,820.16. Line Item #50, "Replace 10" PVC Sewer Main (6-10' depth)", was increased by 65 LF for an increase in the total contract amount of $6,777.55. Line Item ##52, "Replace 15" PVC Sewer Main (6-10' depth)", was decreased by 23 LF for a decrease in the total contract amount of $2,555.76. Line Item #53, "Replace 15" PVC Sewer Main (10-20' depth)", was increased by 5 LF for an increase in the total contract amount of $851.35. Line Item #54, "Replace 21" PVC Sewer Main (10-20' depth)", was decreased by 13 LF for a decrease in the total contract amount of $7,638.96. Line Item #55, "Install 6" PVC Sewer Laterals SDARSD SS-01", was increased by 47 LF for an increase in the total contract amount of $5,266.35. Line Item #57, "Install Sewer ivianhole SDARSD SM-02 (6'40' depth) with ivianhoie Cover M-3", was increased by 1 EA for an increase in the total contract amount of $9,162.29. Line Item #60, "Sewer Main Concrete Encasement, SDARSD SP-03", was increased by 20 LF for an increase in the total contract amount of $951.20. Line Item #61, "Remove and Replace Cross Gutter SDARSD G-12", was increased by 224 SF for an increase in the total contract amount of $299.52. Line Item #62, "Replace Survey Monument SDARSD M-10", was increased by 1 EA for an increase in the total contract amount of $1,248.00_ Line Item #65, "Remove, Dispose 8 Replace Unsuitable Backfiii Material", was increased by 916.37 for an increase in the total contract amount by $26,070.73. Line Item #66, "Remove and Replace Sidewalk, SDARSD G-7", was increased by 282 SF for an increase in the total contract amount of $2,089.62. Page 5 FINAL CONTRACT BALANCE 8th Street Undergrounding and Sewer Replacement Specification No. 11-04 Line Item #68, "Asphalt Rubber Hot Mix Overlay", was decreased by 55.52 TONs for a decrease in the total contract amount of $7,820.34. Line Item #69, "Asphalt Concrete Dig -outs and Replacement", was decreased by 174.74 TONs for a decrease in the total contract amount of $28,971.89. Line Item #70, "Remove, Disposal & Replace Unsuitable Sub -grade Material", was decreased by 100 TONs for a decrease in the total contract amount of $7,856.00_ Line Item #72, "Remove & Replace 6"-8" Curb and Gutter, SDARSD G-2", was decreased by 19 LF for a decrease in the total contract amount of $823.08. Line Item #73, "Remove & Replace Drive Way, SDARSD G-14", was increased by 20 SF for an increase in the total contract amount of $273.60, Line Item #74, "Remove & Replace Cross Gutter, SDARSD G-12", was increased by 59 SF for an increase in the total contract amount of $807.12. Line Item #75, "Remove & Replace Pedestrian Ramps (all types as required)", was decreased by 2 EA for a decrease in the total contract amount of $5,244.00. CONTRACT ADJUSTMENT: As a result of the above change orders, the contract price is adjusted as follows: 1. The final contract price is adjusted to $2,599,924.99. 2. As a result of the satisfactory completion of said project, a retention amount of $129,424.57 is set for payment upon the City Council's authorization to release the retention. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Basile Construction, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 6 City of National City 8th Street Utility Linde:grounding and Sewer Repiacemeri Specification No. 11-04 Final Contract Balance, Attachment "A" May13,2013 Original Contract '1'o Data Delta.* No. I Item Ur. Quantity Unit Price Amount Quantity ;Amount GENERAL WORK FOR DRY UTILITY WORK 1 Mobirmatlen&Demobil¢ation [LS 1 5,871.00 5,871.00 1.00 5,671.00 - 2 SWPPP !mpiementaticn ,LS 1 5,344.65 5,344.65 1.00 5,344.65 - 3 Traffic Control LS 1 12,759.75 12,759.76 1.00 12,759.75 - 4 Remove arsd Replace Sidewalk Repairs Outside of Construction Limits SF 1,000 12.31 12,310.00 - (12,310.00) 5lmprovements Protection and Restoration of Private LS 1 16,75620 16,756.20 1.00 16,758.20 - 6 Shoring and Bracing LS 1 4,815.00 4,815.00 1.00 4,815.00 - 7 Protection Post Installation per SDRSD WM-04 EA 20 353.10 7,062.00 I 27.00 9,533.70 2,471.70 8 Construction Staking LS 1 8,881.00 8,881.00 1.00 8,881.00 - 9 Replace Traffic Signal Loop EA 50 251.45 12,572.50 50.00 12,572.50 - 10 Replace Signing, Striping and Pavement Markings LS 1 9.737.00 9,737,00 1.00 9,737.00 ELECTRIC UNDERGROUNDING (SAG&E) 11(5) Mainline Joint Trench LF 6,250 79.18 494,875,00 6,250.00 494,875.00 - 12(S) Private Property Service Trench LF 930 28.89 26,867.70 930.00 23,867.70 - 13(S) Furnish artd Instal! Electric Conduit, 5" LF 1,280 4.92 6,297.60 1,280.09 8,297.60 - 14{S) Furnish and Install Electric Conduit, 4" LF 8,550 4.01 34,285.50 8,550.00 34,285.50 - 15(S), Furnish and Install Electric Conduit, 3" LF 5,420 2.73 14,796.60 5,420.00 14,796.60 - 16(S) Furnish and install Electric Conduit, 2" LF 130 1.82 236.60 130.00 236.60 - 17{S) Furnish And Install Electric Handhole Equipment Enclosure 3312 HH EA 6 251.45 1,508-70 6.00 1,508.70 18(S) Fumish And install Electric Handhole Equipment Enclosure 3313 HH with Traffic Cover EA 5 1,578.25 7,891.25 5.00 7,891.25 - 19(S) Furnish And Install Electric Handhole Equipment Enclosure 3313 HH with Parkway Cover EA 2 1,535.45 3,070.90 2.00 3,070.90 - 20(S) Furnish And Install Electric Handhole Equipment Enclosure 3314 HH with Parkway Cover EA 1 5,896.15 6,896.15 1.00 6,896.15 21(S) Furnish And Install Electric Handhole Equipment Enclosure 3315 HH with Parkway Cover EA 1 9,399.95 9,399.95 1.00 9,399.95 - ( 22(S) Furnish and Install Electric Transformer 3427EA Concrete Pad 1 2,819.45 2,819.45 1.00 2,819.45 23(S) Furnish And Install Electric 3316 HH withEA Traffic Cover I 3 11,984.00 35,952.00 3,00 35,952.00 24(S) Furnish and Install Electric Ha xihote Equipment Enclosure 3309.2 HH EA ;4 770.40 10,785.60 i 14.00 10,785.60 - 25(S) Furnish And Instal! Electric 3316 M 1 with Parkway Cover EA 1 12,385.25 12,385.25 1.00 12,385.25 - �.,. zti,b, F!.irn'Rh An Instal! Elevt'irt Transformer 3421 Cannata Pad 1, 19 572.45 10,876 55 19.00 10,876.55 - 27(S) Adjust Handhole to Finished Grade EA 6 802.50 4,815.00 5.00 4,816.00 - 28(S) Concrete Encasement LF i 6,950 9.10 63,245.00 6,950.00 I 63,245.00 - COMMUNICATIONS (AT&T) UNDF-RGROUNDING 1 29(S)1Trenc!, for Ter4-.:-. Only LF 775i 62.08 I 48,096.50 775.00 48,096.50 - 30(S) Furnish and install Telephone 2' Conduit LF i 980 1.82 1,783.60 980-00 1,783.60 - 31(S) Furnish and Install Telephone 4" Conduit LF 5,220 3.42 , 17,852,40 5,220.00 17,852.40 - 32(S) Furnish and Insa6 Telephone CMPH wi Ground EA 2 920.20 1,840.40 2.90 1,840.40 - i 33(5) Furnish and irsaa Telephone CPLM12 :EA 4 624.88 i 2,49,3.52 4.00 2,499.52 - 34(S) 3'm�h and Instil Telephone Pullbox 2' x 3' x EA 5 1,888.55 9,442.75 5.00 9,442.75 - 'Furnish 35(S' and lastall Telephone Pd1box 3'x5'x4' • (w1 drag off cover) EA 1 3,086.95 3,086.95 1.00 3,086.95 - COMUNICATIONS (COX) UNDERGROUNDING 36(S) Trench for CATV Only LF 500 62.06 i 31 030.00 276.00 17,128.56 (13,901.44) (2,294.15) 37(S) Furnish and Install CAT V (1 }3" Conduit LF ; 980 2.46 2,410.80 l 84.00 206.64 38(S) Furnish and Install CATV (1)-2' Conduit LF 20,650 1.68 34,279.00 22,2:6.00 36,878.56 2,599.58 39(S) Furnish and Install CATV SGL 17560-x12" EA 15 631.30 9,469.50 15.00 9,469.50 - 40(S) Furnish and Install CA V DBL 175x30'04" EA 9 732.95 6,596.55 9.00 6,596,55 - COMMUNICAT7ONS (MEDIA 3) UNDERGROUNDING 41(5)1 LF 60 2.46 147.60 (147.60) 42(S)!Furr sh and instal! CATV (1)- 2" Condit LF 18,750, 1.66 I 31,125.00 360.001 597.60 (30,527.40) 43(S) ruin'sh and install CA'V SGL 17°x30"x12' EA 45' 631.30 0,480.50 (9,469.50) (6,596.55) 44(£.) Furnish and install CATV DBL 17°x30"x24" EA 0 732.°5 5,506 55 GENERAL WORK FOR STREET IMPROVEMENTS BETWEEN HIGHLAND AVENUE & K ST AND ALL SEWER WORK 45;Mobi'.izat::orJDerrob3zafian LS I 1. 104,615.89 104,615.89 ` 1.00 104,615.89 - 46;Traffic Control LS . 11 14,945.25 `4,945.25 1.00 14,945.25 - SEWER REPLACEMENT 47 Shoring and Bracing LS ... 16,370.07 16,370.07 1.00 16,370.07 48 Replace ;C" PVC Sewer Main (less Man 6' depth)(12,. LF 202 138.39 27,954.7B 110.00 15,222.90 31.88) 49 Replace 8" PVC Sewer Main (6'-10' depth) LF 995 113.76 113,191,20 979.00 111,371.04 (1,820.16) 8,7777.55 50 Replace 10" PVC Sewer Main (6-10' depth) LF 1,193 104.27 124,394.11 1,258.00 131,171.66 51 Replace 15" PVC Sewer Frain (less than 6' depth) �LF 330 140.13 46,242.90 330.00 46,242.90 - 52 Replace 15" PVC Sewn, Main (6-10' depth) LF 464 111.12 51,559 hex I 441.00 49,003.92 (2.555.76) 851.35 53 Replace 15" PVC Sewer Main (10-2 ;' depth) LF 240 170.27 40,864.80 245.00 41,716,15 54 Replace 21' PVC Sewer Main (10-20' depth) LE 67 545.64 36,557.88 53.00 28,918.92 I (7,638.96) 5,268.35 55 Install 6" PVC Sewer Laterals SDARSD SS-01 LF 1,750 112.05 196,087.50 1,797.00 201,353.85 56 Install Sewer Manhole SDARSD SM-02 (less than 6' depth) EA 3 9,377,56 28,132.68 3.00 28,132.68 57 install Sewer Manhole SDARSD SM-02 (6'-10' depth) with Manhole Cover M-3 EA 9 9,162 29 82,480.61 10.00 91,622.90 9,162.29 56 Install Sewer Manhole SDARSD SM-02 (greater than 10' depth) with ivianhoie Cover M- 3 EA 3 12,381.19 37,143.57 3.00 37,143.57 - 59 Install 6" PVC Sewer Lateral Cleanouts SDARSD SC-01 Type 8 with PVC cap and Connecilon to Existing Sewer Lateral EA 43 574.80 24,716.40 43.00 24,710.40 - 60Sewer Main Concrete Encasement, SDARSD SP-03 LF 60 47.56 2,853.60 80.00 3,804.80 951.20 61 Remove and Replace Cross Gutter SDARSD G-12 SF 200 12.48 2,496.00 224.00 2,795.52 299.52 62 Replace Survey Monument SDARSD M-10 EA 5 1,248.00 6,240.00 8.00 7,488.00 1,248.00 63 Replace Traffic Loop EA 40 312.00 12,480.00 40.00 12,480.00 - Remove, Salvage and Replace In -Pavement In Roadway Lighted Crosswalk at 8th & E Street LS 1 15,080.00 15,080,00 1.00 15,080A0 - 65 Remove, Dispose & Replace Unsuitable Backfill Material TON 500 28.45 14,225.00 1,416.37 40,295.73 26,070.73 STREET IMPROVEMENTS HIGHLAND AVENUE TO K STREET 66 Remove and Replace Sidewalk, SDARSD G-7 SF 725 7.41 5,372.25 1,007.00 7,461.87 2,089.62 67 Asphalt Concrete Cold Milling SF 9,500 0.48 4,564.00 9,500.00 4,560.00 - 68 Asphalt Rubber Ftot Mix Overlay TON l 800 171.80 137,440.00 754.48 129,619.66 I (7,820.34) (28,971.89) (7,856.00) 69 Asphalt Concrete Dig -outs and Reptacemant !TON 750 165.80 124,350.00 I _ 575.26 95,378.11 70 Remove, Disposal & Replace Unsuitable Sub grade Materlat TON 100 1 78.56 7,856.00 I 71 Asphalt Roadway Crack Filling SY 6,240 0.89 5,553.60 6,240.00 5,553.60 - 72fRemove PSDARSD & Replace 8" 8° Curb and Gutter, .LF G-2 60 43.32 2,599.20 41.00 1,776.12 (823.08) 73 Remove & Replace Drive Way, SDARSD G-14 SF 400 13.88 5,472.00 420.00 5,745.60 273.60 74 Remove5.Replace Cress Gutter, SDnRS? G- 12 SF 200 13.66 2,736.00 259.00 3,543.12 807.12 75 Remove & Replace Pedestian Ramps (ail types as required) EA 10 2,622.00 26,220.00 8.00 20,976.00 (5,244.00) 76 Replace Traffic Loop EA 10 342.00 3,420.00 10.00 3,420.00 - 77 Traffic Str!p:no and Marking LS 11 3,534.00 3,534.00 1.00 3,534.00 - TOTAL ORIGINAL CONTRACT AMOUNT: 2,385,365.42 CHANGE ORDERS 1 Remove Media 3 from Project' LS 1 (46,691.25) (46,691.25) - - 46,691.25 2 Furnish and Instill 2" CATV Conduit (Access Cable) LS 1 2,304.28 2,304.28 1.00 2,304.28 - 3 Backfill existng and stall additroral trench due to location of ACP pipe LS 1 5,652.03 5,652,03 1.00 I 5,652.03 4 T&M - Unmarked Utilites at Highland L5 1 398.07 398.07 1.00 398.07 - 5 T&M - Angled Lateral LS 1 707.76 707.76 1.00 707.76 - 6 T&M - Edgerton Potholing LS 1 1,618.4-9 1,616.49 ',00 1.618.49 - 7 T&M - t-landdiq and mini ex excavation LS 1 720.83 720.89 1.00 , 720.89 - 8 Install higher capacity Cox Cable vaults LS 1 6,940.18 6,940.18 1.00 6,940.113 - 9 Place Unsuitable sub -grade in alley LS 1 1,803.74 1,803.74 1.00 1,803.74 - 10 Harbor View undergrounding LS 1 11 6,126.80 6,126.80 1.00 6,126.80 - 11 Remove and dispose of electric conduit LS 1 2,817.69 2,817.69 1.00 2,817.69 - 12 install locking manhole cover LS 1 247.53 247.83 1.00 247.83 - 13 Remove and clspose of Drop Main (7/25) LS 1 3,308.78 3,308.78 1.00 3,308.78 - 14 Remove and dispose of Drop Main (7126) LS 1 5,675.93 5,675.93 1.00 5,675.93 - 15 Remove and dispose of Drop Main (7127) LS 1 3,437.17 3,437.17 1.00 3,437.17 - 16 Remove concrete encases sewer main LS 1 5,381.95 5,3.81.95 1.00 5,381.95 17 Concrete plug and fill LS 1 746.10 746.10 1.00 746.10 - 18 Remove unsuitable material and place suitable material LS 11 6,441.32 6,441.92 1.00 6,441.92 19 AT&T Line Item Certification LS 1 81,897.96 81,897.96 1.00 81,897.96 - 20 SDG&E Lfne kern Certification LS 1 136,281.27 136,281,27 1.00 136,281.27 - 21 In -pavement Lights L5 1 13,649.55 13,649.55 1.00 13,649.55 - 22 West End Lateral LS 1 2,943.03 2,943.03 1.00 2,943.03 - 23 "Y° at Edgerton LS 1 362.23 362.23 1.00 362,23 - 24 Unknown Lateral at MH &1 LS 1 893.39 893.39 1.00 893.39 - 25 Manhole Straps, Anchors LS 1 3,346.46 3,346.46 1.00 3,346.46 - 26 SDG&E Hand Holes LS 1 2,467.50 2,467.50 1.00 2,467.50 - 27 AT&T Pull Boxes LS 1 4,032.00 4,032.00 1.00 4,032.00 - 28 Re -Mobilization for Change Order No. 10 LS 1 525.00 525.00 1.00 525.00 - 29 Bond Change Order LS 1 2,089.78 2,089.78 1.00 2.089.78 - 30 Installation of Sewer Sleeves LS 1 2,491.76 2,491.78 1.00 1 2,491.78 - « COI Is not reflected in 'To Date" amount because it Is already reflected 'To Date" In Line Items 41-44. If C61 were drawn across it would be reflected twice: once Fri Line Items 41.44 and again in col. TOTAL CONTRACT AMOUNT INCLUDING CHANGE/ ORDERS: 2,644,983.80 TOTAL AIAOUNT EARNED' ' 2,599,924.99 (45,058.81)