Loading...
HomeMy WebLinkAboutThree Lowest Bidders Summary2020 AND 2100 HOOVER AVENUE RE MEDIATION & SITE DEMOLITION Specification No. 13-01 Clauss Construction West -Tech Whillock Contracting, Inc. I Item Description No. ! (S) indicates Specialty item i Unit l Qty. i i Extension Unit Price i (Quantity x 1 Unit Price) ! Extension Unit Price (Quantity x Unit Price) Unit Price Extension (Quantity x Unit Price) BASE BID — Phase 1 (2100 Hoover Avenue and Parcel West of Paradise Creek) 1 Mobilization/Demobilization LS 1 $ 15,000.00 $ 15,000,00 I $ 14,853.44 $ 14,853.44 $ 17,083.00 5 17,083.00 2 SWPPP LS 1 $ 2,000.00 I $ 2,000.00 $ 31,275.86 $ 31,275.86 $ 28,809.00 $ 28,809.00 3(5) Remove and dispose of all lead paint and asbestos from the Equipment Maintenance Building (Building 200) LS 1 $ 101,400.00 $101,400.00 $109,999.57 $109,999.57 $ 50,429.00 $ 50,429.00 4 Demolish, remove and dispose of Building 200 and its foundation LS 1 $ 37,575.00 $ 37,575,00 $ 32,671.11 $ 32,671.11 $ 61,972.00 $ 61,972.00 5 Demolish, remove and dispose of hydraulic lift foundations at Building 200 LS 1 $ 1,250.00 $ 1,250.00 $ 7,369.60 $ 7,369.60 $ 2,568.00 $ 2,568,00 6(S) Excavate, stockpile, categorize, remove and dispose of contaminated soil at the previous vehicle lift location and dispose of at the Otay Landfill, California (AOC-01) TON 115 $ 140.00 $ 16,100.00 $ 199.17 $ 22,904.55 $ 112.00 $ 12,880,00 7(S) Excavate, stockpile, categorize, remove and dispose of contaminated soli at the previous vehicle lift location and dispose of at the Copper Mountain Landfill, Arizona (AOC-01) TON 115 $ 161.00 $ 18,515.00 $ 254.21 $ 29,234.15 $ 127.00 $ 14,605.00 8(S) Excavate, stockpile, categorize, remove and dispose of contaminated soil at the previous vehicle lift location and dispose of at the U.S. Ecology Landfill, Nevada (AOC-01) TON 115 $ 357.00 $ 41,055.00 $ 87.47 $ 10,059.05 $ 287.50 $ 33,062.50 9 Import, mix, puce ano compact unclassified fill at the previous lift location CV 200 $ 40.63 $ 8,126.00 $ 20.20 $ 4,040.00 $ 32,00 $ 6,400,00 10 Excavation, mix, replace and compact clean overburden at the previous vehicle lift location CV 300 $ 12.16 $ 3,648.00 $ 5.07 $ 1,521.00 $ 56.90 $ 17,070.00 11 Dewatering of hydraulic lift/contaminated soil remediation excavation LS 1 $ 21,000.00 $ 21,000.00 $ - $ - $ 10,150.00 $ 10,150,00 112(S) Excavate, stockpile, categorize, remove and dicpnsP of contaminated soil on the parcel West of Paradise Creek to the Otay Landfill, California (AOC C5) CV 200 $ 160.00 $ 32,000.00 $ 84.09 $ 16,818.00 $ 141.00 $ 28,200.00 13(S) Excavate, stockp[le, categorize, remove and dispose of contaminated soil on the parcel West of Paradise Creek to the Copper Mountain Landfill, Arizona (A0C-05) CV 200 $ 172.50 $ 34,500.00 $ 107.33 $ 21,466.00 $ 164.00 $ 32,800,00 14(S) Excavate, stockpile, categorize, remove and dispose of contaminated soil on the parcel West of Paradise Creek to the U.S. Ecology Landfill, Nevada (AOC-05) Cy 200 $ 530.00 $106,001/00 $ 131.21 $ 26,242.00 $ 373.00 $ 74,600.00 BASE BiD — Phase 2 (2020 Hoover Avenue) i 15' ."ob iiz� tio. , e n bii zatior !, e .:, . o 1 e , _3,000.00 , $ ,000.00 $ e , , - c , $ 2,962.00 t $ 2,962.00 16!SWPPP LS 1 $ 10,000.00 $ 10,000.00 $ 16,297.55 $ 16,297.55 $ 15,558.00 $ 15,558.00 17(5) 'Remove and dispose of ail lead paint and asbestos from all buildings at 2020 Hoover Avenue. LS 1 $ 31,000.00 $ 31,000.00 $ 156,094.89 $ 156,094.89 $ 14,393.00 $ 14,393.00 18 Clearing and Grubbing 2020 1 Hoover Avenue LS 1 $ 102,100.00 $102,100.00 $109,485.06 $109,485.06 $ 75,760.00 $ 75,760.00 19 , Kough grade site for even and !straight sheet drainage across site at 2020 Hoover Avenue. LS 1 $ 20,000.00 $ 20,000.00 $ 3,032.30 $ 3,032.30 $ 10,938.00 $ 10,938.00 BASF BID — Phase 3 (2100 Hoover Avenue) $ - 20 Mobilization/Demobilization LS 1 $ 13,000.00 $ 13,000.00 $ - $ - $ 3,604.00 $ 3,604.00 211SWPPP 1.5 1 $ 10,000.00 $ 10,000.00 $ 23,317.04 $ 23,317.04 $ 18,640.00 $ 18,640.00 (Clearing and Grubbing the 221remainder of 2100 Hoover Avenue LS 1 $ 164,000.00 $164,000.00 $196,627.65 $196,627.65 $305,673.00 $ 305,673.00 Rough grade site for even and straight sheet drainage across site 23 at 2100 Hoover Avenue. LS 1, $ 20,000.00 $ 20,000.00 $ 10,756.16 $ 10,756.16 $ 37,652.00 $ 37,652.00 BASE BiD —Ali Phases as Needed 24 Excavate, stockpile, categorize, remove and dispose of miscellaneous contaminated soil as directed by the Engineer to Otay Landfill, Chula Vista, CA CY 50 $ 155.00 $ 7,750.00 $ 56.06 $ 2,803.00 $ 124.00 $ 6,200.00 25 Excavate, stockpile, categorize, remove and dispose of miscellaneous contaminated soil as directed by the Engineer to Copper Mountain landfill, Arizona CY 50 $ 171.00 $ 8,550.00 $ 71.55 $ 3,577.50 $ 141.00 $ 7,050.00 26 Excavate, stockpile, categorize, remove and dispose of miscellaneous contaminated soil as directed by the Engineer to US Ecology Landfill, Nevada CY 50 $ 370.00 $ 18,500.00 $ 87.47 $ 4,373.50 $ 335.00 $ 16,750.00 27 Install and maintain temporary security fencing and gates LF per Month 1,600 $ 0.65 $ 1,040.00 $ 5.38 $ 8,608.00 $ 0.19 $ 304.00 28 Removal of temporary security fencing and gates LS 1 $ 1,500.00 $ 1,500.00 $ - $ - $ 1,705.00 $ 1,705.00 BASE BID TOTAL $858,609.00 $863,426.98 $907,817.50