HomeMy WebLinkAbout2003 CON Carrier Johnson Architects - Consulting New Library Change Order 1DESIGN AGREEMENT CHANGE ORDER NUMBER ONE DATE: September 29, 2003 PROJECT: National City Municipal Library TO: Gordon R. Carrier Carrier Johnson 1301 Third Avenue San Diego, CA 92101 DESCRIPTION OF CHANGE: This design agreement change order has two components: 1. The first component of the change order is being written to increase the allowed Reimbursable Expenses section of the design agreement by $3,030. 2. The second component of the change order is being written to increase the Contract Documents section of the design agreement by $6,500. Item Original Agreement Amount Adjusted Agreement Amount Design Development $265,260 $265,260 Contract Documents $518,988 $525,488 Bidding Services $18,300 $18,300 Construction Administration $250,320 $250,320 Reimbursable Expenses $36,800 $39,830 Total $1,089,668 $1,099,198 DISCUSSION: The following is a discussion of each component in the same order as listed above: 1. At the time that the design agreement was negotiated it was not known that the Department of the State Architect would have to review the documents. It was believed that since the State Office of Library Construction also had an architect on staff that would be reviewing the plans, the OLC review would suffice. However we have since found out that the DSA will be providing an additional review and that the cost of the review is $3,030. Carrier Johnson has submitted the plans as required and paid the fee. This component of the change order increases the Reimbursable Expenses section of the fee agreement to cover these costs. 2. The site has changed since the original topographical survey was prepared for the project. A Avenue has been realigned which alters the southeast corner of the site. The property was also used as a construction staging area by a number of construction companies. Each time a company moved on and off the site they scraped the site and moved earth around. It appears a couple of the companies may have actually imported soil and spread it around the site as they left. The grading of the site for the library is complicated. According to the soils report eight feet of material under the building, and between two and four feet of material under the parking lot must be removed and mechanically re -compacted in order to be suitable for construction. In addition, due to the flood plane, the site must be filled in order to achieve a satisfactory building pad elevation. Due to the challenges of the grading and the changes that have occurred in the time since the originally site survey, it has been determined that re -surveying would be prudent. Having an accurate survey will ensure that those bidding on the project don't have to make assumptions and can prepare the best bid possible. DESIGN AGREEMENT ADJUSTMENT: As a result of this change order the design agreement is adjusted as follows: 1. The price is increased in the amount of $9,530 from the current contract price of $1,089,668 to a new contract price of $1,099,198. 2. The time is unchanged. The contract completion date was previously established as Wednesday, June 1, 2005. This Change Order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work as described herein. APPROVED BY: CITY OF NATIONAL CITY By: Stephen M. Kirkpat Acting Director of Works/Engineering CARRIER JOHNSON By: Gordon Princi By: Michael Johnson Principal er CARRIER JOIJNSON ARCHITECTURE INTERIOR DESIGN PLANNING GORDON R CARRIER AIA MICHAEL C. JOHNSON AIA WILLIAM C. BOCKEN AIA DEBORAH P. ELLIOTT IIDA FRANK A. WOLDEN 1301 THIRD AVENUE SAN DIEGO CALIFORNIA 92101 TEL 619 239 2353 FAX 619 239 6227 2600 MICHELSON DR SUITE 400 IRVINE CALIFORNIA 92612 TEL 949 955 2353 FAX 949 955 2377 www.carrierjohnson.com G.R. CARRIER ARCHITECT August 29, 2003 Mr. Stephen M. Kirkpatrick Assistant Director of Public Works/Engineering CITY OF NATIONAL CITY 1243 National City Boulevard National City, CA 91950-4301 RE: National City Public Library — Plan Check Fees CJ Project No. 4486.00 Dear Steve, ISSUED VIA 1S1 CLASS MAIL Per your request on August 26, 2003, we have paid the DSA Plan Check Application Fee of $3,030.00 on the City's behalf. This permit cost is not a Design Team responsibility but was paid by Carrier Johnson (to expedite the permit process) on your direction that our fee would be augmented to cover the cost. Please raise our reimbursable expense limit from $36,800 to $39,830 to account for this unforeseen cost. This raises our Contract amount from $1,089,668 to $1,092,698 as a result. Our expenses to date have been tracking on target with the exception of this fee cost. We look forward to receiving a Contract Amendment on this matter and the completion of Bidding Documents in the near future. Sincerely, CARRIER JOHNSON Kevin L. Krumdieck Senior Associate, Architect KLK/ppm cc: Gordon Carrier Chuck Lockwood File 4486.00 / 1.0 & 3.1 P: -4486. 00A CorrespondenceVClien[ALetters V03-0829. Plan -Check -Fees doc i ARCHITECTURE INTERIOR DESIGN PLANNING GORDON R. CARRIER AIA MICHAEL C. IOHNSON AIA WILLIAM C. BOCKEN AIA DEBORAH P. ELLIOTT IIDA FRANK A. WOLDEN 1301 THIRD AVENUE SAN DIEGO CALIFORNIA 92101 TEL 619 239 2353 FAX 619 239 6227 2600 MICHELSON DR SUITE 400 IRVINE CALIFORNIA 92612 TEL 949 955 2353 FAX 949 955 2377 3450 SACRAMENTO ST. 6614 SAN FRANCISCO, CA 94118 TEL 415 491 2300 FAX 415 921 6698 www.carrierjohnson, com CARRIER JO;HNSON September 26, 2003 (f & &U. (4126(03) Mr. Stephen Kirkpatrick c) Assistant Director of Public Works ?' City of National City, Engineering Department 1243 National City Boulevard National City, CA 91950 RE: City of National City Public Library Survey Update Additional Services Proposal Dear Steve, This proposal is offered to cover additional design services related to updating the survey. As noted by JEB, the survey is no longer accurate due to the improvements along NCB, realignment of A street, and miscellaneous grading/ fencing revisions interior to the site. These have been shown in a piece meal fashion on the grading and utilities plans but should be shown in a revised survey as well to avoid contractor bidding irregularities. Attached is LMA proposal for your review. The cost is $6,500 which directly on to you without markup due to our limited involvement in the work. We also recognize this was not anticipated and are trying cost exposure. We believe this additional work is valuable to the pro should be done in this manner. we will pass coordinating to limit your ject and Please authorize us to proceed as quickly as you can so the work can and the results coordinated with our bid package. We will use 4486. our invoices to you. Call if you have questions. Sincerely, CARRIER JOHNSON Kevin L Krumdieck, Senior Project Manager get underway 03 to identify G.R. CARRIER ARCHITECT 99, 25/ 2003 11: 23 519-290-1515 LINTVEDT MCCOLL ASOC PAGE 02 LIf1TVED ,, fnkCOLL 8 A 5 5 0 C 1 iA T E 5 PLANNING ■ CIVIL ENGINEERING • LAND SURVEYING IL am AM I I September 25, 2003 WO 12189 Mr. Kevin Krumdieck Carrier Johnson 1301 Third Avenue San Diego, CA 92101 RE: National City Library Dear Mr. Krumdieck: Per your request, we have reviewed the request to provide an updated aerial survey for the National City Library site resulting from the recent A Ave construction, changes in existing site conditions and improvement to National City Boulevard. Our scope and fee for this work is as follows: Snnpo. of Work Rse tnpngraphir` mapping 1. Provide a new aerial survey topographic survey in AutoCAD format at a scale of 1"=20' with one foot contour intervals. The new topographic survey data will replace the previously compiled aerial in the base sheets containing both boundary information and existing utilities on site and in the adjacent public street that were plotted from records provided by the City of National City, SDG&E, Pacific Bell, and the cable TV franchise utilities and adjusted to match field -surveyed locations of surface features. No boundary review, additional utility research or potholing of existing utilities has been included in this scope of work $6,500 Please review our proposal and let me know if you have any questions. Very truly yours, ack Dullaghan, P. Associate Enginee 3737 Camino Del Rio South, Suite 200 .San Diego, CA 92108-4008 n(619) 280.3100 .FAX (619) 280.1515 Fo\WINOATA\JOBS\12189 CarrierJohnson NC Ubrary\P3931 NCUbrary\new Air-fee.doc