HomeMy WebLinkAboutFinal Contract Balance+�* CALIFORNIANpA,T*�* Gl a,�� le`I 'r` 1 crwr n_c? �✓-�� FINAL CONTRACT BALANCE RETENTION REDUCTION ATE. December 3, 2013 PROJECT: National City Street Resurfacing and Concrete Improvement Project Specification No. 12-06 TO: Kock -Armstrong General Engineering Inc. P.O. Box 1190 Lakeside, CA 92040 ORIGINAL CONTRACT AMOUNT: S 657,679.24 START DATE: 11/19/2012 COMPLETION DATE: 8/28/2013 ORIGINAL CONTRACT LENGTH: 90 Working Days EXTENTION OF WORK DAYS: 6 Months, 10 Days TOTAL CONTRACT TIME: 9 Months, 10 Days DESCRIPTION: This Final Contract Balance reports final line item amounts and summarizes all changes to produce a final contract amount. Please see Attachment "A" to this Final Contract Balance. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: Change Order #1 provided for the reduction of line items #7 Remove and Replace 4" PCC Sidewalk, #14 Furnish and install 2" Conduit Sweep due to a clerical error on addendum #3. This Change Order does not change any line item prices. This Change Order decreased the total contract amount by $31,270.00. (This amount was already included as part of the Original Contract at time of award). Change Order #2 provided for the removal of the specification for perform thermoplastic from Line Item#11. This Change Order will replace the installation of four (4) thermoplastic checkered cross -walks with the installation of one (1) thermoplastic cross- walk under Line Item#12. This Change Order decreased the total contract amount by $41,660.00. (This amount was already included as part of the Original Contract at time of award). FINAL CONTRACT BALANCE Resurfacing and Concrete Improvement Project Specification No. 12-06 Change Order #3 provided for the removal and replacement of 272 SF of concrete driveway at 30th Street, west of Harding Avenue, This Change Order increased the total contract amount by $3,944.00. Change Order #4 provided for the required repair of the existing D-25 on the North Side of Plaza Boulevard between D Avenue and Highland. This Change Order increases the total contract amount by $1298.54. Change Order #5 provided for the installation of striping, street markings, and stop signs at various locations throughout the city. This Change Order increased the total contract amount by $18,711.58. Change Order #6 provided for the removal of tree -roots and removal and replacement of 4" asphalt on G Avenue north of 24th Street. This Change Order increased the total contract amount by $3,824.08 Change Order #7 provided for the addition of No.4 rebar 24" from center for the G-17 ally aprons on C Avenue between 16th and 20th streets. These alleys require greater structural stability due to high usage from trash trucks and other larger vehicles. This Change Order increased the total contract amount by $1,127.14. Change Order #8 provided for the removal of line item #3, REAS Flex Seal, Plant Mix, and replace it with lump sum item for 1.25" header cuts and placement of 1.25" Warm Mix Overlay on Mile of Cars Way from National City Boulevard to 135 feet west of Wilson Avenue. This Change Order increased the total contract amount by $47,888.36. Change Order #9 provided for the removal and replacement of the "Do Not Enter" and "One Way" signs at B Avenue and 21st Street which are not on acceptable standards. This Change Order increased the total contract amount by $488.32. Change Order #10 provided for the change and update of the striping on 8th Street between Rachel Avenue and Olive Avenue in accordance with the overall striping and traffic plan for 8th Street. The asphalt for this section of 8tr Street is also showing signs of wear and cracking and should be sealed prior to the new striping to ensure maximum life for the existing asphalt street section. This Change Order increased the total contract amount by $37,743.25. Change Order #11 provided for the required repair of the asphalt at Alpha Street from Palm Avenue to Beta Street. As this work is the same scope and character as the original contract, the Engineering Department requested that this work be completed as a change order addition to the Contract. This Change Order increased the total contract amount by $49,959.80. Page 2 FINAL CONTRACT BALANCE Resurfacing and Concrete Improvement Project Specification No. 12-06 Change Order #12 provided for a reflection to the adjustments to the original contract base bid. This Change Order does not change the total contract amount of the project. Line Item #2, "Cold Milling", was increased 500 SF for an increase in the total contract amount by $1,750.00. Line Item #4, "6" Asphalt Concrete Dig -outs and Replacement", was decreased 31.82 Tons for a decrease in the total contract by $3,683.16. Line Item #7, "Remove and Replace 4" PCC Sidewalk", was decreased by 909.5 SF for a decrease in the total contract amount by $3,550.00. Line Item #8, "Remove and Replace 6"-8" Curb and Gutter", was decreased by 42.5 LF for a decrease in the total contract amount by $1,785.00. Line Item #10, "Remove and Replace Traffic Loops", was increased by 2 units each for an increase in the total contract amount by $640.00. Line Item #14, "Furnish and install 3" PVC Conduit", was decreased by 275 LF for a decrease in the total contract amount by $7,328.75. Line Item #15, "Furnish and install 2" Conduit Sweep", was decreased by 8 units for a decrease in the total contract amount by $5,120.00. Line Item #17, "Furnish and install Pull Rope", was decreased by 1,100 LF for a decrease in the total contract amount of $1,177.00. Line Item #19, "Furnish and install #5 Pull Box", was decreased by 2 units for a decrease in the total contract amount of $748.00. Line Item #21, "Remove and Replace 4" PCC Sidewalk", was increased by 1,059 SF for an increase in the total contract amount of $6,565.80. Line Item #22, "Install Root Barriers", was decreased by 660 LF for a decrease in the total contract amount of $7,821.00. Line Item #23, "Remove and Replace 6"-8" Curb and Gutter", was decreased by 1,723 LF for a decrease in the total contract amount of $63,751.00. Line Item #24, "Remove and Replace PCC Driveway was increased by 1,903 SF for an increase in the total contract amount of $27,593.50. Line Item #25, "Remove and Replace Cross -Gutter", was decreased by 1,238 SF for a decrease in the total contract amount of $20,179.00. Page 3 FINAL CONTRACT BALANCE Resurfacing and Concrete Improvement Project Specification No. 12-06 Line Item #26, "Remove and Replace Pedestrian Ramps", was increased by 12 units for an increase in the total contract amount of $31,440.00. Line Item #27, "Tree Removals with Stumping", was increased by 3 units for an increase in the total contract amount of $3,390.00. CONTRACT ADJUSTMENT: As a result of the above change orders, the contract price is adjusted as follows: 1. The final contract price is adjusted to $719,939.61. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Koch -Armstrong General Engineering, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 4 City of National City National City Street Resurfacing and Concrete improvement Project Specification No. 12-06 Final Billing Statement October 2, 2013 Thrs Barrio To Date No. Item e a UnitQuantity Unit Price Amo'mt Quantity Amount Quantity Amount Quantity Amount Cty. (Delta) Prim (Delta) HASE BID "A" - MILE OF CARS WAY 1 Mobilization/Demobilization LS 1 3,509.00 3,500.00 0.60 2,100.00 C40 1,40000 1.00 3,500,00 - - 2 Cold Milling SF 100 3,50 350,00 - - 600 OD 2,100 00 600.00 2,100.00 500.00 1,750.00 3 REAS Flex Seal, Plant Mix GAL 11,500 6.40 73,6130.00 11,500.00 73,600.00 - 11,500.00 73,600.00 - - 4 6" Asphalt Concrete Dig -outs and Replacement TON 1,600 115.75 185,200,00 1,568.18 181,516.84 - 1,568.16 181,516.84 (31.82) (3,683.16) 5 Remove Unsuitable Sub -Grade and Replace with CMB and Gee -Fabric TON 1,000 48.10 48,100.00 - - - - - (1,000.00) (48,100.0D) 8 Crack Filling and Weed Abatement 57 12,678 0,58 7,469.24 - - - - - (12,878.00) (7,469.24) 7 Remove and Replace 4' PCC Sidewalk SF 1,200 7.10 8,520.00 290.50 2,062,55 290.50 2,062.55 (909.50) (6,457.45) 6 Remove and Replsoe 6-8" Curb and Gutter Lt 160 42.00 6,720.00 117.50 4,935.00 - 117.50 4,935.00 342.50) (1,785.00) 9 Remove and Replace Cross -Gutter SF 90 22.00 1 980.00 - - _ - - - (90.00) (1,980.00) 10 Remove and Replace Traffic Loops E\ 52 320,00 16,640.00 - - 54 00 17,280 00 54.00 17,280.00 2.00 640.00 11 Remove and Replace Striping, Pavement Markings, and Markers Lil 1 26,380.00 26,330.00 1.00 26,380.00 - 1.00 26,380.0D - 12 Install Four (4) Therrnoplastic Checkered Cross -Walks (Intersection of Mile of Cars Way and National City Blvd) Lit 1 11 830.00 11,030.00 - - 1 00 11,630 06 1.00 11,830.00 13 Provide 30 x 30 Signs Ea 4 310.00 1,240.00 - - 4 00 1,240 CO 4.00 1,240,00 - - 14 Fumish and Instal! 3" PVC LIr 1,100 26.65 29,315.00 825,00 21,986.25 - 625.00 21,986.25 (275.00) (7,328.75) 15 Fumish and Instal' 2" Conduit Sweep E>, 12 640.00 7,680.00 4.00 2,560.00 - 4.00 2,560.00 (8.00) (5,120.00) i6 Relocate Existing Signal Interconnect Cable to New Conduit Run LS 1 4,263.00 4,2.53.00 1.00 4,263.00 - 1.00 4,263,00 _ 17 Fumish and Install Pull Rope LI' 2,000 1.D7 2,140.00 900.00 963.00 900.00 963.00 (1,100.00) (1,177.00) 18 Fumish and Instal[ #6 Pull Box with Extension EA 3 427.00 1,281 00 3.00 1,281,130 3.00 1,281.00 - - 19 Fumish and Install #5 Pull Box EA 5 374.00 1,570.00 7.00 2,618.00 - 7.00 2,618.00 2.00 748.00 RASE BID "B" - CDBG CONCRETE - - - - - 20 Mobilization/Demobilization L13 1 1,500.00 1,500.00 1.00 1,500.00 - 1.00 1,500.00 - - 21 Remove and Replace 4" PCCSidewalk S= 5,765 6.20 35,743.00 6,824.00 42,308.80 - 6,824.00 42,303.80 1,059.00 6,555.60 22 Install Root Banners 11= 900 11.85 10,665.00 40.00 474.00 200 00 2,37000 240.00 2,844.00 (660.00) (7,821.00) 23 Remove and Replace 6-8" Curb and Gutter Li= 2,210 37.00 81,770.00 48700 18,019.00 - 487.00 18,019.00 (1,723.00) (63,751.00) 24 Remove and Replace PCC Drnveway SF 120 14.50 1,740.00 2,023.00 29,333.50 - 2,02300 29,333,50 1,903.00 27,593.50 25 Remove and Replace Cross -Gutter S7 1,710 16.30 27,873.00 472.00 7,693.60 - 472.00 7,693.60 (1,238.00) (20,179.40) 26 Remove and Replace Pedestrian Ramps EA 20 2,620.00 52,400 00 32.00 83,840,00 - 32,00 83,840.00 22.00 _ 31,440,00 27 Tree Removals with Stumping EA 7 1,130.00 7,910.00 10.00 11,300.00 - 10.00 11,300.00 3.00 3,390.00 CHANGE ORDERS 1 Reduction of Line Items Nos. 7, 14, 15 Li 1 - - - - - - - - (1.00) 2 Reduction in Line Item Nos. 11, 12 L3 1 - - - - - - - (1.00) - 3 Access Driveway Li 1' 3,944.00 3,944.00 100 3,944.00 - 1.00_, 3,944.00 - - 4 D-25 @ Plaza L3 1 1,298,54 1,295.54 1.00 1,298.54 - 1.00 1,298.54 - - 5 Striping (6 locations) L3 1 18,711.58 18,711.58 1.00 18,711.55 - 1.00 18,711.58 - - 6 TSM - G Street L3 1 3,824.08 3,824.08 1.00 3,824.08 - 1.00 3,824.08 - - 7 Reberin Alleys LS 1 1,127.14 1,127.14 1.00 1,127.14 - 1.00 1,127.14 - - 8 Warm Mix Overlay on Mile of Cars L3 1 47,888.36 47,888.36 1.00 47,888.35 - 1.00 47.888.36 - - 9' T&M Signs LS 1 488.32 488.32 1.00 488.32 - 1.00 488.32 - - 10 Fumish and place REAS on 8th St LS 1 37,743.25 37,743.25 1.00 37,743.25 1.00 37,743,25 - - 11 Alpha Street Repair and REAS LS 1 49,959.80 49 S59.80 1 0D 49,959 80 1.00 49,959.80 - - "Changed from C08 TOTALS: 822 864,31 633,759.81 86.179 86 719,9313 61 (102,724.71)