HomeMy WebLinkAbout2003 CON ASSI Security - Change Order #3CONTRACT CHANGE ORDER NO. 3
DATE: 1/15/03
ORIGINAL
PROJECT: Civic Center and Police Facility Security and Fire System
Enhancements, Specification No. 02-6
TO:
Mr. William Vuono, President
ASSI Security, Inc.
18001 Cowan, Suite A
Irvine, CA 92614
DESCRIPTION OF CHANGE:
This change order is written to increase the amount of item number 2 (shown below).
No
Item
Unit
Bid
Qty
Current
Contract
Amount
Adjusted
Contract
Amount
1.
Mobilization
LS
1
$2,000.00
$2,000.00
2.
Install Security Access Control
System
LS
1
$96,530.00
$98,345.00
3.
Install Digital Video Recording
System
LS
1
$18,000.00
$18,000.00
4,
Install Electrified/Finish Door
Hardware
LS
1
$22,000.00
$22,000.00
5.
Install Head -End
LS
1
$9,000.00
$9,000.00
6.
Install Fire Alarm System
LS
1
$85,000.00
$85,000.00
7.
Project Close -Out
(Training and Manuals)
LS
1
$1,300.00
$1,300.00
8.
Automated ADA Access
Hardware (3 existing doors)
LS
1
$21,620.00
$21,620.00
Total
$255,450.00
$257,265.00
DISCUSSION:
The contract price for Line Item No. 2 is increased by $1815.00 at the City's request to
provide compensation to the contractor for furnishing and installing one additional
proximity card reader and associated door hardware, for the lobby area. These additional
items have been determined necessary to address after hours first floor building access
requirements.
Page 1
.. r
CONTRACT CHANGE ORDER NO. 3
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $1,815.00 from the current
contract price of $255,450.00 to a new contract price of $257,265.00.
2. The contract time is unchanged. The contract completion date was previously
established as
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. ASSI Security, Inc. will not be entitled to damages or
additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED FOR APPROVAL BY:
4,144_
Mr. William Vuono, President
ASSI Security, Inc.
Mr. Michael Willey, Vice ' - i.
ASSI Sec '''�, Inc.
.)
iii»Avid
B 'cam. '''s
Director of Public Works/E
gineering
Page 2
Date
Date
Dat