HomeMy WebLinkAbout2003 CON Hanson SJH Construction - Street Change Order No. 1CONTRACT CHANGE ORDER NO. 1 ORIGINAL
DATE: July 30, 2003
PROJECT: National City Street Resurfacing Project FY 02-03, Specification
No. 02-2
TO:
David R Hummel, President
Hanson SJH Construction, Inc.
P. O. Box 639069
San Diego, CA 92163-9069
DESCRIPTION OF CHANGE:
This change order is written to add work item numbers 29 and 30 to the contract and to
increase the original bid quantities of line items 16, 18, 19, 23, & 24.
Original Contract
Adjusted Contract
No
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
1
Mobilization
LS
1
$21,323.10
$21,323.10
1
$21,323.10
$21,323.10
2
Clearing and Grubbing
LS
1
$1,000.00
$1,000.00
1
$1,000.00
$1,000.00
3
Unclassified Excavation
CY
800
$21.29
$17,032.00
800
$21.29
$17,032.00
4
R&R Street Section 1.5"
AC on 8" Base
SF
59,614
$2.54
$151,419.56
59,14
$2.54
$151,419.56
5
R&R Street Section 2"
SF
85,859
$2.55
$218,940.45
85,859
$2.55
$218,940.45
6
R&R Street Section 3"
SF
107,031
$2.52
$269,718.12
107,031
$2.52
$269,718.12
7
R&R AC Only
TON
S
1,185
$60.82
$72,071.70
1,185
$60.82
$72,071.70
8
Pavement Milling
LF
62,390
$0.73
$45,544.70
62,390
$0.73
$45,544.70
9
Pavement Fabric
SY
126,589
$0.75
$94,941.75
126,589
$0.75
$94,941.75
10
AC Overlay
TON
S
12,246
$45.00
$551,070.00
12,246
$45.00
$551,070.00
11
Manholes
EA
65
$200.00
$13,000.00
65
$200.00
$13,000.00
12
Monuments
EA
9
$150.00
$1,350.20
9
$150.00
$1,350.20
13
R&R Cross Gutter
SF
6,079
$15.86
$96,412.94
6,079
$15.86
$96,412.94
14
New Cross Gutter
SF
1,124
$16.59
$18,647.16
1,124
$16.59
$18,647.16
15
R&R Sidewalk
SF
6,990
$6.30
$44,037.00
6,990
$6.30
$44,037.00
16
New Sidewalk
SF
4,471
$5.25
$23,472.75
6,411
$5.25
$33,657.75
17
Remove Concrete
SF
1,350
$3.47
$4,684.50
1,350
$3.47
$4,684.50
18
R&R Curb and Gutter
LF
1,939
$27.72
$53,749.08
3,388
$27.72
$93,915.36
19
New Curb and Gutter
LF
1,023
$22.47
$22,986.81
1,723
$22.47
$38,715.81
20
Traffic Striping
LS
1
$23,000.00
$23,000.00
1
$23,000.00
$23,000.00
21
Ped Ramp
EA
15
$1,365.00
$20,475.00
15
$1,365.00
$20,475.00
22
Reinstall Traffic Loops
EA
154
$285.00
$43,890.00
154
$285.00
$43,890.00
23
R&R Alley Apron
SF
275
$10.00
$2,750.00
2,655
$10.00
$26,550.00
24
New Driveway
SF
1,880
$5.88
$11,054.40
4,528
$5.88
$26,624.64
Page 1
CONTRACT CHANGE ORDER NO. 1
Line Item No. 24 is increased at the City's request to provide compensation to the
Contractor for the construction of new driveways on 5th St. from Harbison Ave. to the
Cul-de-sac.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $110,482.98 from the current
contract price of $1,890,377.18 to a new contract price of $2,000,860.16.
2. The contract time is unchanged. The contract completion date was previously
established as Monday, September 15, 2003.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Hanson SJH Construction, Inc. will not be entitled to damages
or additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED FOR APPROVAL BY:
7; 3�
Michael J Long, Asoci. Civil E neer Dat
APPRi VED BY:
Mr. David R. Hummel, President
Hanson SJH Construction, Inc.
Date
Mr. M. L. Wilde, Assistant Secretary Date
Hanson SJH Construction, Inc.
Nick Inzunza, Mayor Date
Page 3
CONTRACT CHANGE ORDER NO. 1 ORIGINAL
DATE: July 30, 2003
PROJECT: National City Street Resurfacing Project FY 02-03, Specification
No. 02-2
TO:
David R Hummel, President
Hanson SJH Construction, Inc.
P. O. Box 639069
San Diego, CA 92163-9069
DESCRIPTION OF CHANGE:
This change order is written to add work item numbers 29 and 30 to the contract and to
increase the original bid quantities of line items 16, 18, 19, 23, & 24.
Original Contract
Adjusted Contract
No
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
1
Mobilization
LS
1
$21,323.10
$21,323.10
1
$21,323.10
$21,323.10
2
Clearing and Grubbing
LS
1
$1,000.00
$1,000.00
1
$1,000.00
$1,000.00
3
Unclassified Excavation
CY
800
$21.29
$17,032.00
800
$21.29
$17,032.00
4
R&R Street Section 1.5"
AC on 8" Base
SF
59,614
$2.54
$151,419.56
59,14
$2.54
$151,419.56
R&R Street Section 2"
AC on 10" Base
SF
85,859
$2.55
$218,940.45
85,859
$2.55
$218,940.45
6
R&R Street Section 3"
AC on 8" Base
SF
107,031
$2.52
$269,718.12
107,031
$2.52
$269,718.12
7
R&R AC Only
TON
S
1,185
$60.82
$72,071.70
1,185
$60.82
$72,071.70
8
Pavement Milling
LF
62,390
$0.73
$45,544.70
62,390
$0.73
$45,544.70
9
Pavement Fabric
SY
126,589
$0.75
$94,941.75
126,589
$0.75
$94,941.75
10
AC Overlay
TON
S
12,246
$45.00
$551,070.00
12,246
$45.00
$551,070.00
11
Manholes
EA
65
$200.00
$13,000.00
65
$200.00
$13,000.00
12
Monuments
EA
9
$150.00
$1,350.20
9
$150.00
$1,350.20
13
R&R Cross Gutter
SF
6,079
$15.86
$96,412.94
6,079
$15.86
$96,412.94
14
New Cross Gutter
SF
1,124
$16.59
$18,647.16
1,124
$16.59
$18,647.16
15
R&R Sidewalk
SF
6,990
$6.30
$44,037.00
6,990
$6.30
$44,037.00
16
New Sidewalk
SF
4,471
$5.25
$23,472.75
6,411
$5.25
$33,657.75
17
Remove Concrete
SF
1,350
$3.47
$4,684.50
1,350
$3.47
$4,684.50
18
R&R Curb and Gutter
LF
1,939
$27.72
$53,749.08
3,388
$27.72
$93,915.36
19
New Curb and Gutter
LF
1,023
$22.47
$22,986.81
1,723
$22.47
$38,715.81
20
Traffic Striping
LS
1
$23,000.00
$23,000.00
1
$23,000.00
$23,000.00
21
Ped Ramp
EA
15
$1,365.00
$20,475.00
15
$1,365.00
$20,475.00
22
Reinstall Traffic Loops
EA
154
$285.00
$43,890.00
154
$285.00
$43,890.00
"1
R&R Alley Apron
SF
275
$10.00
$2,750.00
2,655
$10.00
$26,550.00
New Driveway
SF
1,880
$5.88
$11,054.40
4,528
$5.88
$26,624.64
Page 1
CONTRACT CHANGE ORDER NO. 1
Original Contract
Adjusted Contract
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
25
R&R Driveway
SF
6,694
$7.14
$47,795.16
6,694
$7.14
$47,795.16
26
R&R Storm Drain Cover
D-3
EA
1
$1,426.00
$1,426.00
1
$1,426.00
$1,426.00
27
New Gravity Wall
CY
3
$1,113.00
$3,339.00
3
$1,113.00
$3,339.00
28
R&RRetainingWall
SF
363
$42.00
$15,246.00
363
$42.00
$15,246.00
EXTRA
WORK ITEMS
29
R&R Inlet Frame and
LS
1
$2,870.00
$2,870.00
30
Clean and Fog Seal
Medians on Harbor
SF
36,041
$0.06
$2,162.46
TOTALS
$1,890,377.18
$2,000,860.16
DISCUSSION:
Line Item No. 29 is being added to the contract at the City's request to provide
compensation to the contractor for removing, raising and replacing an inlet frame and
cover to match the newly constructed street grade on D Avenue.
Line Item No. 30 is added to the contract at the City's request to provide compensation to
the contractor for cleaning and fog sealing the median on Harbor Dr. from 8th St. to Civic
Center Drive to complement the overlay improvements being done on Harbor Dr.
Line Item No. 16 is increased at the City's request to provide compensation to the
Contractor for the construction of new sidewalk on 5th St. from Harbison Ave. to the Cul-
de-sac and additional sidewalk needed to provide hazard free pedestrian access to areas
that are currently unimproved.
Line Item No. 18 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of curb and gutter required to provide proper
drainage of runoff. These additional quantities were determined to be required to protect
the integrity of the newly constructed street section in the area and were not included in
the initial estimate.
Line Item No. 19 is increased at the City's request to provide compensation to the
Contractor for the construction of new curb and gutter on 5th St. from Harbison Ave. to
the Cul-de-sac.
Line Item No. 23 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of alley aprons that were determined to be
required to properly convey runoff from the newly construction street section.
Page 2
CONTRACT CHANGE ORDER NO. 1
Line Item No. 24 is increased at the City's request to provide compensation to the
Contractor for the construction of new driveways on 5th St. from Harbison Ave. to the
Cul-de-sac.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $110,482.98 from the current
contract price of $1,890,377.18 to a new contract price of $2,000,860.16.
2. The contract time is unchanged. The contract completion date was previously
established as Monday, September 15, 2003.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Hanson SJH Construction, Inc. will not be entitled to damages
or additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED FOR APPROVAL BY:
Michael J Long, A
APPR I VED BY:
neer
73v a6
Dat
Mr. David R Hummel, President Date
Hanson SJH Construction, Inc.
Mr. M. L. Wilde, Assistant Secretary Date
Hanson SJH Construction, Inc.
Nick Inzunza, Mayor Date
Page 3
CONTRACT CHANGE ORDER NO. 1 ORIGINAL
DATE: July 30, 2003
PROJECT: National City Street Resurfacing Project FY 02-03, Specification
No. 02-2
TO:
David R Hummel, President
Hanson SJH Construction, Inc.
P. O. Box 639069
San Diego, CA 92163-9069
DESCRIPTION OF CHANGE:
This change order is written to add work item numbers 29 and 30 to the contract and to
increase the original bid quantities of line items 16, 18, 19, 23, & 24.
Original Contract
Adjusted Contract
No
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
1
Mobilization
LS
1
$21,323.10
$21,323.10
1
$21,323.10
$21,323.10
2
Clearing and Grubbing
LS
1
$1,000.00
$1,000.00
1
$1,000.00
$1,000.00
3
Unclassified Excavation
CY
800
$21.29
$17,032.00
800
$21.29
$17,032.00
4
R&R Street Section 1.5"
AC on 8" Base
SF
59,614
$2.54
$151,419.56
59,14
$2.54
$151,419.56
R&R Street Section 2"
AC on 10" Base
SF
85,859
$2.55
$218,940.45
85,859
$2.55
$218,940.45
6
R&R Street Section 3"
AC on 8" Base
SF
107,031
$2.52
$269,718.12
107,031
$2.52
$269,718.12
7
R&R AC Only
TON
S
1,185
$60.82
$72,071.70
1,185
$60.82
$72,071.70
8
Pavement Milling
LF
62,390
$0.73
$45,544.70
62,390
$0.73
$45,544.70
9
Pavement Fabric
SY
126,589
$0.75
$94,941.75
126,589
$0.75
$94,941.75
10
AC Overlay
TON
S
12,246
$45.00
$551,070.00
12,246
$45.00
$551,070.00
11
Manholes
EA
65
$200.00
$13,000.00
65
$200.00
$13,000.00
12
Monuments
EA
9
$150.00
$1,350.20
9
$150.00
$1,350.20
13
R&R Cross Gutter
SF
6,079
$15.86
$96,412.94
6,079
$15.86
$96,412.94
14
New Cross Gutter
SF
1,124
$16.59
$18,647.16
1,124
$16.59
$18,647.16
15
R&R Sidewalk
SF
6,990
$6.30
$44,037.00
6,990
$6.30
$44,037.00
16
New Sidewalk
SF
4,471
$5.25
$23,472.75
6,411
$5.25
$33,657.75
17
Remove Concrete
SF
1,350
$3.47
$4,684.50
1,350
$3.47
$4,684.50
18
R&R Curb and Gutter
LF
1,939
$27.72
$53,749.08
3,388
$27.72
$93,915.36
19
New Curb and Gutter
LF
1,023
$22.47
$22,986.81
1,723
$22.47
$38,715.81
20
Traffic Striping
LS
1
$23,000.00
$23,000.00
1
$23,000.00
$23,000.00
21
Ped Ramp
EA
15
$1,365.00
$20,475.00
15
$1,365.00
$20,475.00
22
Reinstall Traffic Loops
EA
154
$285.00
$43,890.00
154
$285.00
$43,890.00
^a
R&R Alley Apron
SF
275
$10.00
$2,750.00
2,655
$10.00
$26,550.00
New Driveway
SF
1,880
$5.88
$11,054.40
4,528
$5.88
$26,624.64
Page 1
CONTRACT CHANGE ORDER NO. 1
Original Contract
Adjusted Contract
_ a
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
25
R&R Driveway
SF
6,694
$7.14
$47,795.16
6,694
$7.14
$47,795.16
26
R&R Storm Drain Cover
D-3
EA
1
$1,426.00
$1,426.00
1
$1,426.00
$1,426.00
27
New Gravity Wall
CY
3
$1,113.00
$3,339.00
3
$1,113.00
$3,339.00
28
R&RRetainingWall
SF
363
$42.00
$15,246.00
363
$42.00
$15,246.00
EXTRA WORK ITEMS
29
R&R Inlet Frame and
Cover
LS
1
$2,870.00
$2,870.00
30
Clean and Fog Seal
Medians on Harbor
Drive
SF
36,041
$0.06
$2,162.46
TOTALS
$1,890,377.18
$2,000,860.16
DISCUSSION:
Line Item No. 29 is being added to the contract at the City's request to provide
compensation to the contractor for removing, raising and replacing an inlet frame and
cover to match the newly constructed street grade on D Avenue.
Line Item No. 30 is added to the contract at the City's request to provide compensation to
the contractor for cleaning and fog sealing the median on Harbor Dr. from 8th St. to Civic
Center Drive to complement the overlay improvements being done on Harbor Dr.
Line Item No. 16 is increased at the City's request to provide compensation to the
Contractor for the construction of new sidewalk on 5th St. from Harbison Ave. to the Cul-
de-sac and additional sidewalk needed to provide hazard free pedestrian access to areas
that are currently unimproved.
Line Item No. 18 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of curb and gutter required to provide proper
drainage of runoff. These additional quantities were determined to be required to protect
the integrity of the newly constructed street section in the area and were not included in
the initial estimate.
Line Item No. 19 is increased at the City's request to provide compensation to the
Contractor for the construction of new curb and gutter on 5th St. from Harbison Ave. to
the Cul-de-sac.
Line Item No. 23 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of alley aprons that were determined to be
required to properly convey runoff from the newly construction street section.
Page 2
CONTRACT CHANGE ORDER NO. 1
Line Item No. 24 is increased at the City's request to provide compensation to the
Contractor for the construction of new driveways on 5th St. from Harbison Ave. to the
Cul-de-sac.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $110,482.98 from the current
contract price of $1,890,377.18 to a new contract price of $2,000,860.16.
2. The contract time is unchanged. The contract completion date was previously
established as Monday, September 15, 2003.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Hanson SJH Construction, Inc. will not be entitled to damages
or additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED FOR APPROV BY:
Michael J ong, Ass
APPR 1c VED BY:
neer Date
Mr. David R. Hummel, President Date
Hanson SJH Construction, Inc.
Mr. M. L. Wilde, Assistant Secretary Date
Hanson SJH Construction, Inc.
Nick Inzunza, Mayor Date
Page 3
CONTRACT CHANGE ORDER NO. 1 ORIGINAL
DATE: July 30, 2003
PROJECT: National City Street Resurfacing Project FY 02-03, Specification
No. 02-2
TO:
David R. Hummel, President
Hanson SJH Construction, Inc.
P. O. Box 639069
San Diego, CA 92163-9069
DESCRIPTION OF CHANGE:
This change order is written to add work item numbers 29 and 30 to the contract and to
increase the original bid quantities of line items 16, 18, 19, 23, & 24.
Original Contract
Adjusted Contract
No
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
1
Mobilization
LS
1
$21,323.10
$21,323.10
_ 1
$21,323.10
$21,323.10
2
Clearing and Grubbing
LS
1
$1,000.00
$1,000.00
1
$1,000.00
$1,000.00
3
Unclassified Excavation
CY
800
$21.29
$17,032.00
800
$21.29
$17,032.00
4
R&R Street Section 1.5"
AC on 8" Base
SF
59,614
$2.54
$151,419.56
59,14
$2.54
$151,419.56
J
R&R Street Section 2"
AC on 10" Base
SF
85,859
$2.55
$218,940.45
85,859
$2.55
$218,940.45
6
R&R Street Section 3"
AC on 8" Base
SF
107,031
$2.52
$269,718.12
107,031
$2.52
$269,718.12
7
R&R AC Only
TON
S
1,185
$60.82
$72,071.70
1,185
$60.82
$72,071.70
8
Pavement Milling
LF
62,390
$0.73
$45,544.70
62,390
$0.73
$45,544.70
9
Pavement Fabric
SY
126,589
$0.75
$94,941.75
126,589
$0.75
$94,941.75
10
AC Overlay
TON
S
12,246
$45.00
$551,070.00
12,246
$45.00
$551,070.00
11
Manholes
EA
65
$200.00
$13,000.00
65
$200.00
$13,000.00
12
Monuments
EA
9
$150.00
$1,350.20
9
$150.00
$1,350.20
13
R&R Cross Gutter
SF
6,079
$15.86
$96,412.94
6,079
$15.86
$96,412.94
14
New Cross Gutter
SF
1,124
$16.59
$18,647.16
1,124
$16.59
$18,647.16
15
R&R Sidewalk
SF
6,990
$6.30
$44,037.00
_
6,990
$6.30
$44,037.00
16
New Sidewalk
SF
4,471
$5.25
$23,472.75
6,411
$5.25
$33,657.75
$4,684.50
17
Remove Concrete
SF
1,350
$3.47
$4,684.50
1,350
$3.47
18
R&R Curb and Gutter
LF
1,939
$27.72
$53,749.08
3,388
$27.72
$93,915.36
19
New Curb and Gutter
LF
1,023
$22.47
$22,986.81
1,723
$22.47
$38,715.81
$23,000.00
20
Traffic Striping
LS
1 _
$23,000.00
$23,000.00
1
$23,000.00
21
Ped Ramp
EA
15
$1,365.00
$20,475.00
15
$1,365.00
$20,475.00
22
Reinstall Traffic Loops
EA
154
$285.00
$43,890.00
154
$285.00
$43,890.00
'z
R&R Alley Apron
SF
275
$10.00
$2,750.00
2,655
$10.00
$26,550.00
New Driveway
SF
_ 1,880
$5.88
$11,054.40
4,528
$5.88
$26,624.64
Page 1
CONTRACT CHANGE ORDER NO. 1
Original Contract
Adjusted Contract
Item
Unit
Bid Qty
Unit
Price
Amount
Adjusted
Qty
Unit
Price
Amount
25
R&R Driveway
SF
6,694
$7.14
$47,795.16
6,694
$7.14
$47,795.16
26
R&R Stan 'Drain Cover
D-3
EA
1
$1,426.00
$1,426.00
1
$1,426.00
$1,426.00
27
New Gravity Wall
CY
3
$1,113.00
$3,339.00
3
$1,113.00
$3,339.00
28
R&RRetainingWall
SF
363
$42.00
$15,246.00
363
$42.00
$15,246.00
EXTRA WORK ITEMS
29
R&R Inlet Frame and
Cover
LS
1
$2,870.00
$2,870.00
30
Clean and Fog Seal
Medians on Harbor
Drive
SF
36,041
$0.06
$2,162.46
TOTALS
$1,890,377.18
$2,000,860.16
DISCUSSION:
Line Item No. 29 is being added to the contract at the City's request to provide
compensation to the contractor for removing, raising and replacing an inlet frame and
cover to match the newly constructed street grade on D Avenue.
Line Item No. 30 is added to the contract at the City's request to provide compensation to
the contractor for cleaning and fog sealing the median on Harbor Dr. from 8th St. to Civic
Center Drive to complement the overlay improvements being done on Harbor Dr.
Line Item No. 16 is increased at the City's request to provide compensation to the
Contractor for the construction of new sidewalk on 5th St. from Harbison Ave. to the Cul-
de-sac and additional sidewalk needed to provide hazard free pedestrian access to areas
that are currently unimproved.
Line Item No. 18 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of curb and gutter required to provide proper
drainage of runoff. These additional quantities were determined to be required to protect
the integrity of the newly constructed street section in the area and were not included in
the initial estimate.
Line Item No. 19 is increased at the City's request to provide compensation to the
Contractor for the construction of new curb and gutter on 5th St. from Harbison Ave. to
the Cul-de-sac.
Line Item No. 23 is increased at the City's request to provide compensation to the
Contractor for the removal and replacement of alley aprons that were determined to be
required to properly convey runoff from the newly construction street section.
Page 2
CONTRACT CHANGE ORDER NO. 1
Line Item No. 24 is increased at the City's request to provide compensation to the
Contractor for the construction of new driveways on 5th St. from Harbison Ave. to the
Cul-de-sac.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $110,482.98 from the current
contract price of $1,890,377.18 to a new contract price of $2,000,860.16.
2. The contract time is unchanged. The contract completion date was previously
established as Monday, September 15, 2003.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Hanson SJH Construction, Inc. will not be entitled to damages
or additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED FOR APPROVAL BY:
Michael J. ng, Asso'e C p'il Engi Dat
APPROVED BY:
Mr. David R. Hummel, President
Hanson SJH Construction, Inc.
Date
Mr. M. L. Wilde, Assistant Secretary Date
Hanson SJH Construction, Inc.
Nick Inzunza, Mayor Date
Page 3
City of National City, California
COUNCIL AGENDA STATEMENT
AEETING DATE August 5, 2003
'033
AGENDA ITEM NO. 10
(-ITEM TITLE RESOLUTION OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR"
TO APPROVE CONTRACT CHANGE ORDER NUMBER 1 FOR NATIONAL CITY STREET
RESURFACING PROJECT FY 02-03, SPEC. NO. 02-2
PREPARED BY Michael Long DEPARTMENT Engineering
336-4386
EXPLANATION
See attached Explanation
♦
Environmental Review x N/A
J
/ Financial Statement Funding is available through
Account No. 307-409-500-598-6035, 109-409-500-598-6035
343-409-500-598-6035 and 345-409-500-598-6035.
pproved By:
Finance Director
Account No.
STAFF RECOMMENDATION
Adopt the Resolution.
BOARD / COMMISSION - COMMENDATION
N/A
ATTACHMENTS ( Listed Below
1. Resolution
2. Contract Change Order No. 1
02-2
Resolution No. 2003-110
A-200 (9;99)
Explanation:
On January 21, 2003 the City Council awarded a contract in the amount of $1,890,377.18 to
Hanson SJH Construction Inc. for the National City Street Resurfacing Project. The project
combines two years of funding and the total estimated project cost was $2,270,000.00 which
includes an approximate 15% bid contingency of $285,000.00
The project includes the removal and replacement of failed pavement section, curb and gutter,
sidewalk, alley aprons, and driveways, in addition to the construction of new curb and gutter,
sidewalks, and driveways, pavement fabric placement, overlay, restriping, and traffic signal
loop replacement.
The total cost of this change order increases the contract by $110,482.98. This change order
includes costs associated with the construction of E. 5th Street from Harbison to the cul-de-
sac. Included in the construction of 5th Street are all curb, gutter, sidewalk, driveway and
asphalt pavement improvements to ensure proper drainage and street design conformance.
This work was requested by a Councilmember approximately a week after the contract was
awarded and was not included in the original estimated quantities. The cost associated with
the addition of 5th Street is approximately $70,000.00.
The additional $40,000.00 of this change order is for removing/replacing or installation of
concrete improvements (i.e. curb and gutter, sidewalks, alleys aprons, and driveways) that
where discovered in field to have failed, or presented drainage and/or pedestrian and
vehicular traffic hazards. This work was added by department staff to correct these problems.
This project is currently about approximately 70% complete. It is further anticipated that
additional costs to correct failures or futures hazardous conditions not figured directly into the
original bid estimate may be encountered. These costs are expected and are the reason for
the 15% contingency included in the total project estimate upon award.
This change order in conjunction with projected additions will provide a complete and thorough
project that should keep within the original time frame and total estimated project cost of
$2,270,000.00.
RESOLUTION NO. 2003 — 110
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO APPROVE
CONTRACT CHANGE ORDER NO. 1 FOR
THE STREET IMPROVEMENTS PROJECT
FOR NATIONAL CITY STREET
RESURFACING PROJECT FY 2002/2003
(Engineering Specification No. 02-02)
WHEREAS, on February 4, 2003, the City Council passed Resolution No.
2003-22, awarding a contract to SJH Construction, Inc. for the National City Street
Resurfacing Project, Engineering Specification No. 02-2; and
WHEREAS, after the contract was awarded, additional work was
requested by the City for the construction of East 5th Street from Harbison to the cul-de-
sac at a cost of approximately $70,000; and
WHEREAS, during construction it was discovered that additional work was
necessary for the removing, replacing or installation of concrete improvements at an
approximate cost of $40,000; and
WHEREAS, it is anticipated that additional costs to correct failures or
future hazardous conditions that were not figured directly into the original bid estimate
7y be encountered.
WHEREAS, Change Order No. One is necessary to address the additional
costs of the project addressed above, which increases the current contract amount from
$1,890,377.18 to $2,000,860.16, a difference of $110,482.98.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City that Change Order No. One is hereby approved.
PASSED and ADOPTED this 5th day of August, 2003.
ATTEST:
Mic --I Dalla, Cit Clerk
rill°4j‘
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on August 5, 2003,
by the following vote, to -wit:
Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
NICK INZUNZA
Mayor of the City of National City, California
de()
City Cl rk of the City of I jational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2003-110 of the City of National City, California, passed and adopted by
the Council of said City on August 5, 2003.
City Clerk of the City of National City, California
By:
Deputy