HomeMy WebLinkAboutExplanationEXPLANATION The State of California Department of Transportation (Caltrans) is currently constructing additional freeway lanes along Interstate 805 within National City, which will require the relocation of an eight inch (8") sewer main which crosses under the freeway between Grove Street and Newell Street. This sewer main was originally installed in about 1958 and services approximately twenty homes. The main runs from Grove Street down an embankment on the easterly side of the freeway at approximately 66% slope, bends forty-five degrees at the edge of the existing pavement where the slope becomes 3%, and then runs westerly under the freeway to Newell Street. Caltrans plans call for construction of a gravity wall along the edge of the freeway at the foot of the embankment. The depth of the wall footing will require relocation of the sewer main to provide appropriate clearance from the footing. Caltrans is requesting that the City enter into a Utility Agreement in order to allow Caltrans to perform the work necessary to relocate the sewer main, consistent with the attached sewer relocation plans. Caltrans will reimburse the City, on a time and materials basis, for plan reviews and inspections. The existing facilities are lawfully maintained in their present location and qualify for relocation at the State's expense under the provisions of Section 703 of the Streets and Highways Code. The construction period for the widening project through National City is estimated for July 2014 through June 2015. The sewer relocation will occur within this time period and residents will be notified well in advance via door hangers. Once the sewer has been relocated, service will be impacted for a period of up to 8 hours in order to complete the transfer.