HomeMy WebLinkAbout2003 CON CDC Famania Construction - 3rd Amendment KimballTHIRD AMENDMENT TO AGREEMENT
This third Amendment to Agreement is made and entered into this 10nd day of
November, 2003, by and between the Community Development Commission of
the City of National City, a community development commission, hereinafter
referred to as the "CDC", and Famania Construction, Inc. hereinafter referred to
as "Famania".
RECITALS
A. CDC and the Famania entered into a Contractual Agreement ("the
Agreement") on July 15, 2003 for the repair of the Frank Kimball House.
B. CDC and Famania desire to approve an amendment to the agreement to
provide an additional $627.80 in additional funds for the washing of the
exterior of the building, which was made necessary from the recent away
forest fires and the subsequent accumulation of ash on the building, as
outline in Exhibits "E".
NOW, THEREFORE, the parties mutually agree that the Agreement is amended
to provide that the CDC will provide an additional $627.80 in funds for additional
repairs to be performed by Famania, as outlined in Exhibits "E".
With the foregoing exceptions, each and every provision of the Agreement dated
July 15, 2003 shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment to
this Agreement of the date and year first above written.
COMMUNITY !ram• LOPMENT COMMISSION
OF THE sj►' OF ,, r TIONAL CITY
A;;j.A_
'ul Desroche�� ecu ive Director
APPROVED AS TO FORM:
George H. Eiser, III,
CDC/City Attomey
FAMANIA CONSTRUCTION, INC.
ORIGINAL
amania Construction, Inc.
General Contractor CSCI.#S58687
3241 Olive Street National City, Ca. 91950
Phil 267-3440 Fax# 267-3680
Cost Proposal #5(revised)
11/1012003
Project Frank Kimball House Exterior Treatments
Owner City OF National City
Architect Wayne Milford Donaldson Architect
Spec. No. 03-005
CIP No. 900005
Type of Work Building Wash
Upon acceptance of work we are hearby authorized to make the following changes in our work on
the above caption project, it is being understood that this change be executed under the
terms and conditions of our contract
Description of work:
Upper front porch railing:
1. Provide dry film testing for primer caots as outlined in our contract.
2. Provide complete washing down of building due to ash build up fro recent fires.
Note: This proposal only covers work described above and nothing more.
Subcontractor Contractor
$417.00
$83.40
$500.40
$10.01
$510.41
$102.08
$612.49
$15.31
1 Building Wash Down
2 Subcontractors 20% P&O
General Contractor
3 Subtotal
4 General Liability Insurance-2%
5 Subtotal
6 GC 20% P&O
7 Subtotal
8 Bond Premium 2.5%
9 Total
$627.80
Contract time wi r by yonn any day set forth.
�dg
Accepted By: �� // //4o B3
Xavier Vela o sing moo nad roJect Manager
Development Commision of National City