HomeMy WebLinkAbout2003 CON County Wastewater Agencies - Mutual Aid AgreementSan Diego County Public Wastewater Agencies Mutual Aid Agreement THIS AGREEMENT is made and entered into as of July 1, 2003 by and among the Cities of Chula Vista, Coronado, Del Mar, El Cajon, Escondido, Imperial Beach, La Mesa, National City, Poway, Lemon Grove Sanitation District, San Diego, the County of San Diego, the Otay Water District, and the Padre Dam Municipal Water District, each of said public agencies being a "Party" and all said public agencies being herein referred to collectively as "the Parties." WHEREAS, the Parties intend to share designated services and resources which each has available to complete routine business and to assist in the event of emergencies; and WHEREAS, the purpose of this Agreement is to memorialize the Parties' understanding specifying the designated services and equipment, which the agencies are agreeing to share, and to provide the terms and conditions pursuant to which the service and equipment will be shared; and WHEREAS, some of the Parties may have previously entered into an emergency mutual aid agreement with one or more of the other Parties, in which event the prior emergency mutual aid agreement shall be controlling for all purposes; NOW, THEREFORE, in consideration of the mutual covenants and conditions herein contained, the Parties hereby agree as follows: ARTICLE I - DEFINITION OF EMERGENCY AND REQUEST FOR ASSISTANCE. A wastewater emergency is a major infrastructure equipment or process failure or supply shortage or other plant disruption that is, or is likely to be, beyond the capability of the immediately available services, personnel, equipment, supplies and facilities of the Party requesting assistance. Hereinafter, the Party rendering assistance is referred to as LENDER, and the Party receiving assistance is referred to as BORROWER. ARTICLE II - GENERAL NATURE OF ASSISTANCE. Assistance will generally be in the form of resources such as equipment, supplies, and personnel. Assistance shall be given to the extent LENDER determines that its own needs can continue to be met. A potential LENDER shall not be held liable for failing to provide assistance. A potential LENDER has the absolute Page 1 of 7 discretion to decline to provide any requested assistance. Resources are to be made available on a loan basis, with repayment terms, to be agreed upon, varying with the type of resource. Each Party agrees to provide up-to-date information on an annual basis of its resources that may be available for assistance. In the event that the LENDER and the BORROWER have in place a separate mutual aid agreement, governing the conduct of those parties, the separate mutual aid agreement shall govern and control the conduct of the LENDER and the BORROWER in making a request for emergency assistance and providing a response to such a request. ARTICLE III — REQUESTS FOR ASSISTANCE. Requests for emergency assistance under this agreement shall be directed to the Department Head or designated representative of the appropriate department of LENDER. ARTICLE IV - LOANS OF EQUIPMENT. Use of equipment such as service equipment, construction equipment, pumps, or maintenance trucks shall be at LENDER's current equipment rate and subject to the following conditions: a) Upon receipt of a request identified in Article III above, the LENDER shall prepare a document describing the items being loaned. The BORROWER shall execute an acknowledgement of receipt of the equipment or services upon delivery or performance. b) At the option of the LENDER, loaned equipment may be loaned with an operator. c) Loaned equipment shall be returned immediately to LENDER when the LENDER requests it or when an emergency is over, whichever is sooner. BORROWER shall, at its own expense, supply all fuel, lubrication, and maintenance for all loaned equipment. Documentation and maintenance records shall be ptovided for the LENDER, if requested, with the returned equipment. e) LENDER's costs related to the transportation, handling and loading/unloading of equipment shall be chargeable costs to BORROWER. Page 2 of 7 f) Loaned equipment if damaged or lost by BORROWER shall be repaired or replaced as soon as possible by BORROWER to the satisfaction of the LENDER, excepting wear and tear in the normal course of use of the equipment. The cost of repairs shall be the responsibility of the BORROWER causing the damage. g) A return receipt shall be executed by the LENDER upon return of any items, equipment, supplies or personnel to the BORROWER, acknowledging the return of the equipment, supplies or personnel, and noting any damage or injury thereto, or loss thereof. ARTICLE V — PERSONNEL. LENDER may make available to BORROWER such employees as are willing to participate and have the necessary skills. An employee "borrowed" pursuant to this agreement shall, to the extent possible, work under the supervision of his/her own employer, who shall remain liable for any Worker's Compensation award. Personnel of the LENDER operating loaned equipment shall be considered "borrowed" personnel. ARTICLE VI — COMPENSATION. BORROWER shall compensate the LENDER for the equipment utilized as set forth in the latest version of the Rate Schedule included herein as Exhibit 1, which may be amended from time to time by substituting a subsequently dated Exhibit. Following the return of the equipment to the LENDER a statement of use shall be prepared by the BORROWER and submitted to the appropriate Department Head of the LENDER. BORROWER shall reimburse LENDER in kind or at actual replacement costs plus handling charges, at the LENDER's option, for use of expendable or non -returnable supplies such as chemicals or pipes cut to size. For any Emergency Request event occurring under this Agreement, no LENDER shall lend personnel, equipment, or supplies to a BORROWER which cumulatively exceeds an estimated worth of $500,000. Other supplies and reusable items such as valves or fittings that are returned to LENDER in a clean, damage -free condition shall not be charged to the BORROWER and no rental fee will be charged, otherwise, they shall be treated as expendable supplies. Cost to feed and house loaned personnel, if necessary, shall be chargeable to and paid by the BORROWER. Labor costs shall be equal to the LENDER employee's current salary or appropriate hourly wage (including overtime, if applicable) plus fringe benefits and overhead. Should the LENDER require the use of the Page 3 of 7 equipment or services which it has provided to the BORROWER during the period of use, and if BORROWER is unable or unwilling to return the equipment or services, then the LENDER shall be reimbursed by the BORROWER for costs incurred by the LENDER to rent or lease replacement equipment. The LENDER shall prepare and send an invoice to the BORROWER and payment shall be made by the BORROWER within 30 days of receipt of the invoice. ARTICLE VII - INDEMNIFICATION. Each Party and their respective elected and appointed officials, officers, agents and employees (when acting as a BORROWER) hereby agrees to defend, indemnify and hold the other Parties, and their respective elected and appointed officials, officers, agents and employees (when acting in the capacity of LENDER to the BORROWER) harmless from any and all claims, demands, causes of action, damages, costs and expenses, including attorneys' fees, property damage, bodily injury, personal injury, losses or liabilities, in law or in equity, of every kind and nature, due to any case whatsoever arising out of, or in any manner directly or indirectly connected with its use of the LENDER's equipment and services provided for in this Agreement which is not the result of or caused by the negligence, omission or intentional misconduct of the LENDER, or its elected or appointed officials, officers, agents or employees. ARTICLE VIII - MODIFICATIONS AND OTHER PROVISIONS. Any provision of this Agreement may be modified, altered or rescinded by mutual written agreement of all the parties, attached to and incorporated in this Agreement. This Agreement is not transferable or assignable, in whole or in part, and is subject to cancellation at any time by any party upon written notice delivered or mailed to each of the other parties. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first herein above written by their respective officer thereunto duly authorized. This Agreement is being executed in counterparts. This Agreement shall become operative as soon as one counterpart hereof has been executed by each party. The counterparts so executed shall constitute one Agreement notwithstanding that the signatures of all parties do not appear on the same page. Page 4 of 7 Dated: Dated: Dated: Dated: Dated: Agency: City of Chula Vista By Signature Title Agency: City of Coronado By Signature Title Agency: City of Del Mar By Signature Title Agency: City of El Cajon By Signature Title Agency: City of Escondido By Signature Title Page 5 of 7 Dated: Dated: Agency: City of Imperial Beach By Signature Title Agency: City of La Mesa Signature By Title Dated: October 7, 2003 Agency: City of National City By Nick Inzun Signature Title Mayor Dated: Agency: City of Poway By Signature Title Dated: Agency: Lemon Grove Sanitation District By Signature Title Page 6 of 7 Dated: Dated: Dated: Dated: Agency: City of San Diego By Signature Title Agency: County of San Diego By Signature Title Agency: Otay Water District By Signature Title Agency: Padre Dam — Municipal Water District By Signature Title Page 7 of 7 Schedule of Equipment Rates EXHIBIT ONE SCHEDULE OF EQUIPMENT RATES Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8010 Air Compressor 125 Cfm to 65 Hoses are included. hour $5.60 8011 Air Compressor 250 Cfm to 95 Hoses are included. hour $9.25 8012 Air Compressor 450 Cfm to 150 Hoses are included. hour $15.50 8013 Air Compressor 600 Cfm to 200 Hoses are included. hour $20.00 8014 Air Compressor 750 Cfm to 240 Hoses are included. hour $25.50 8015 Air Compressor 900 Cfm to 260 Hoses are included. hour $29.00 8016 Air Compressor 1200 Cfm to 325 Hoses are included. hour $41.00 8020 Air Curtain Burner In Ground to 30 In ground burner. hour $4.80 8021 Air Curtain Burner In Ground to 60 In ground burner. hour $7.40 8022 Air Curtain Burner In Ground to 90 In ground burner. hour $9.75 8023 Air Curtain Burner Above Ground to 30 Above ground burner. hour $5.80 8024 Air Curtain Burner Above Ground to 60 Above ground burner. hour $8.25 8025 Air Curtain Burner Above Ground to 90 Aboveground burner. hour $10.75 8040 Ambulance to 150 hour $13.75 8041 Ambulance to 210 hour $21.00 8060 Auger, Portable 12 In to 5 hour $0.70 8070 Automobile to 130 Mileage rate when transporting people. mile $0.30 8071 Automobile, Police to 250 This is a mileage rate. mile $0.35 8072 Automobile, Police to 250 Vehicle in a fixed position with the engine running and/or the warning lights flashing. hour $8.50 8810 Backhoe, Small See Loader-Backhoe 8820 Backhoe, Large See Hydraulic Excay. 8110 Barge, Deck 7.25'x30'x120' hour $19.00 8111 Barge, Deck 7'x45'x120' hour $28.50 8120 Barge, Hopper 12'x35'x195' This is an open barge. hour $31.00 8050 Board, Arrow, Trailer to 8 hour $1.50 8051 Board, Message, Trailer to 5 hour $5.10 8131 Boat 5'x13' to 50 Includes outboards. hour $7.20 8830 Boat to 100 Includes outboards and inboards. hour $17.00 8831 Boat to 150 Includes outboards and inboards. hour $22.00 8832 Boat to 200 Includes outboards and inboards. hour $27.00 8833 Boat to 250 Includes outboards and inboards. hour $33.00 8834 Boat to 300 Includes outboards and inboards. hour $38.00 8840 Boat, Air to 100 hour $12.00 8841 Boat, Air to 200 hour $18.00 8842 Boat, Air to 300 hour $28.00 8133 Boat, Push 16'x45' to 435 hour $76.00 8134 Boat, Push 21'x54' to 525 hour $103.00 8130 Boat, Row . This includes the oars. hour $0.55 8132 Boat, Tender 7'x14' to 75 hour $13.50 8140 Boat, Tug 16 Ft to 100 hour $16.50 8141 Boat, Tug 18 Ft to 175 hour $26.00 8142 Boat, Tug 26 Ft to 250 hour $33.00 Page 1 Schedule of Equipment Rates Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8143 Boat, Tug 40 Ft to 380 hour $81.00 8420 Breaker, Pavement to 80 hour $15.00 8421 Breaker, Pavement to 137 hour $31.00 8150 Broom, Pavement 72 In to 32 hour $6.20 8151 Broom, Pavement 84 In to 90 hour $9.75 8170 Broom, Pavement, Mtd 72 In hour $1.60 8171 Broom, Pavement, Mtd 72 In to 18 hour $2.50 8160 Broom, Pavement, Pull 84 In hour $3.30 8180 Bus to 150 hour $9.50 8181 Bus to 210 hour $14.75 8182 Bus to 300 hour $20.00 8190 Chain Saw 25 In hour $2.40 8200 Chipper 7 In to 30 hour $5.90 8201 Chipper 12 In to 65 hour $8.00 8202 Chipper 12 In to 125 hour $12.00 8203 Chipper 12 In to 171 hour $14.50 8204 Chipper 18 In to 250 hour $24.50 8205 Chipper 19 In to 350 hour $59.00 8206 Chipper 19 In to 475 hour $63.00 8207 Chipper to 650 hour $87.00 8210 Clamshell & Dragline to 128 hour $67.00 8211 Clamshell & Dragline to 250 hour $74.00 8220 Compactor to 10 Includes hand held and manually operated equipment. hour $3.20 8221 Compactor to 50 hour $6.80 8222 Compactor to 80 hour $11.25 8223 Compactor to 110 hour $15.50 8224 Compactor to 150 hour $21.00 8225 Compactor to 186 hour $25.50 8226 Compactor to 210 hour $42.00 8227 Compactor to 318 hour $70.00 8228 Compactor, Towed Drum Rate is for each drum. hour $1.00 8230 Crane, Lifting 8 Tons to 80 hour $14.50 8231 Crane, Lifting 16 Tons to 150 hour $36.00 8232 Crane, Lifting 32 Tons to 210 hour $55.00 8233 Crane, Lifting 55 Tons to 325 hour $81.00 8250 Dozer, Crawler to 70 hour $16.50 8251 Dozer, Crawler to 115 hour $21.50 8252 Dozer, Crawler to 160 hour $31.00 8253 Dozer, Crawler to 240 hour $40.00 8254 Dozer, Crawler to 310 hour $70.00 8261 Dozer, Wheel to 210 See 8260 for small wheel tractors/dozers. hour $38.00 8262 Dozer, Wheel to 310 hour $55.00 8263 Dozer, Wheel to 454 hour $89.00 8280 Excavator, Hydraulic 0.5 CY Includes truck, crawler and wheel mtd eqmt. hour $29.00 8281 Excavator, Hydraulic 1.0 CY Includes truck, crawler and wheel mtd eqmt. hour $34.00 8282 Excavator, Hydraulic 1.5 CY Includes truck, crawler and wheel mtd eqmt. hour $44.00 8283 Excavator, Hydraulic 2.0 CY Includes truck, crawler and wheel mtd eqmt. hour $57.00 Page 2 Schedule of Equipment Rates Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8284 Excavator, Hydraulic 2.5 CY Includes truck, crawler and wheel mtd eqmt. hour $73.00 8300 Fork Lift "4000 Lbs to 50 hour $4.50 8301 Fork Lift 11000 Lbs to 100 hour $8.25 8310 Generator 5 KW to 11 hour $1.20 8311 Generator 15 KW to 30 hour $3.00 8312 Generator 40 KW to 57 hour $6.00 8313 Generator 65 KW to 92 hour $10.25 8314 Generator 110 KW to 160 hour $15.50 8315 Generator 125 KW to 200 hour $22.00 8316 Generator 270 KW to 390 hour $26.50 8317 Generator 400 KW to 570 hour $38.00 8318 Generator 500 KW to 715 hour $56.00 8319 Generator 750 KW to 1050 hour $75.00 8320 Golf Cart 2 Person hour $1.80 8330 Grader 10' Blade to 100 Includes rigid and articulated equipment. hour $15.00 8331 Grader 12' Blade to 140 Includes rigid and articulated equipment. hour $25.00 8332 Grader 12' Blade to 200 Includes rigid and articulated equipment. hour $31.00 8350 Hose 3 In Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.05 8351 Hose 41n Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.10 8352 Hose 6 In Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.15 8353 Hose 8 In Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.20 8354 Hose 12 In Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.35 8355 Hose 16 In Discharge hoses for pumps. Suction hoses are included with pumps. hour $0.75 8360 Jackhammer Hoses between air compressor and jackhammer are included in rate of air compressor. hour $0.60 8370 Lift, Scissor 1500 Lbs to 20 hour $4.70 8380 Loader, Crawler 0.5 CY to 32 hour $7.75 8381 Loader, Crawler 1.0 CY to 70 hour $14.00 8382 Loader, Crawler 1.5 CY to 90 hour $17.50 8383 Loader, Crawler 2.0 CY to 120 hour $26.00 Page 3 r Schedule of Equipment Rates Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8384 Loader, Crawler 2.5 CY to 150 hour $35.00 8385 Loader, Crawler ., 3.0 CY to 170 hour $40.00 8540 Loader, Skid 1000 Lbs to 27 hour $4.90 8541 Loader, Skid 2000 Lbs to 73 hour $7.40 8542 Loader, Skid 4000 Lbs to 94 hour $15.50 8390 Loader, Wheel 0.75 CY to 63 hour $7.30 8391 Loader, Wheel 1.0 CY to 74 hour $9.75 8392 Loader, Wheel 1.5 CY to 75 hour $15.00 8393 Loader, Wheel 2.0 CY to 115 hour $18.00 8394 Loader, Wheel 2.5 CY to 144 hour $20.50 8395 Loader, Wheel 3.0 CY to 160 hour $25.00 8396 Loader, Wheel 3.5 CY to 196 hour $29.50 8397 Loader, Wheel 4.0 CY to 248 hour $36.00 8570 Loader-Backhoe, Wheel 1.03 CY to 74 Capacity is the loader bucket and not the backhoe bucket. hour $10.00 8571 Loader-Backhoe, Wheel 1.5 CY to 95 Capacity is the loader bucket and not the backhoe bucket. hour $14.50 8572 Loader-Backhoe, Wheel 1.75 CY to 115 Capacity is the loader bucket and not the backhoe bucket. hour $19.00 8410 Mixer, Concrete, Port 6 CF to 7 hour $1.50 8411 Mixer, Concrete, Port 12 CF to 9 hour $2.10 8400 Mixer, Trailer Mounted 6 CF to 18 hour $3.80 8401 Mixer, Trailer Mounted 16 CF to 25 hour $7.50 8632 Mulcher, Trailer Mtd to 35 hour $4.80 8430 Paver, Asphalt 8 Ft to 35 Includes wheel and crawler equipment. hour $8.50 8431 Paver, Asphalt 8 Ft to 71 Includes wheel and crawler equipment. hour $19.50 8432 Paver, Asphalt 10 Ft to 130 Included wheel and crawler equipment. hour $49.00 8433 Paver, Asphalt 10 Ft to 200 Includes wheel and crawler equipment. hour $65.00 8434 Paver, Asphalt 10 Ft to 234 Includes wheel and crawler equipment. hour $80.00 8450 Plow, Grader Mtd 10.5 Ft hour $6.90 8440 Plow, Truck Mtd hour $3.60 8470 Pump 2 In to 8 hour $2.10 8471 Pump 3 In to 12 hour $2.80 8472 Pump 4 In to 30 hour $6.00 8473 Pump 6 In to 60 hour $8.50 8474 Pump 8 In to 70 hour $12.75 8475 Pump 10 In to 85 hour $15.00 8476 Pump 12 In to 90 hour $17.50 8463 Pump Extender 20 Ft Extender for a Pump W/O Power hour $0.80 8460 Pump, W/0 Power 6 In hour $1.50 8461 Pump, W/0 Power 12 In hour $2.00 8462 Pump, W/0 Power 24 In hour $4.70 8510 Saw, Concrete 14 In to 20 hour $2.40 8511 Saw, Concrete 26 In to 35 hour $5.70 8512 Saw, Concrete 36 In to 65 hour $9.25 8520 Scraper 11 CY to 180 hour $47.00 Page 4 Schedule of Equipment Rates Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8521 Scraper 21 CY to 330 hour $70.00 8522 Scraper 31 CY to 450 hour $102.00 8560 Snow Blower to 472 hour $56.00 8561 Snow Blower to 500 hour $60.00 8562 Snow Blower to 600 hour $68.00 8550 Snow Blower, Trk Mtd to 30 hour $7.10 8551 Snow Blower, Trk Mtd to 66 hour $12.75 8552 Snow Blower, Trk Mtd to 200 hour $21.00 8553 Snow Blower, Trk Mtd to 340 hour $31.00 8554 Snow Blower, Trk Mtd to 400 hour $34.00 8630 Sprayer, Seed, Trailer 500 Gal to 20 hour $4.80 8631 Sprayer, Seed, Trailer 1000 Gal to 35 hour $7.50 8423 Spreader, Chip 12.5 Ft to 152 hour $26.00 8424 Spreader, Chip 14.5 Ft to 210 hour $26.50 8425 Spreader, Chip, Mtd 8 Ft to 7 hour $1.20 8426 Stripper 12 Gal to 10 hour $1.40 8427 Sweeper, Pavement to 109 hour $22.00 8428 Sweeper, Pavement to 160 hour $29.00 8429 Sweeper, Pavement to 190 hour $35.00 8260 Tractor, Wheel to 87 hour $6.60 8580 Trailer, Asphalt Dist 1000 Gal hour $6.20 8590 Trailer, Dump 18 CY hour $6.60 8591 Trailer, Dump 24 CY hour $10.25 8600 Trailer, Equipment 20 Tons hour $3.20 8601 Trailer, Equipment 40 Tons hour $7.50 8602 Trailer, Equipment 50 Tons hour $8.50 8640 Trailer, Office 8 ' x 24 ' Based on a daily rate. day $10.75 8641 Trailer, Office 8 ' x 32 ' Based on a daily rate. day $12.75 8610 Trailer, Water 3000 Gal hour $10.00 8611 Trailer, Water 6000 Gal hour $12.75 8612 Trailer, Water 9000 Gal hour $14.75 8613 Trailer, Water 12000 Gal hour $16.50 8650 Trencher to 35 hour $3.80 8651 Trencher to 85 hour $15.50 8652 Trencher to 115 hour $31.00 8653 Trencher to 175 hour $49.00 8290 Trowel, Concrete 46 In to 8 hour $1.40 8710 Truck, Bucket 30 Ft to 150 hour $12.50 8711 Truck, Bucket 60 Ft to 210 hour $26.00 8712 Truck, Cleaning 5 CY to 150 hour $19.00 8713 Truck, Cleaning 14 CY to 210 hour $28.50 8680 Truck, Concrete 8 CY to 235 hour $39.00 8681 Truck, Concrete 12 CY to 285 hour $43.00 8720 Truck, Dump 8 CY to 180 hour $14.25 8721 Truck, Dump 10 CY to 235 hour $22.00 8722 Truck, Dump 12 CY to 255 hour $26.00 8723 Truck, Dump 18 CY to 325 hour $32.00 8690 Truck, Fire to 200 hour $24.50 8691 Truck, Fire to 300 hour $35.00 8692 Truck, Fire to 400 hour $45.00 8700 Truck, Flatbed 6000 Lbs to 140 hour $8.75 8701 Truck, Flatbed 15000 Lbs to 210 hour $11.25 8702 Truck, Flatbed 25000 Lbs to 210 hour $13.75 8730 Truck, Garbage 25 CY to 255 hour $26.00 8731 Truck, Garbage 32 CY to 325 hour $32.00 Page 5 Schedule of Equipment Rates Cost Code Equipment Capacity/ Size HP Assumption Unit Hourly Rate 8714 Truck, Line to 150 hour $26.00 8715 Truck, Line to 210 hour $31.00 8803 Truck, Pick up 0.50 Ton to 130 Mileage rate for transporting people. If vehicle was for hauling, etc. use hourly rate. mile $0.30 8800 Truck, Pick-up 0.50 Ton to 130 hour $5.60 8801 Truck, Pick-up 0.75 Ton to 130 hour $6.30 8802 Truck, Pick-up 1.00 Ton to 180 hour $7.50 8790 Truck, Tractor 30000 Lbs to 210 hour $18.50 8791 Truck, Tractor 35000 Lbs to 265 hour $23.50 8792 Truck, Tractor 50000 Lbs to 310 hour $26.00 8780 Truck, Water 2000 Gal to 175 hour $16.00 8781 Truck, Water 3500 Gal to 250 hour $19.00 8620 Tub Grinder to 425 hour $46.00 8621 Tub Grinder to 450 hour $63.00 8622 Tub Grinder to 550 hour $81.00 8623 Tub Grinder to 650 hour $102.00 8624 Tub Grinder to 800 hour $129.00 8625 Tub Grinder to 1000 hour $147.00 8321 Vehicle, Recreational to 10 Rate can be used for utility vehicles. hour $1.80 8750 Vehicle, Small to 30 hour $3.40 8761 Vibrator, Concrete to 8 hour $1.20 8770 Welder 200 Amp to 16 hour $1.90 8771 Welder 300 Amp to 34 hour $3.90 8772 Welder 400 Amp to 50 hour $5.60 Paee 6 C wo I'O .JIEETING DATE City of National City, California COUNCIL AGENDA STATEMENT OctnhRr 7, 9003 AGENDA ITEM NO. 9 7-ITEM TITLE A RESOLUTION OF THE CITY OF NATIONAL CITY AUTHORIZING THE DIRECTOR OF PUBLIC WORKS/ENGINEERING TO ENTER INTO A MUTUAL AID AGREEMENT WITH SAN DIEGO COUNTY PUBLIC WASTEWATER AGENCIES TO PROVIDE MUTUAL ASSISTANCE DURING A WASTEWATER EMERGENCY PREPARED BY Joe Smith DEPARTMENT Public Works/Engineering 336-4580 EXPLANATION Currently, National City does not have an agreement with any other City to provide mutual aid should National City be faced with a wastewater emergency beyond the capability of our immediate personnel, equipment, or supplies, and where such assistance would be helpful in resolving such emergency in a timely manner. This Mutual Aid Agreement provides the means to receive such assistance. This Mutual Aid Agreement has been developed through, and approved by the Metro Wastewater Joint Powers Authority. It outlines the general nature of how the assistance will be provided. This Agreement will help to provide for a coordinated effort by trained personnel, so that all necessary actions can be taken to help facilitate a timely and technically correct response to any wastewater emergency. This Agreement will be a useful tool in the event of a sewer emergency. CEnvironmental Review N/A Financial Statement N/A Approved By: Finance Director Account No. STAFF RECOMMENDATION Adopt the resolution authorizing the Director of Public Works/Engineering to enter the agreement. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) 1. Resolution 2. Agreement Resolution No. 2003-144 A-200 9 99) RESOLUTION NO. 2003 — 144 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE ACTING DIRECTOR OF PUBLIC WORKS/ENGINEERING TO ENTER INTO AN AGREEMENT WITH SAN DIEGO COUNTY PUBLIC WASTEWATER AGENCIES TO PROVIDE MUTUAL ASSISTANCE DURING A WASTEWATER EMERGENCY WHEREAS, National City currently does not have an agreement with any other city to provide mutual aid should National City be faced with a wastewater emergency beyond the capability of our immediate personnel, equipment or supplies, and where such assistance would be helpful in resolving such emergency in a timely manner; and WHEREAS, a Mutual Aid Agreement has been developed through, and approved by, the Metro Wastewater Joint Powers Authority that will provide for a coordinated effort by trained personnel to facilitate a timely and technically correct response to any wastewater emergency. NOW, THEREFORE, BE IT RESOLVED that the City Council of the, City of National City hereby authorizes the Acting Director of Public Works/Engineering to enter into an agreement with San Diego County public wastewater agencies to provide mutual assistance during a wastewater emergency. Said agreement is on file in the office of the City Clerk. PASSED and ADOPTED this 7th day of October, 2003. Nic Inzu ,,� ATTEST: Michel R. Da Ia, !iity Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on October 7, 2003, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California ti City -Clerk of the City 1f National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2003-144 of the City of National City, California, passed and adopted by the .Council of said City on October 7, 2003. City Clerk of the City of National City, California By: Deputy