HomeMy WebLinkAboutEngineers EstimateA**cV1Y61.e+r►V ►�io. 2.. -• cM.IFQRNna NA,TIONAL CITY 2020/2100 HOOVER AVENUE REMIEDIATION AND SITE DEMOLITION Specification No. 13-01 Engineer's Estimate September 25, 2014 Item No. DESCRIPTION] Projected Costs to Obtain Regulatory Closure Area of Concern (AOC)1 1 Remove and dispose of contaminated soils at the previous vehicle lift location and dispose of at Otay Landfill, California (AOC-01), Copper Mountain Landfill, Arizona (AOC-01), and U.S. Ecology Landfill, Nevada (AOC-01). $ 99,666.50 2 Import, mix, place and compact unclassified fill at the previous lift location $ 47,740.25 Excavation, mix, replace and compact dean overburden at the previous vehicle lift location $ 13,072,00 AOCs2,8 1 Rernove and dispose of miscellaneous contaminated soil as directed by the Engineer to Otay Landfill, Chula Vista, CA (AOC 2 & 8), Copper Mountain Landfill, Arizona (AOC 2 & 8), and US Ecology Landfill, Nevada (AOC 2 & 8) $ 187,500.00 AOC 5 1 Remove and dispose of contaminated soil on the parcel West of Paradise Creek to the Copper Mountain Landfill, Arizona (AOC-05) $ 418,600.00 2020 Hoover Avenue 1 Clearing and Grubbing 2020 Hoover Avenue including uknown concrete slab $ 122,100.00 AOCs6,7 1 Contingency $ 368,000.00 Projected Cost to Complete Site Remediation: Costs Covered Under the Original Contract plus 25% Contingency: Remaining Funds needed to Complete Site Remediation: $ 1,256,678.75 r} 411,604.00 $ 845,07435