Loading...
HomeMy WebLinkAboutStatement of QualificationsPEQUESTJQR STATEMM TSOF QUALIFICATIONS ISOQD GUARANTEED ENERGY SAVINGS CONTRACT FOR MUNICIPAL FACILITY SUSTAINABLE IMPROVEMENT AND MANAGEMENT SERVICES JULY 24, 2014 The City of National City's Department of Engineering & Public Works seeks Statements of Qualifications (SOQs) from interested energy service firms for an energy services contract (ESCO) to make sustainability Improvements to City tacilities under a guaranteed energy savings contract. Expressions of Interest (EOIs) are due to the Office of the City Engineer no later than August 4th 2014 at 5pm. Responses are due to the Office of the City Engineer no later than August 18th at 5pm. NATIONAL CITY intends to select the most qualified responsible contractor per the evaluation criteria contained herein with whom it will enter into a Guaranteed Energy Savings Contract, The general services are described under Section III "Scope of Services." This RFn describes the minimum required scope of services, the firm selection process, and the minimum information that must be included in the SOQ. Failure to submit information in accordance with the request for SOQ requirements and procedures may be cause for disqualification. Objectives for the program are to: • Reduce carbon emissions from City operations • Reduce City energy usage • Reduce City water usage • Achieve operation and maintenance savings • Maximize opportunities for generating renewable energy • Utilize Integrated Demand Side Management (IDSM) techniques to reduce utility charges and increase self-reliance • Demonstrate the application of advanced energy and water saving technologies The SOQ package is available for free download on the City's website at htto://www.ci.national- citv.ca.ustindex.aspx?page=450 Ouestinns can he emailed to- Kuna Muthusamy, P.E. Assistant Director of Engineering/Public Works kmuthusamy@nationalcityca.gov Ili �.OHPC P REQUEST FOR STATEMENTS OF QUALIFICATIONS (SOQI GUARANTEED ENERGY SAVINGS CONTRACT FOR MUNICIPAL FACILITY SUSTAINABLE IMPROVEMENT AND MANAGEMENT SERVICES JULY24,2014 I. INTRODUCTION The City of National City's Department of Engineering & Public Works seeks Statements of Qualifications (SOQs) from interested energy service firms for an energy services contract (ESCO) to make sustainability improvements to City facilities under a guaranteed energy savings contract. Expressions of Interest (EOIs) are due to the Office of the City Engineer no later than August 4th 2014 at 5pm. Responses are due to the Office of the City Engineer no later than August 18th 2014 at 5pm. NATIONAL CITY intends to select the most qualified responsible contractor per the evaluation criteria contained herein with whom it will enter into a Guaranteed Energy Savings Contract. The general services are described under Section III "Scope of Services." Only submissions by qualified vendors, identified on the State of California DGS's 2012 pool of qualified ESCO contractors, established pursuant to Gov't Code 4217.10-18 of the Public Utilities will be considered. This RFC_). describes the minimum required scope of services, the firm selection process, and the minimum information that must be included in the SOQ. Failure to submit information in accordance with the request for SOQ requirements and procedures may be cause for disqualification. Objectives for the program are to: • Reduce carbon emissions from City operations • Reduce City energy usage Reduce City water usage • Achieve operation and maintenance savings • Maximize opportunities for generating renewable energy • Utilize Integrated Demand Side Management (IDSM) techniques to reduce utility charges and increase self-reliance • Demonstrate the application of advanced energy and water saving technologies Many of National City facilities are in, around or adjacent to Kimball Park. The City has allocated about $1.5 million for capital improvement needs to facilities at Kimball Park, much of which are electrical upgrades {see Attachment B for a full description of these improvements). The City intends for the selected firm to perform these capital improvements or to coordinate and cooperate during their performance so that installation costs can be reduced, service disruption can be minimized and/or more comprehensive energy and water improvements can be installed. National City intends to pay for improvements performed out of utility bill savings, operation and maintenance savings, rebates and incentives, and existing Capital Improvement Program (CIP) allocation. II. BACKGROUND AND DESCRIPTION In 2012, the City of National City approved a Climate Action Plan (CAP)1 aimed at bringing National City's carbon emissions to 15% below 2005 levels by 2020, with additional reductions by 2030. The table below shows baseline emissions levels by sector for National City government operations, as well as forecast emissions for 2020 and 2030 under a business -as -usual (BAU) scenario. Buildings and Facilities are responsible for the largest share of emissions from government operations. 1 http://www.nationalcityca.gov/index.aspx?page=,48 2 TAM 2-S GavEn VENT OPERATIONS ImmoNs LP VEM'TCRY AND RECAST DT RECTOR 2 a 22020 205.A3 SOCIEMS ram) c ) (MTc j dial gs anti Filar� aatsw 1,519 1,051 2,14 Ben?inyee Coneenutir i 1,722 13,95 V ... er nett 1 ` 3 1,076 1+.,269 Bola Waste 5/5 695 3 Psi& Lighting 429 507 "ates aria Sewage Tam 5,077 5,774 CASS mil, i c, 21C4I, MALE, Za The CAP set emissions reduction targets for government operations by sector as shown in the table below. National City endeavors to reduce annual emissions from its buildings and facilities and public lighting by a total of 1187 MTCO2e by 2020 and 1514 MTCO2e by 2030. 402 4-2 GOVERMENT OPERATIONS GIRG EMISSION REDUCTi Seam- 'Z.uggiilas7s 2=4 Fazjities Total Reduction is Total Reduction is 2020 (hIllTCO:se) 2035 SO*$ spye Coenze,cre 39 PR Eyeti 330 735 Se&I Waste a Fishhe Lighting Vag azzIgewzge 2, T Reelection 1,53 '021 RAU L:so..s 5,774 6,186 1,c Rc tt' pas 41,211 4_,665 % Below 2006 Baseline 17% gaegce: -&,ZD+. The City also completed an Energy Roadmap (Attachment C) in December 2012 which was 3 created out of support from SANDAG and SDG&E. As part of that effort, energy assessments were performed for a number of City buildings (those assessments can be made available upon request). Interested firms are encouraged to visit the City's website for additional information on projects and services: www.nationalcityca.gov. III. SCOPE OF SERVICES National City seeks a qualified energy services firm to: 1. Audit City facilities 2. Develop an aggressive scope of sustainable improvements 3. Identify and secure all appropriate rebates, incentives, grants and subsidized financing 4. Compare, identify and secure project financing sources 5. Oversee installation of improvements 6. Monitor and maintain improvements 7. Guarantee that savings resulting from improvements exceed annual lease and debt service payments We expect this project will require no new funds from the City to be budgeted or expended. Any capital outlay or other expenses associated with supplier development and implementation of recommendations and services should be paid for from the savings garnered from each of the endeavors and shall be in full compliance with all applicable State Statutes. The City seeks aggressive, innovative, deep and wide improvements. The project may include measures for any and all City facilities including buildings, parks, lighting, infrastructure and other assets. A list of City buildings and parks appears in Attachment A. Further data on City facilities, including 24 month historical utility bills, equipment information and building plans is available upon request from the Engineering and Public Works Department. National City reserves the right to eliminate some of the facilities from the evaluation at a later date. For the purposes of developing this SOQ, respondents will have access to City facilities on July 30th and 31st 2014 between the hours of 8am and 5pm. Respondents are required to write to kmuthusamy@nationalcityca.Rov to confirm the appointment for access, no later than July 29th 2014 at 5pm. Improvements may include: • Replace inefficient equipment, • Replace old equipment reaching end of life cycle, • Improve workplace comfort, • Create energy (gas, electric, oil) savings, maintenance savings, and water savings, • Provide new capital equipment with no up -front cost, 4 • Significant efficiency improvement of National City facilities, • Reduced maintenance efforts, • Increased reliability, • Renewable generation (i.e. solar PV) and other sustainable technology where appropriate. The City intends for the selected firm to go beyond traditional energy and water savings measures, and to employ a wide range of technologies and techniques. Without limiting application of other technologies, the city is interested in the following: • Smart -grid and micro -grid type integration of energy efficiency, energy storage, renewables, and building automation • Renewable energy and/or storage that can be used as backup power Peak Toad shaving and demand management • Rainwater capture Grey water use Storm water capture for onsite use Highly aesthetic solar powered street and park lighting in high profile locations Irrigation retrofits and landscape redesigns • Golf course water consumption minimization • Public education and awareness about sustainability improvements NATIONAL CITY may cancel this Request for Statements of Qualifications, or may reject in whole or in part any and all proposals when NATIONAL CITY determines that cancellation or rejection serves the best interests of the public. Guaranteed Energy Savings Management Services Guaranteed Energy Savings Management Services (GESMS) are defined as a program of services including energy audits, energy conservation measures, energy conservation projects, or a combination thereof, and building maintenance and financing services, primarily intended to reduce the wst of energy and water in operating one or more buildings, which may be paid for in whole or in part, by cost savings attributable to a reduction in energy and water consumption which result from the services. Savings Guarantee The Guaranteed Energy Savings Contract is defined as a contract for the evaluation, recommendation or implementation of one or more energy management services in which payments are based, in whole or in part, on any energy savings attributable to the Contract. it shall include a written guarantee of the ESCO that either the amount of the energy savings guaranteed will be achieved or the qualified provider shall reimburse the public agency for the shortfall amount. Methods for measurement and verification of guaranteed savings shall conform to the most recent standards established by the Federal Energy Management Program of the U.S. Department of Energy. The value of guaranteed savings must cover all of the annual payments at the discretion of National City. The Guaranteed Energy Savings Contract term for providing a guarantee, measurement and verification, maintenance, service and installment or lease payments shall not exceed 20 years. 5 + Savings must be guaranteed by the provider to meet or exceed annual lease and debt service payments. • Guaranteed savings period, along with full measurement, verification and validation must cover the full term of the financing. • Financing may be for as long as 20 years, but in no case longer than the weighted average life of the improvements. The selected ESCO will be required to assume the total responsibility for the design and implementation of the project. The ESCO will be considered the prime contractor and the sole point of contact with regard to all contractual matters for design, supervision, installation, service, maintenance, training and savings guarantee. Timeline The timeline below indicates key date for this solicitation and an estimated timetable for implementation. Step Dates Issue Solicitation 7/24/14 Site Inspection Window 7/30/14-7/31/14 Expressions of Interest Due 8/04/14 Questions Due 8/11/14 Responses Due 8/18/14 Evaluation, Selection, ESCO Negotiation 8/19/14 - 9/18/14 City Council Consideration of ESCO Oct 2014 Scope Development, Contracting and Financing Oct 2014 - March 2015 Installation April 2015 - October 2015 IV. GENERAL INSTRUCTIONS A. Firms shall adhere to the requirements detailed in subsequent sections of this RFQ. B. Unless no other manner of description suffices, and NATIONAL CITY so determines in writing, all requirements within the Guaranteed Services Contract shall be written in a manner which describes the requirements to be met without having the effect of exclusively requiring a proprietary supply or service, or a procurement from a sole source. NATIONAL CITY will require that any software, pass codes and other information or documents required for the operation, maintenance or upgrades of energy management systems and energy conservation measures or projects will be provided to NATIONAL CITY at the time of installation at no extra charge. 6 V. STATEMENT REQUIREMENTS A. General 1. The SOQ shall be concise, well organized and demonstrate a clear understanding of the City's needs. The statement shall be limited to 50 one- sided pages (8 1/2 inches x 11 inches, or folded to fit these dimensions), inclusive of resumes, graphics, forms, pictures, photographs, dividers, front and back covers, cover letter. etc. Type size and margins for text pages should be in keeping with accepted standard formats for desktop publishing and processing and should result in no more than five hundred (500) words per page. 2. The Firm will be evaluated based upon the information submitted in accordance with the requirements of this request for SOQ. Statement of Qualifications must be submitted in the format outlined in this section. Each SOQ will be reviewed to determine if it is complete prior to evaluation. NATIONAL CITY reserves the right to eliminate from further consideration any response that does not follow the format or is deemed non -responsive; however, NATIONAL CITY reserves the right to waive any minor irregularities or informalities. B. Contents Elements of SDQs submitted in response to this request for SOQ shall be in the following order and shall include: 1. Cover Letter Include a 1-2 page cover letter that includes a brief background on the firm, including any unique attributes and distinguishing characteristics of the firm, which would be of value to the City. The cover letter should also express why the firm is interested in this particular request for SOQ. 2. Executive Summary Include a 1-2 page overview of the entire SOQ describing its most import's elements. 3. Contact Information a. Legal name and address of company b. Legal form of company (partnership, corporation, joint venture, etc.). if joint venture, identify the members of the joint venture and provide 7 all information required within this section for each member. c. Address(es) of office(s) working on the project. d. Name, title, address, telephone number and email address of the person to contact concerning the proposal. 4. Team Organization and Key Personnel a. The SOQ must include a discussion of the firm's staffing plan and level of personnel to be involved, their qualifications, experience, resumes, roles, and the name of the licensed professional(s) who will be in charge of project implementation and coordinating with the City and any other affected agencies. Provide assurance that an adequate number of qualified staff will be available to provide the services proposed. Provide evidence of key personnel qualifications. b. The SOQ must include an organizational chart illustrating key staff and their positions. If submitting as a team, the organizational chart shall also include team firms, their key staff and positions, roles and responsibilities. 5. Past Project Examples Provide detailed information on three (3) Performance Contracting projects (2 pages each) your firm has completed that can be used for references. Expand on the information provided in the previous section to give details on individual projects. Include the following information on each project as a minimum: a. Project Identification: 1. Owner name, 2. City/state, 3. Facility type. b. Contact Information: Names and contact information of owner(s) representatives who can serve as references. c. Project Type: Performance Guaranteed Contract. d. Project Size: Number of buildings and total project square footage. e. Project Dollar Amount: Total contract amount and the total project capital expenditure amount. f. Source of funding: A description of the source of funding used for the project and the company's role (if any) in securing that funding. g. Project Dates: Actual dates of audit start and acceptance; actual construction starting and ending dates. h. Contract terms: A description of the type of financing arrangement and contract term. 8 i. Project Personnel: A list of the names of individuals involved in the project, their role(s) and if these personnel will be assigned to the project. j. Project Schedule: Indicate if project was completed on schedule and an explanation if not. k. List of Improvements: The types of retrofits and operational improvements implemented related to energy, water and other cost savings/improvements. I. Project Performance: The amounts of projected annual savings, guaranteed annual savings, and actual annual savings for each project. 6. Technical Approach a. Describe how your firm will go about identifying and designing an extensive and innovative array of measures that meet the objectives of this RFQ and making them work economically, maximizing energy, water, emissions and costs saved. b. Provide estimates for the total project size in dollars, the annual saving anticipated from water, electricity, gas, and other sources. c. Provide estimate for the amount of grants, rebates, incentives and other funding to offset project costs. d. Provide list of measures your firm anticipates utilizing. e. Provide estimates for size and location of renewable energy systems your firm anticipates installing. f. Explain your firm's basis for b through e. 7. Project Approach Provide your firm's approach to the various technical steps in project development, and explain how your approach will provide best value to National City. Response should include a description of the technical approach to each phase of the GEMS including the IGA, the Design, Implementation, Commissioning, and M&V phases. Provide resumes of your project team. S. MethodoloFy of Determining and Guaranteeing Energy Savings Describe your methodology of determining energy savings and explain how your approach will minimize risk for NATIONAL CITY. Describe also your approach to verifying energy savings. State type of M&V options most frequently utilized on performance contracts. 9. Performance Capabilities Describe the general reputation and performance capabilities of the firm and explain how these characteristics translate to optimizing results for NATIONAL CITY. Please include the years in business under current name, annual revenues (most recent year) and one copy of the company's most recent audited financial report. 9 10. Time Specified in the Qualifications for the Performance of the Contract NATIONAL CITY anticipates that the audit of the identified NATIONAL CITY facilities will be complete within four months after the date of issuance of the letter of intent. 11. Financing Approach Respondents shall include in their responses information regarding financing provided by the ESCO directly, or through a third party, and their approach to supporting National City to compare and secure the best financing option (National City reserves the right to secure financing from whichever source(s) it determines is in its best interest). Respondent shall demonstrate their expertise in, and plan for, leveraging other sources of funding such funding sources may include, but are not limited to: utility rebates; demand response payments; grants; sale of renewable energy, carbon or air quality emissions credits; water savings grants; or sale of efficiency benefits on the ISO Capacity Market, and other utility, state, and federal benefits, incentives, rebate, grants, etc. All benefits that stem from implementation of this project that are deemed to have a monetary or societal value shall be the sole property of the City of National City. 12. Methods Proposed to Accomplish the Work a. Discuss the firm's capabilities for developing innovative or advanced techniques for project delivery. b. Outline the firm's managerial approach to ensuring a high quality of service. c. Discuss methods proposed to ensure projects will be delivered on -schedule and within budget, including QA/QC processes, project tracking and progress reports. 13. Financial Management and Accounting System The written SOQ must include a discussion of the firm's financial management and accounting system to ensure compliance with Parts 16.301-3, 18, and 31 of Title 48 of the CFR. 14. Competitive Procurement, Open Book Pricing and Overhead a. Describe your firms proposed process for obtaining competitive subcontractor bids, selecting (with City approval) subcontractors, assuring competitive pricing. 10 The term "Disadvantaged Business Enterprise" or "DBE" means a for -profit small business concern that is at least 51% owned by one or more individuals who are both socially and economically disadvantaged as defined in Title 49, Part 26 of the Code of Federal Regulations (CFR). Describe how you plan to attract DBE subcontractors. b. Affirm your firm's commitment to using open book pricing, and briefly outline your experience with it. c. Specify what overhead rate your firm will charge. 15. Exceptions to this Request for Statement of Qualifications The Firm shall certify that it takes no exceptions to this request for SOQ and the requirements stated within. 16. Addenda to this Request for Statement of Qualifications The Firm shall confirm in its statement the receipt of all addenda issued for this request for SOQ. The Firm is not required to include copies of the actual addenda in its submittal. VI. SUBMITTAL PROCESS A. Five signed hardcopies of the SOQ and one electronic copy on cd shall be submitted in one sealed packaged to the Office of the City Engineer no later than 5:00 PM on Monday, August 18th 2014. Address to: Kuna Muthusamy, P.E. Assistant Director of Engineering/Public Works City of National City Department of Engineering & Public Works 1243 National City Boulevard National City, CA 91950 B. SOQs are to be submitted in sealed packages with the following information clearly marked on the outside of each package: 1. Name of Firm 2. SOQ Title 3. Package Number (e.g., 1 of , 2 of , etc.) 11 C. SOQs shall be submitted according to the requirements set forth in this RFQ. Failure to adhere to these specifications may be cause for rejection. D. SOQs submitted by email or facsimile are not acceptable and will not be considered. E, 50Qs and/or modifications received subsequent to the hour and date specified above will not be considered. F. Late submittals, submittals to the wrong address, and submittals with inadequate copies are considered non -responsive and will be rejected. G. Once SOQs have been submitted, the composition of the key team members shall not be changed without the prior written consent of the City. H. All Requests for Information (RFIs) or questions regarding this RFQ shall be submitted by 5:00pm on August 11th 2014 via email to: km uth usa mv@ nation al cityca. gov. The City will only respond to written RFIs from firms who have received this request for SOQ. The City cannot respond to verbal questions submitted by telephone or in person. Firms interested in receiving a summary of the City's responses to RFIs may submit an email to the address above upon receipt of this request for SOQ. All relevant questions and responses shall be shared with those firms on the list. Respondents/firms are cautioned that any oral statements made that materially change any portion of the SOQ are not valid unless subsequently ratified by formal written addenda to the SOQ. No technical questions that may materially change any portion of the SOQ will be accepted following the question due date. 1. Expressions of Interest (EOIs) are due to the Office of the City Engineer no later than August 3rd at 5pm. E01s are strongly encouraged, however they are not mandatory. EOIs should contain the name of the firm and a statement confirming interest in this opportunity and the firm's intent to submit a SOQ. EOIs are to be submitted via email to: Kuna Muthusamy, P.E. Assistant Director of Engineering/Public Works kmuthusamvPnationalcityca.gov VII. FIRM NOMINATION AND SELECTION PROCESS 12 The City anticipates selecting one firm and signing a letter of intent with that firm to undertake an investment grade audit, develop a scope, and source financing, and produce guaranteed savings figures. A. A firm selection committee (Committee) of at !east five City staff, stakeholders and leaders will be established for this project. B. The Committee will evaluate each firm independently based on the strength of their written SOQ. Interviews may or may not be conducted with one or more firms. The Committee will rank the responsive firms as to their qualifications. Reference checks may be performed at any point in the process to assist with the evaluations. The City will enter into negotiations with the highest -ranked firm. Points of discussion will include contract terms and conditions, insurance requirements, scope of work, fees, and a Letter of Intent (LOI). If the selected firm and the Committee are unable to come to mutual terms with the agreement, the Committee will dismiss said firm and enter into discussions with the next highest -ranked firm. C. Upon acceptance of the terms of the LOI and satisfaction of insurance requirements, the City Engineer will recommend to the City Council approval of the agreement with the selected firm. Final authority to approve the LOI rests with the City Council. VIII. EVALUATION CRITERIA Only SOQs that meet the specified requirements will be deemed responsive and will be evaluated. National City may choose to waive specific requirements if it is in the best of interest of the City to do so. SOQs deemed "responsive" will be evaluated and score based on the point allocations below. Criteria Point Value Team qualifications and staffing plan 15 Firm experience, project examples and references 25 _ Technical and project approach 15 Financing Approach 10 Anticipated energy measures (creativity, breadth and soundness for basis for development) 5 Anticipated water measures (creativity, breadth and soundness for basis for development) 5 Anticipated renewable energy generation opportunities (creativity, breadth and soundness for 5 13 basis for development) Anticipated other measures such as smart -grid (creativity, breadth and soundness for basis for development) 5 Approach to maximizing rebates, incentives, grants, etc. 5 Approach to competitive procurement 5 Competitiveness of overhead rate 5 RFQ Total Possible Grade 100 Points IX. SPECIAL CONDITIONS A. Reservation of Rights 1. The City reserves the right to waive any irregularities or informalities in the RFQ or selection process. 2. The City reserves the right to change or cancel, for any or no reason, in part or in its entirety, this RFQ including but not limited to: submittal requirements, submittal date, and selection schedule. 3. The City reserves the right to request additional information and/or clarification from any or all respondents to this RFQ. 4. The City reserves the right to reject all submittals for any reason without indicating reasons for said rejection. 5. The City does not accept any financial responsibility for any costs incurred by respondents. 6. Issuance of this request for SOQ does not commit the City to award a contract, to pay any costs incurred in the preparation of a response to this request, or to procure a contract for services. 7. Selection is dependent upon the negotiation of a mutually acceptable contract with the successful respondent(s). B. Nonconforming Terms and Conditions Any statement that includes terms and conditions that do not conform to the terms and conditions of this request for SOQ is subject to rejection as non- responsive. The City of National City reserves the right to permit the respondent to withdraw non -conforming terms and conditions from its statement prior to action by the City Council of the City of National City to award a contract. 14 C. Changes to Scope of Services The City may materially change the scope of services by way of written addenda to this request for SOQ signed by the City Engineer. Such changes may include additions, deletions, or other revisions within the general scope of SOQ requirements. The City may waive the written requirement for a variation in the scope of services if, in the opinion of the City, such variation does not materially change the item or its performance within parameters acceptable to the City. D. Conflict of Interest The City has established a policy concerning potential conflict of interest in project management, design and construction. This policy applies to all proposers and their proposed firms/sub-firms. E. Public Information All statements submitted in response to this request for SOQ become the property of the City and thus become public records and, as such, may be subject to public review. Documents may be made available for public review and copying upon request, after completion of the firm selection process. Firms who wish to release information regarding the firm selection process, contract award or data provided by the City at any public hearing must receive prior written approval from the City before disclosing such information to the public. F Applicable Laws, Codes, Fees and Regulations The contracts awarded shall be governed in all respect by the laws of the State of California, and any litigation related to the contract or this request for 50Q shall be brought in the State of California, with a venue of the San Dieeo Superior Courts. The firms) awarded the contracts shall comply with allapplicable Federal, State, and local laws and regulations. The ESCO shall be responsible for payment of any required permits, licenses, taxes or fees associated with the execution of the performance contract. The ESCD shall be responsible for compliance with all applicable codes and laws. All work performed, related and specified, shall be in accordance with the most current CA Building Codes & Title 24 etc. G. Insurance and Bond Requirements 15 Before entering into a Guaranteed Energy Savings Contract, NATIONAL CITY shall require the ESCO to file with it a payment or a performance bond relating to the installation of energy savings measures, in an amount equal to 100 percent of the estimated contract value from a surety company licensed to do business in California and whose name appears on United States Treasury Department Circular 570. The successful ESCO shall procure and maintain in effect during the life of the agreement commercial general liability insurance in amount not less than $5,000,000 for each occurrence, comprehensive automotive liability insurance in amount not less than $5,000,000, and workers compensation insurance as required by California law. Evidence of required insurance shall be submitted within fifteen (15) calendar days of notice of selection and prior to the commencement of any work on the project. Failure to provide the insurance certificates within this time frame shall be cause for the statement to be rejected as non -responsive. Committee are unable to come to mutual terms with the agreement, the Committee will dismiss said firm and enter into discussions with the next highest -ranked firm. The entity/organization selected shall maintain insurance in full force and effect during the entire period of performance under the contract(s). Failure to do so shall be cause for termination of the contract(s). All policies must have a thirty (30) day non -cancellation clause giving the City of National City thirty (30) days prior written notice in the event a policy is cancelled. At the end of each contract year, the City of National City reserves the right to review insurance requirements and to require more or less coverage depending on the assessment of risk, the entity/organization's past experience, and the availability and affordability of increased liability insurance coverage. Any aggregate insurance limits must apply solely to this contract. If required insurance coverage is provided on a "claims made" rather than "occurrence" form, then the entity/organization shall maintain such insurance coverage for three years after the expiration of the term (and any extensions) of the contract. H. Independent Contractor Status The respondent agrees, if selected, that the respondent shall perform the services as independent contractor(s) and not employee(s) of the City of National City. The City shall not be considered the employer of the respondent. The respondent understands, if selected, the respondent shall have the sole responsibility for deciding the manner and means of providing the services, except as outlined in the final contract and its attachments or exhibits. I. Indemnification 16 The respondent agrees, !f selected, to indemnify and hold harmless the City of National City and all their respective officers and employees from any and all liability, claims, costs, including reasonable attorney's fees, demands, damages, expenses, and causes of action as outlined in the contract. J. Examination of Solicitation The respondent understands that the information provided herein is intended solely to assist the respondent in submittal preparation. To the best of the City's knowledge, the information provided is accurate. However, the City does not warrant such accuracy, and any errors or omissions subsequentiy determined will not be construed as a basis for invalidating this solicitation. Further, by submitting a response to this solicitation, the respondent represents that he or she has thoroughly examined and become familiar with work required in the solicitation and is capable of performing quality work and to achieve the objectives of the City of National City. Thank you for your interest in working with the City of National City. Sincerely, Kuna Muthusamy Assistant Director of Engineering/Public Works 17 UT San tiego Ad Order Numbe 0010856A:19 Sales Rep Manuel Order Taker Manuel Order Source Customer CITY OF NA 71ONAL CITY Customer Account 1055817 Customer Address 1243 NATIONAL CITY BLVD NATIONAL CITY CA 91950 USA C,aetomer Pure (619) 336-4228 Order Confirmation Pavor Customer DBA: OFFICE OF THE CITY CLERK CITY Of NATIONAL CITY avor ACCOU. 1055817 Pavor Address 1243 NATIONAL CITY BLVD NATIONAL C.TY CA 91950 USA Pavor Phone (619) 336-4228 PO Number Ordereda Esther Customer Fax Customer Rdail eclemente fgnatIonaIcftyca.gov Tear Sheets 0 Proofs 0 Net Amount $414.00 Affidavits Blind Box 0 Total Amount Payment Method $410.00 Invoice Payment Amount Amount Due $0.00 410.00 Ad Number Ad Type Pick Up Production Method 0010856339.-01 CLS Legal Ad Booker Ad Size 0.95x1C.42 Columnsllnches Color 1x10.41 WYSIWYG Content nml>usrFCR STAT814IINI$ OF OBAILIMATtotas l$ilCR IRO SAGS CONTRACT FOR M1tf#QPA14 FACILITY ourrAmou IMPRCVR NTANO ItIONACOOIT IIIom The City. of Nation- al Ci ss Deportment cif Engineerin bile Worksseeks Sinterrresrts of QualQuali- fications iS00s) tram interested en- 'w senesce firms fur m gy ser - 1 contract lei make sus nobilitytu irn- t�atIc4�raoy urrcler as savings tefn4racf. presslwas of In - of 7terestty (OCRs) are dui ranr�thite A oust +1111 ti#94 at 3pm. Re- sponses sponses ore due to the Office el the City &nglasor no later than August 18th at J' pni- NATIONAI CITY intends to select the Most qualified re - Seen rb a ciontrocier sea- the evil non 'he▪ rein With�t w ill elder Into o Guaranty Energy S avIngs contract, The enerot servi s ere 6Fom primea IlI'Sconemow TbW RFQ de- scribes the mini- ind ewe mum e• rvicces. we Irrnr n selection ism and the e mlr IttQ Fur* me rah b 4110StrtliCtilet Nlth #ho gWrethen#8 efid Oro- samures roar be Rs�ctl tor disVuolifi- ��;mawin the UT San Diego FMnt tafon5 ham CiIY onaratlant • It6dvlluoa City emir- 6dUt9 CRY valor (More • Achieve goer -alien and rnalntenance • • ax mlaeoproorlcr- nt es .r -pting I# Mumma reliance Ili appllcationof ad - and water wringranted meYt Thenolarples S451 „ackave Is available for free downlaad on ateswebsite at h p Otrww.cl..natlana -c Y.ca,u Index.aswx ?page=4 a &Iuexttans can he nplied mto: Kuna MutAssisttaant Directyor of Eng IneertnefPublic Warks, kmulaugorny Product Zone Placement Position Start Date End Date Insertions UTSanDiego Mobile Digital Legal Notices General Legals 07/24/2014 07/242014 1 UTSanDiego Online Digital Legal Notices General Legals 07/24/2014 07/24/2014 1 UTSanDiego Print Metro Legal Notices General Legals 07/24/2014 07/242014 1