HomeMy WebLinkAboutFinal Contract Balance SheetDATE:
PROJECT:
TO:
•.�y�e�+ CA.LrriFORN.�1�.�._
iNC6i pO$tATkp
FINAL CONTRACT BALANCE
April 3, 2013
Removal of Underground Storage Tank Systems and Storm
Interceptor System at 2020 Hoover Avenue,
Specification No. 12-08
West -Tech Contracting, Inc.
568 North Tulip Street
Escondido, CA 92025
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION.
$32,625.00
December 13, 2012
February 25, 2013 (includes downtime due to line
item adjustments, correctional work, clean-up,
inspection, and document delays)
30 working days
0 working days
30 working days
This Final Contract Balance reports final line item amounts and summarizes all changes
to produce a final contract amount. Please see Attachment "A" to this Final Contract
Balance.
CHANGE ORDERS AND LINE ITEM ADJUSTMENTS:
There were no change orders for this project.
Line Item No. 4, "Excavate, transport, weigh, dispose/recycle all contaminated soil (Type
A) discovered during excavation and removal activities" was deleted as it was not
required for completion of the project. This resulted in a decrease of $1,475.00 from the
original contract amount.
Line Item No. 5,"Excavate, transport, weigh, dispose/recycle all contaminated soil (Type
B-Hot) discovered during excavation and removal activities", was deleted as it was not
required for completion of the project. This resulted in a decrease of $1,475.00 from the
original contract amount.
FINAL CONTRACT BALANCE
Removal of Underground Storage Tank Systems and Storm Interceptor System at 2020
Hoover Avenue
Specification No. 12-08
CONTRACT ADJUSTMENT:
As a result of the above line item deletions:
1. The final contract price is adjusted to $29,675.00.
2. As a result of the satisfactory completion of said project, a retention amount of
$1,483.75.00 is set for invoice processing and payment upon the receipt of
required signatures and City Council's ratification of this agreement and the
Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation
for furnishing and installing the materials, labor, tools and equipment, profit, overhead,
and all incidentals for performing the work described above. West -Tech Contracting,
Inc. will not be entitled to damages or additional payment for delays as described in the
2010 edition of the Standard Specifications for Public Works Construction, Section 6-6.3,
for performing the work as described above.
Page 2
CITY OF NATIONAL CITY
Removal of Underground Storage Tank Systems and Storm Interceptor System at 2020 Hoover Avenue
Specification No. 12-06
FINAL CONTRACT BALANCE
ATTACHMENT "A"
Original Contract
To Date
No.
item
Unit
Quantity
Unit Price
iAmount
Quantity
Amount
GENERAL ITEMS OF WORK
1
Mobilization/Demobilization
LS
1
2,500.00
2,500.00
' 1.00
2,500.00 •
2
Coordinate all activities with the County of San
Diego Department of Environmental Heath and
National City Fire Deparmeni
LS
1
---
3,300.00
3,300.00
1.00
3,300.00
3
Remove and disposeirecylce all of the surface
improvments necessary for the removal of the
UST and Interceptor (4"-8" of PCC)
LS
1
6,500.00
6,500.00
1.00
6,500.00
4
Excavate, transport, weigh, disposelrecylce all
contaminated soil (Type A) discovered during
excavation and removal aativites
TON
25
59.00
1,475.00
-
-
5
Excavate, transport, weigh, disposehecylce ail
contaminated soil (Type B-Hot) discovered
oLlurinq excavation and removal activates
TON
25
59.00
1,475.00
-
-
12,000 GALLON UST REMOVAL AND
C+ISPOSAL
6
Remove and dispose of residual liquids and
solids in the UST system (tank, piping and
pump assemblies)
LS
1
4,200.00
4,200.00
1.00
4,200.00
7
Prepare UST for removal and disposal
LS
1 9,200.00
9,200.00
1.00
9`200.00
8
Remove and dispose of UST system
LS
1
1,200.00
1,200.00
1.00
1,200.00
g
Remove and dispose of residual liquids and
solids in the sotrm interceptor
LS
1
400.00
400A0
1.00
400.00
10
Remove and dispose of the storm water
Interceptor system
LS
1
1,500.00
1,500.00
1.00
1,500.00
11
Place Mirafi 180N filter fabric on ail sides and
backfill with 3/4" crushed aggregate after
removal of storm interce for
TON
35
25.00
875.00
35.00
875.00
TOTALS:
32,625.00
29,675.00