Loading...
HomeMy WebLinkAboutThree Lowest Bidders SummaryRamona Paving DMI Portillo Concrete Item No.pt Description{SiIndicates $ ecialt Item (S; Specialty Unit Qty. Unit Price Extension (Quantity x Unit Price) Unit Price Extension (Quantity x Unit Price) Unit Prig Extension (Quantity x Unit Price) ...: ; • 8AS€ IUD.-8TFI S Et' ROM•AVFN T PALM' AVENUE 1 Banding LS 1. $ 50,000.00 $ 50,000.00 $ 15,000.00 $ 15,000.00 $ 20,000.00 $ 20,000.00 2 Mobilization / Demobilization LS • 1 $ 20,000.00 $ 20,000.00 $ _ 5,000.00 $ - 5,000.00 $ 10,000.00 $ 10,000.00 3 Surveying 1.5 11 $ 8,700.00 $ 8,700.00 $ 8,000.00 $ 8,00000 $ 10,000.00 $ 10,000.00 4 Traffic Control L5 1 $ 25,000.00 $ 25,000.00 $ _ 15,000.00 $ _ 15,000.00 $ 15,000.00 $ 15,000.00 5 Water Quality Control, BMP's LS _ 1 $ 4,500.00 $ 4,500.00 $ 12,000.00 $ 12,000.00 $ 2,500.00 $ 2,500.00 6 Clearing and Grubbing LS 1 $ 30,000.00 $ 30,000.00 $ 60,000.0D $ 60,000.00 $ 65,000.00 $ 65,000.00 7 Unclassified Excavation L5 1 $ 25,000.00 $ 25,000.00 $ 54,000.00 $ 54,000.00 $ 25,000.00 $ 25,000.00 8 Removal, disposal and replacement of unsuitable material TON 200 $ 55.00 $ 13,000.60 $ 35.00 $ 7,000.00 $ 50.00 $ 10,000.00 9 CMU Retaining Wall per Structural Plans SF 5,560 I $ 25.00 $ 139,000.00 $ 54,90 $ 305,244.00 $ 56.00 $ 311,360.00 10 Metal Guard Rail Fencing at top of CMU Retaining Wall LF , 538' $ 27.00 $ 14,526.00 $ 31.00 $ 16,678.00 $ 25.00 $ 13,450.00 11 Adjust utility box to grade I EA 1- $ 250.00 $ 250.00 $ 1,300.00 $ 1,300.00 $ 500.1DD $ 500.00 12 6" Type 'G' curb & gutter per SDRSD No. G -2. I.F 235,; $ 38,00 $ 8,930.00 $ 24,00 $ 5,640.00 $ 30.00 $ 7,050.00 13 6" Type '13-1' Median curb per SDRSD No. G-t5. 1 IF 2,950' $ 27.00 $ 79,650.90 $ 10.00 $ 29,500.00 $ 13.00 $ 38,350.00 14 4" P.C.C. sidewalk per SDRSD No. G-7 & G-3. SF 6,760,1 $ 5.50 $ 37,180.CO $ 4.20 $ 28,392.00 $ 4.60 $ 31,096.00 15 P.C.C. curb ramps per SDRSD No. G-28 EA 4' $ 2,800.00 $ 11,200.00 $ 1,300.0D $ 5,200.00 $ 1,890.00 $ 7,200.00 16 P.C.C. curb ramps per 50R5D No. G 29 EA 2' $ 2,850.00 $ 5,700.00 $ 1,400.00 $ 2,800.00 $ 1,800.00 $ 3,600.00 17 Ram ps and Crossings, 5DRSD G-30 SF 200 $ 25.00 $ 5,000_00 $ 35.00 $ 7,000.0D $ 45.00 $ 9,000.00 18 Concrete cross gutter per SDRSD No. G-12 SF 320 $ 14.00 $ 4,480.00 $ 9.50 $ 3,040.00 $ 15.D0 $ 4,800.00 19 Asphalt concrete pavement --ON 200 $ 12D.0D $ 24,000.00 $ 158.00 $ 31,600.00 $ 125.00 $ 25,000.60 20 Concrete driveway per SDR5D No. G-14A SF 520 $ 7.00 $ 3,640.00 $ 6.30 $ 3,276.00 $ 15.00 $ 7,800.00 21 Trench Resurfacing per SDRSD No. G-33, Type B modified 5F 760 $ 12.00 $ 9,120.00 $ 11.00 $ 8,350.00 . $ 5.00 1 $ 3,800.00 22 Copper Water 5ervice and sleeve EA 3 $ 1,500.00 $ 4,500.00 , $ 1,800.00 $ 5,400.00 $ 1,450.00 $ 4,350.00 23 Install Type 11 REM Plant Mix Slurry Coat Fu1I Width of AC Prior to Final Striping GAL 7,850 $ 7.50 $ 58,875.00 $ 7.40 $ 58,090.00 $ 7.40 $ 58,090.00 24 install 2" AC Grind & Overlay SF 1,735 $ 4.25 $ 7,373.75 $ 6.40 $ 11,104.00 $ 5.25 , $ 9,108.75 25 Repair Catch Basin Curb to Cover Exposed Rebar (18') L5 1 $ 3,800.00 $ 3,800.09 $ 1,400.00 1 $ 1,400.00 $ 2,500.00 $ 2,500.00 26 Traffic Signal Modification at 8th St. & Palrn Avenue LS 1 $ 123,000.00 $ 123,000.60 , $ 116,000.00 $ 115,000.00 $ 127,000.00 $ 127,000.00 27 New Traffic Signal at 8th St. & M Avenue L5 1 $ 160,000.00 $ 160,000.60 $ 145,000.00 $ 1L 5,000.00 $ 166,000.00 $ 166,000.00 $ 21,000.00 28 Flashing Beacons at 8th St. & K Avenue I.5 1 $ 25,000.00 $ 25,000.00 $ 21,400.00 $ 21,400.00 $ 21,000.00 29 Signing and Striping LS 1 $ 29,500.00 $ 29,500.00 $ 30,000.00 $ 30,000.00 $ 30,400.00 $ 30,400.00 30 Unit Pavers (Permeable with Based 5F 5,404, $ 16.00 $ 86,464.00 $ 11.00 $ 59,444.00 $ 15.50 $ 83,762.00 6" Headers for Pavers LF 1,9621 $ 8.00 $ 15,696.00 $ 13.00 $ 25,506.00 $ 7.50 $ 14,715.00 31 32 Crushed Rock TON 42_1 $ 45.00 $ _ _ 1,890.00 $ 32.00 $ 1,344.00 $ 700.0D $ 8,400.00 33 Topsoil CY 33' $ 50.00 $ 1,650.00 $ 100.00 $ 3,300.00 $ 42.00 $ 1,386.00 34 Finish Grade Landscape Areas LS 1 $ 1,200.00 $ 1,200.00 $ 2,80000 $ 2,800.00 $ 3,450.00 $ 3,450.00 35 Soil Tests EA 2 ' $ 1,200.00 $ 2,400.00 $ 400.00 $ 800.00 $ 550.00 $ 1,100.00 36 Provide and Install 36 Inch Box Tree with Double Stalling FA 2 $ 1,200.00 $ 24,000.00 $ 1,000.00 $ 20,000.00 $ 1,275.00 $ 25,500.00 37 Planting - Medium Soil, container 5 Galion EA 39 $ 900.00 $ 35,100.00 $ 26.00 $ 1,014.00 $ 4L00 $ 1,599.00 38 Planting - Medium Soil, Container 1 Gallon EA 229 $ 35.0D $ 8,015.00 $ 9.00 $ 2,061.00 $ 16.00 $ 3,664.00 39 Irrigation System L5 11 $ 33,000.051 $ 33,000.0D $ 31,000.00 $ 31,000.00 $ 30,800.00 $ 30,800.00 Ramona Paving DMI Portillo Concrete Item No. r,120 � Description (5) indicates Specialty Item Unit Qty. Unit Price Extension (Quantity x Unit Price) Unit Price Extension (Quantity x Unit Price) Unit Price Extension {Quantity x Unit Price) Day Plant Establishment/Maintenance L5 I $ 3,000.00 $ 3,9D0A0 $ 5,000.00 $ 5,000.09 $ 4,450.00 $ 4,450.00 Bate Bid Total $ 1,143,339.75 $ 1,164,693.00J $ 1,217,780.75 AI7i7lftlTl B1O11EAl45:-8711 i Efl Qi�+l?�feX+�R� it i��£:?YIJGAV i1i1 ' . •. ~ .. A-1 Type 1 Pedestrian Barricade with R49(CA) sign Or bath EA 4 $ 900.00 $ 3,600.00 $ 165.00 $ 660.00 $ 935.00 $ 3,740.00 A-2 Remove all conflicting striping, thermoplastic, & pavem LS 1 $ 4,300.00 $ 4,300.00 $ 4,500.00 $ 4,500.00 $ 4,600.00 $ 4,600.00 A-3 Type II REAS Plant Mix slurry coat full width of AC prior GAL 5,600 $ 7.75 $ 43,400.00 $ 7.40 $ 41,440.00 $ 7.40 $ 41,440.00 A-4 Signing and striping L5 1 $ 4,500.00 $ 4,500.00 $ 4,600.00 $ 4,600.00 $ 4,709.00 $ 4,700.00 Additive Bid Total $ 55,800.00 $ 51,200.00 $ 54,480.00 Grand Total (Base Bid + Additive) $ 1,199,139.75 $ 1,215,893.00 $ 1,Z72,Z50.75