Loading...
HomeMy WebLinkAboutThree Lowest Bidders SummaryEC Constructors 1 M.A. Stevens Construction, Inc. Just Construction, Inc. BASE BID ttem No. Description (5) Indicates Specialty Item Unit Qty. Unit Price Extension (Quantity x Unit Price) Unit Price Extension (Quantity x Unit Price) Unit Price Extension (Quantity x Unit Price) 1 2 Mobilization Signing and Striping {including salvage and relocation of existing signs} LS LS 1 $ 10,935.00 $ 10,935.00 $ 4,875.00 $ 4,875.00 $ 1,996.00 ! $ 2,727.50 $ 2,727.50 1 $ 1,996.00 $ 9,630.00 $ 3,520.30 3 4 5 Ciearin: and Grubbing Water Pollution Control Architectural Improvements - Mechanical, Electrical, Plumbing, and Structural $ $ 7,335.00 1$ 7,335,00 LS 1 $ 1,618.00 [ $ 1,618.00 1 $ 409,022.0D $ 409,022.00 $ 1,500.00 $ 1,500.00 $ 384,336.25 $ 384,336.25 y$ 6,955.00 $ 4,494.00 $ 459,101.57 $ 9,630.00 $ 3,520,30 $ 6,955.00 $ 4,494.00 $ 459,101.57 6 7 8 9 10 11 Site light pole, fixture. and founnation Furnish and Install 1" Conduit Furnish and Install 2" Conduit Furnish and Install Conductors Furnish and install Pull Boxes t EA- LFT LFT LFT EA Refurbish Existing Light Pole and Lamp EA 2 $ 4,903.00 5 9,806.00 $ 554 $ 3,55 $ 1,952.50 I $ 550 {I{ $ 3.83 . $ 2,106.50 600 f 5 2.46 $ 1,476.00 4 $ 628.75 ` $ 2,515.00 2 ' 5 3SS.50 ' $ 711.00 3,537.50t$ 4.11 $ 4.38 $ 2.81 $ 2,875.00 $ 812.50 77,075.00 ! $ $ 2,260 50 2,409 00 1,685 00 $ 11,500.00 $ $ 1,625.00 3,210.00 $ 6,420.00 3.20 $ 1,760.00 5.90 $ 3,245.00 3.20 $ 1,920.00 267,50 $ 1,070.00 321.00 $ 642.00 12 13 Furnish and Install 25' Ornamental Steel Gate per project specifications [including gate operators, key pads, and all other appurtenances) EA 1 $ 25,407.00 $ 25,407.00 $ 30,237,50 $ 30,237.50 $ 23,835.50 $ 23,835.50 Furnish and Install 35' Ornamental Steel Gate per project specifications (including gate operators, key pads, and all other appurtenances) EA 1 $ 31,012.00 $ 31,012.00 $ 39,445.00 $ 39,445.00 $ 27,349.00 1$ 27,349.00 14 15 16 17 Furnish and Install Ornamental Steel Fence per project specifications Construct 6" PCC Construct 6e PCC with #4 bars, 24" D.C. LF 850 $ 103.44 $ 87,924 00 $ 118.25 $ 100,512.50 Provide and install 4" Class II Aggregate Base SF SF TON 800 3000 85 $ 2.10 $ 1,680.00 $ 15,70 $ 47,100.00 $ 37.18 $ 3,160 30 $ 7.50 $ 8.13 $ 58.75 $ 6,000.00 $ 24,390 00 $ 4,993.75 18 21 Unclassified Excavation Furnish and Install 4" Fire Service Lateral Per Sweetwater Authority Specifications LS EA 1 1 $ 820,00 $ 820.00 $ 11,591.00 $ 11,591.00 $ 5,000.00 $ 12,138.75 $ 5,000.00 $ 12,138.75 121.30 $ 103,105.00 13.90 $ 11,120.00 16.10 $ 48,300.00 117.70 $ 10,004.50 16,050.00 $ 16,050.00 17,120.00 $ 17,120.00 22 Furnish and Install 4" Backflow Preventer Per Sweetwater Authority Specifications EA 1 $ 4,374.00 $ 4,374.00 $ 8,347.50 $ 8,347.50 $ 10,700.00 1$ 10,700.00 23 Furnish and Install 6"x4" Reducer Per Sweetwater Authority Specifications EA 1 $ 437.00 $ 437.00 $ 773,75 $ 773,75 $ 1,070.00 1 $ 1,070.00 'Extension price adjusted due to rakulatina errors Base Bid ,Subtota I* Base Bid I $ 655,643.30 Subtotal* ADDITIVE BID $ 659,168.00 - Base Bid Subtotal $ 767,411,87 A-1 'Hoist System { L5 i 1 = $ 80,439.00 . $ 80,439.00 1 $ 108,068.40 i $ 108,068.40 $ 26,750.00 $ 26,750.00 A-4 Furnish and Install Tuffshed Model Industrial PRO Exterior Storage or approved equal (800 SF), Sheet C-03A & C-0313, Construction Note 7 EA 1 $ 22,472.00 $ 22,472.00 !$ 20,700.00 I $ 20,700.00 $ 8,346,00 $ 8,346,00 1 !Additive Bid Subtotal $ 102,911.00 IAdditive Bid !Additive Bid $ 128,768.40 'Subtotal $ 35,096.00 ADDITIVE ALTERNATIVE 9l0 `Furnish and Install Covered Work Area, I 1 'Regular Style, per Gaport or Approved Equal. A-2 Dimensions: W=28', L '26', LH-12'. Gauge ! EA 2 Size: 12GA of Galvanized Steel, Sheet C-03A, 111 Construction Note 6 A-3 Material Storage Containers, Sheet C-03B, Construction Note 6 LS 1 $ 6,317.50 12,635,00 $ 6,392.85 $ 12,785.70 $ 19,260.00 $ 38,520.00 $ 60,328.00 1$ 60,328.00 $ 48,990.00 $ 48,990.00 1 $ 20,582.50 $ 20,582.50 GRAND TOTAL BID (TOTAL BASE BED + TOTAL ADDITIVE BID + TOTAL ADDITIVE ALTERNATIVE BID) Additive Alternative Bid Subtotal Additive Additive $ 72,963.00 Alternative Bid Alternative Bid $ 59,102.50 Subtotal $ 61,775.70 Subtotal $ 831,517.30 $ 849,712.10 1 $ 861,610.37