HomeMy WebLinkAboutThree Lowest Bidders Summary2020 AND 2100 HOOVER AVENUE RE MEDIATION & SITE DEMOLITION
Specification No. 13-01
Clauss Construction
West -Tech
Whillock Contracting, Inc.
I
Item Description
No. ! (S) indicates Specialty item
i
Unit l Qty.
i
i Extension
Unit Price i (Quantity x
1 Unit Price)
! Extension
Unit Price (Quantity x
Unit Price)
Unit Price
Extension
(Quantity x
Unit Price)
BASE BID — Phase 1 (2100 Hoover Avenue and Parcel West of Paradise Creek)
1
Mobilization/Demobilization
LS 1
$ 15,000.00 $ 15,000,00
I $ 14,853.44
$ 14,853.44
$ 17,083.00
5 17,083.00
2
SWPPP
LS 1
$ 2,000.00 I $ 2,000.00
$ 31,275.86
$ 31,275.86
$ 28,809.00
$ 28,809.00
3(5)
Remove and dispose of all lead
paint and asbestos from the
Equipment Maintenance Building
(Building 200)
LS
1
$ 101,400.00
$101,400.00
$109,999.57
$109,999.57
$ 50,429.00
$ 50,429.00
4
Demolish, remove and dispose of
Building 200 and its foundation
LS
1
$ 37,575.00
$ 37,575,00
$ 32,671.11
$ 32,671.11
$ 61,972.00
$ 61,972.00
5
Demolish, remove and dispose of
hydraulic lift foundations at
Building 200
LS
1
$ 1,250.00
$ 1,250.00
$ 7,369.60
$ 7,369.60
$ 2,568.00
$ 2,568,00
6(S)
Excavate, stockpile, categorize,
remove and dispose of
contaminated soil at the previous
vehicle lift location and dispose of
at the Otay Landfill, California
(AOC-01)
TON
115
$ 140.00
$ 16,100.00
$ 199.17
$ 22,904.55
$ 112.00
$ 12,880,00
7(S)
Excavate, stockpile, categorize,
remove and dispose of
contaminated soli at the previous
vehicle lift location and dispose of
at the Copper Mountain Landfill,
Arizona (AOC-01)
TON
115
$ 161.00
$ 18,515.00
$ 254.21
$ 29,234.15
$ 127.00
$ 14,605.00
8(S)
Excavate, stockpile, categorize,
remove and dispose of
contaminated soil at the previous
vehicle lift location and dispose of
at the U.S. Ecology Landfill,
Nevada (AOC-01)
TON
115
$ 357.00
$ 41,055.00
$ 87.47
$ 10,059.05
$ 287.50
$ 33,062.50
9
Import, mix, puce ano compact
unclassified fill at the previous lift
location
CV
200
$ 40.63
$ 8,126.00
$ 20.20
$ 4,040.00
$ 32,00
$ 6,400,00
10
Excavation, mix, replace and
compact clean overburden at the
previous vehicle lift location
CV
300
$ 12.16
$ 3,648.00
$ 5.07
$ 1,521.00
$ 56.90
$ 17,070.00
11
Dewatering of hydraulic
lift/contaminated soil remediation
excavation
LS
1
$ 21,000.00
$ 21,000.00
$ -
$ -
$ 10,150.00
$ 10,150,00
112(S)
Excavate, stockpile, categorize,
remove and dicpnsP of
contaminated soil on the parcel
West of Paradise Creek to the
Otay Landfill, California (AOC C5)
CV
200
$ 160.00
$ 32,000.00
$ 84.09
$ 16,818.00
$ 141.00
$ 28,200.00
13(S)
Excavate, stockp[le, categorize,
remove and dispose of
contaminated soil on the parcel
West of Paradise Creek to the
Copper Mountain Landfill, Arizona
(A0C-05)
CV
200
$ 172.50
$ 34,500.00
$ 107.33
$ 21,466.00
$ 164.00
$ 32,800,00
14(S)
Excavate, stockpile, categorize,
remove and dispose of
contaminated soil on the parcel
West of Paradise Creek to the U.S.
Ecology Landfill, Nevada (AOC-05)
Cy
200
$ 530.00
$106,001/00
$ 131.21
$ 26,242.00
$ 373.00
$ 74,600.00
BASE BiD — Phase 2 (2020 Hoover Avenue)
i
15' ."ob iiz� tio. , e n bii zatior !, e
.:, . o
1
e ,
_3,000.00
,
$ ,000.00
$
e
, , -
c ,
$ 2,962.00
t
$ 2,962.00
16!SWPPP
LS
1
$ 10,000.00
$ 10,000.00
$ 16,297.55
$ 16,297.55
$ 15,558.00
$ 15,558.00
17(5)
'Remove and dispose of ail lead
paint and asbestos from all
buildings at 2020 Hoover Avenue.
LS
1
$ 31,000.00
$ 31,000.00
$ 156,094.89
$ 156,094.89
$ 14,393.00
$ 14,393.00
18
Clearing and Grubbing 2020
1
Hoover Avenue
LS
1
$ 102,100.00
$102,100.00
$109,485.06
$109,485.06
$ 75,760.00
$ 75,760.00
19
, Kough grade site for even and
!straight sheet drainage across site
at 2020 Hoover Avenue.
LS
1
$ 20,000.00
$ 20,000.00
$ 3,032.30
$ 3,032.30
$ 10,938.00
$ 10,938.00
BASF BID — Phase 3 (2100 Hoover Avenue)
$ -
20 Mobilization/Demobilization
LS
1
$ 13,000.00
$ 13,000.00
$ -
$ -
$ 3,604.00
$ 3,604.00
211SWPPP
1.5
1
$ 10,000.00
$ 10,000.00
$ 23,317.04
$ 23,317.04
$ 18,640.00
$ 18,640.00
(Clearing and Grubbing the
221remainder of 2100 Hoover Avenue
LS
1
$ 164,000.00
$164,000.00
$196,627.65
$196,627.65
$305,673.00
$ 305,673.00
Rough grade site for even and
straight sheet drainage across site
23 at 2100 Hoover Avenue.
LS
1,
$ 20,000.00
$ 20,000.00
$ 10,756.16
$ 10,756.16
$ 37,652.00
$ 37,652.00
BASE BiD —Ali Phases as Needed
24
Excavate, stockpile, categorize,
remove and dispose of
miscellaneous contaminated soil
as directed by the Engineer to
Otay Landfill, Chula Vista, CA
CY
50
$ 155.00
$ 7,750.00
$ 56.06
$ 2,803.00
$ 124.00
$ 6,200.00
25
Excavate, stockpile, categorize,
remove and dispose of
miscellaneous contaminated soil
as directed by the Engineer to
Copper Mountain landfill, Arizona
CY
50
$ 171.00
$ 8,550.00
$ 71.55
$ 3,577.50
$ 141.00
$ 7,050.00
26
Excavate, stockpile, categorize,
remove and dispose of
miscellaneous contaminated soil
as directed by the Engineer to US
Ecology Landfill, Nevada
CY
50
$ 370.00
$ 18,500.00
$ 87.47
$ 4,373.50
$ 335.00
$ 16,750.00
27
Install and maintain temporary
security fencing and gates
LF per
Month
1,600
$ 0.65
$ 1,040.00
$ 5.38
$ 8,608.00
$ 0.19
$ 304.00
28
Removal of temporary security
fencing and gates
LS
1
$ 1,500.00
$ 1,500.00
$ -
$ -
$ 1,705.00
$ 1,705.00
BASE BID TOTAL
$858,609.00
$863,426.98
$907,817.50