HomeMy WebLinkAbout2003 CON ASSI Security - Change Order #3CONTRACT CHANGE ORDER NO. 3 DATE: 1/15/03 ORIGINAL PROJECT: Civic Center and Police Facility Security and Fire System Enhancements, Specification No. 02-6 TO: Mr. William Vuono, President ASSI Security, Inc. 18001 Cowan, Suite A Irvine, CA 92614 DESCRIPTION OF CHANGE: This change order is written to increase the amount of item number 2 (shown below). No Item Unit Bid Qty Current Contract Amount Adjusted Contract Amount 1. Mobilization LS 1 $2,000.00 $2,000.00 2. Install Security Access Control System LS 1 $96,530.00 $98,345.00 3. Install Digital Video Recording System LS 1 $18,000.00 $18,000.00 4, Install Electrified/Finish Door Hardware LS 1 $22,000.00 $22,000.00 5. Install Head -End LS 1 $9,000.00 $9,000.00 6. Install Fire Alarm System LS 1 $85,000.00 $85,000.00 7. Project Close -Out (Training and Manuals) LS 1 $1,300.00 $1,300.00 8. Automated ADA Access Hardware (3 existing doors) LS 1 $21,620.00 $21,620.00 Total $255,450.00 $257,265.00 DISCUSSION: The contract price for Line Item No. 2 is increased by $1815.00 at the City's request to provide compensation to the contractor for furnishing and installing one additional proximity card reader and associated door hardware, for the lobby area. These additional items have been determined necessary to address after hours first floor building access requirements. Page 1 .. r CONTRACT CHANGE ORDER NO. 3 CONTRACT ADJUSTMENT: As a result of this change order the contract price is adjusted as follows: 1. The contract price is increased in the amount of $1,815.00 from the current contract price of $255,450.00 to a new contract price of $257,265.00. 2. The contract time is unchanged. The contract completion date was previously established as This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. ASSI Security, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. RECOMMENDED FOR APPROVAL BY: 4,144_ Mr. William Vuono, President ASSI Security, Inc. Mr. Michael Willey, Vice ' - i. ASSI Sec '''�, Inc. .) iii»Avid B 'cam. '''s Director of Public Works/E gineering Page 2 Date Date Dat