Loading...
HomeMy WebLinkAboutFinal Contract Balance SheetDATE: PROJECT: TO: •.�y�e�+ CA.LrriFORN.�1�.�._ iNC6i pO$tATkp FINAL CONTRACT BALANCE April 3, 2013 Removal of Underground Storage Tank Systems and Storm Interceptor System at 2020 Hoover Avenue, Specification No. 12-08 West -Tech Contracting, Inc. 568 North Tulip Street Escondido, CA 92025 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION. $32,625.00 December 13, 2012 February 25, 2013 (includes downtime due to line item adjustments, correctional work, clean-up, inspection, and document delays) 30 working days 0 working days 30 working days This Final Contract Balance reports final line item amounts and summarizes all changes to produce a final contract amount. Please see Attachment "A" to this Final Contract Balance. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: There were no change orders for this project. Line Item No. 4, "Excavate, transport, weigh, dispose/recycle all contaminated soil (Type A) discovered during excavation and removal activities" was deleted as it was not required for completion of the project. This resulted in a decrease of $1,475.00 from the original contract amount. Line Item No. 5,"Excavate, transport, weigh, dispose/recycle all contaminated soil (Type B-Hot) discovered during excavation and removal activities", was deleted as it was not required for completion of the project. This resulted in a decrease of $1,475.00 from the original contract amount. FINAL CONTRACT BALANCE Removal of Underground Storage Tank Systems and Storm Interceptor System at 2020 Hoover Avenue Specification No. 12-08 CONTRACT ADJUSTMENT: As a result of the above line item deletions: 1. The final contract price is adjusted to $29,675.00. 2. As a result of the satisfactory completion of said project, a retention amount of $1,483.75.00 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. West -Tech Contracting, Inc. will not be entitled to damages or additional payment for delays as described in the 2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 2 CITY OF NATIONAL CITY Removal of Underground Storage Tank Systems and Storm Interceptor System at 2020 Hoover Avenue Specification No. 12-06 FINAL CONTRACT BALANCE ATTACHMENT "A" Original Contract To Date No. item Unit Quantity Unit Price iAmount Quantity Amount GENERAL ITEMS OF WORK 1 Mobilization/Demobilization LS 1 2,500.00 2,500.00 ' 1.00 2,500.00 • 2 Coordinate all activities with the County of San Diego Department of Environmental Heath and National City Fire Deparmeni LS 1 --- 3,300.00 3,300.00 1.00 3,300.00 3 Remove and disposeirecylce all of the surface improvments necessary for the removal of the UST and Interceptor (4"-8" of PCC) LS 1 6,500.00 6,500.00 1.00 6,500.00 4 Excavate, transport, weigh, disposelrecylce all contaminated soil (Type A) discovered during excavation and removal aativites TON 25 59.00 1,475.00 - - 5 Excavate, transport, weigh, disposehecylce ail contaminated soil (Type B-Hot) discovered oLlurinq excavation and removal activates TON 25 59.00 1,475.00 - - 12,000 GALLON UST REMOVAL AND C+ISPOSAL 6 Remove and dispose of residual liquids and solids in the UST system (tank, piping and pump assemblies) LS 1 4,200.00 4,200.00 1.00 4,200.00 7 Prepare UST for removal and disposal LS 1 9,200.00 9,200.00 1.00 9`200.00 8 Remove and dispose of UST system LS 1 1,200.00 1,200.00 1.00 1,200.00 g Remove and dispose of residual liquids and solids in the sotrm interceptor LS 1 400.00 400A0 1.00 400.00 10 Remove and dispose of the storm water Interceptor system LS 1 1,500.00 1,500.00 1.00 1,500.00 11 Place Mirafi 180N filter fabric on ail sides and backfill with 3/4" crushed aggregate after removal of storm interce for TON 35 25.00 875.00 35.00 875.00 TOTALS: 32,625.00 29,675.00