Loading...
HomeMy WebLinkAbout2003 CON CDC Famania Construction - Amendment KimballAMENDMENT TO AGREEMENT This Amendment to Agreement is made and entered into this 2"d day of October, 2003, by and between the Community Development Commission of the City of National City, a community development commission, hereinafter referred to as the "CDC", and Famania Construction, Inc. hereinafter referred to as "Famania". RECITALS A. CDC and the Famania entered into a Contractual Agreement ("the Agreement") on July 15, 2003 for the repair of the Frank Kimball House. B. CDC and Famania desire to approve an amendment to the agreement to provide an additional $14,765.22 in additional funds for additional repairs as outline in Exhibits "A, B and C", including fumigation and exterior stair repairs. NOW, THEREFORE, the parties mutually agree that the Agreement is amended to provide that the CDC will provide an additional $14,765.22 in funds for additional repairs to be performed by Famania, as outlined in Exhibits "A, B and C". With the foregoing exceptions, each and every provision of the Agreement dated July 15, 2003 shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this Amendment to this Agreement of the date and year first above written. CO LOPMENT COMMISSION ATIONAL CITY Paul •esr•Vef .' Executive Director APPRODAS • • RM: r� FAMANIA CONSTRUCTION, INC. car a .• , President APPROVED AS TO FORM: Y.tt Nick Inzunza, Chairman George H.'ser, III, CDC/City Attomey AT ORIGINAL Famania Construction, Inc. General Contractor CSCL#558687 3241 Olive Street National City, Ca. 91950 Ph# 267-3440 Fax# 267-3680 Cost Proposal #1 09/22/2003 Project Frank Kimball House Exterior Treatments Owner City OF National City Architect Wayne Milford Donaldson Architect Spec. No. 03-005 CIP No. 900005 Type of Work Stair Wood Replacement Upon acceptance of work we are hearby authorized to make the following changes in our work on the above caption project, it is being understood that this change be executed under the terms and conditions of our contract Description of work: Front stairs: remove and replace 20 ea. balisters, remove rotted wood @ stringers & fill w/ abitron. South stairs: remove and replace post column base w/ retrofit type on existing concrete. North stairs: remove & replace 10 ea. balisters, & 1 ea. deck board, remove rotted wood @ stringer & @ balister base 2x4 and fill with abitron. Rear stairs: remove & replace entire lowest section of stair except reuse treads, @ middle section remove & replace left side stringer & 10 balisters reuse all existing lumber & treads, @ middle & top sections remove rotted wood and fill with abriton, @ (2) full hieght 4x4 post, cut bottom 6" and add raised concrete footing over existing w/ (2) new CB44 post base. Upper front porch railing: remove & replace north side railing completely to match existing, also replace skirts & deck to rail blocking. Note: This proposal only covers work described above and nothing more. Painting Subcontractor 1 Materials-abitron $300.00 2 Labor -Painter @ 7 MHS x $40.38 Hr. (INCLUDES LABOR BURDEN) $282.66 3 20% P&0 $116.53 4 Subtotal $699.19 General Contractor 4 Materials -lumber, concrete, & hardware $745.00 5 Dump fees $100.00 6 Labor•Carpenter @ 96 MHS x $35.76 Hr. (INCLUDES LABOR BURDEN) $3,432.96 7 Subtotal $4,977.15 8 General Liability Insurance-2% $99.54 9 Subtotal $5,076.70 10 GC 20% P&O $1,015.34 11 Subtotal $6,092.03 12 Bond Premium 2.5% $152.30 13 Total $6,244.33 Contract time will be increased by -5- work days beyond any day set forth. Accepted By: Xavier Velasco, Housing Coorinador/Project Manager Community Development Commision of National City Page 1 EXHIBIT "A" Famania Construction, Inc. General Contractor CSCL#558687 3241 Olive Street National City, Ca. 91950 Ph# 267.3440 Fax# 267-3680 Cost Proposal #2 09/30/2003 Project Frank Kimball House Exterior Treatments Owner City OF National City Architect Wayne Milford Donaldson Architect Spec. No. 03-005 CIP No. 900005 Type of Work Various repairs Upon acceptance of work we are hearby authorized to make the following changes in our work on the above caption project, it is being understood that this change be executed under the terms and conditions of our contract Description of work: Quarter round wood trim: remove and replace approx. 30 LF Threshold repairs: repair @ (2) doors with arbitron as directed by architect. Fascia repairs: remove rotten wood and fill with abitron approx. 7 If. Corbels, capitols, & trim: repair (3) loose and falling pieces back to original condition. Painting Subcontractor 1 Materials-l-gal. Abatron, & 30 If qtr. Rd. $528.00 2 Equipment rental -high reach lift 5 days @ $170 per day $850.00 3 Labor -Painter @ 38.5 MHS x $48.00 Hr. (INCLUDES LABOR BURDEN) $1,848.00 4 22% P&0 $709.72 5 Subtotal $3,935.72 General Contractor 6 Materials $0.00 7 Labor -Carpenter @ 0 MHS x $35.76 Hr. (INCLUDES LABOR BURDEN) $0.00 8 Subtotal $3,935.72 9 General Liability Insurance-2% $78.71 10 Subtotal $4,014.43 11 GC 20% P&0 $802.89 12 Subtotal $4,817.32 13 Bond Premium 2.5% $120.43 14 Total $4,937.75 Contract time will be increased by -5- work days beyond any day set forth. Accepted By: Xavier Velasco, Housing Coorinador/Project Manager Community Development Commision of National City Page 1 EXHIBIT "B" Famania Construction, Inc. General Contractor CSCL#558687 3241 Olive Street National City, Ca. 91950 Ph# 267-3440 Fax# 267-3680 Cost Proposal #3 10/01/2003 Project Frank Kimball House Exterior Treatments Owner City OF National City Architect Wayne Milford Donaldson Architect Spec. No. 03-005 CIP No. 900005 Type of Work Termite Fumigation Upon acceptance of work we are hearby authorized to make the following changes in our work on the above caption project, it is being understood that this change be executed under the terms and conditions of our contract Description of work: Termite fumigation and repairs per AA same day exterminators proposal dated 9/20/03. Fumigation Subcontractor 1 Lump Sum $2,856.00 General Contractor 2 Materials $0.00 3 Labor -Carpenter @ 0 MHS x $35.76 Hr. (INCLUDES LABOR BURDEN) $0.00 4 Subtotal $2,856.00 5 General Liability Insurance.2%, $57.12 6 Subtotal $2,913,12 7 GC 20% P&0 $582.62 8 Subtotal $3,495.74 9 Bond Premium 2.5% $87.39 10 Total ( $3,583.14 Contract time will be increased by -3- work days beyond any day set forth. Accepted By: Xavier Velasco, Housing Coorinador/Project Manager Community Development Commision of National City Page 1 EXHIBIT "C" Chairman Nick inzunza Members Ron Morrison Louie Natividad Frank Parra Fideles Ungab Executive Director Paul Desrochers Pt eserving Hictory. Shaping the Future Cor nnunity Development Commission of National City October 23, 2003 Oscar Famania Famania Construction 3241 Olive Street National City CA 91950 RE: Amendment to Agreement between CDC and Famania Construction Dear Mr. Famania; Enclosed is your fully executed original of the above -referenced agreement for your records. Should you have any question, please contact our office at your earliest convenience. Respectfully, is Valdez Executive Assistant 140 E. 12rh Street, Suite B; National City, California 91950 Tel.: (619) 336.4250 Fax: (619) 336.4286