HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #1 Fire Station #34CHANGE ORDER C/O Number: 1 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: May 10, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Provide additional abatement of floor mastic materials found to contain Asbestos in the Fire Station building $12,660 2. Modifications for SDG&E point of connection as outlined in Jeff Katz Proposal Request No. 001 Dated March 1, 2004 .... ($1,448) 3. Clarifications for Sweetwater Utility work as outlined in JKA PR 002 dated March 1, 2004 $0 4. Portion of Sweetwater Authority fees now being performed by Sweetwater. As outlined and submitted in M+H Builders C. O. R. # 005 dated May 5, 2004 ($16,452) REASON FOR CHANGE: 1. Hazardous conditions. 2. SDG&E shop drawings deviated from bid set drawings 3. Define scope of work being performed by Sweetwater Authority 4. Define scope of work being performed by Sweetwater Authority COST RECONCILIATION: Costs were reviewed by the architect and City and negotiated to the satisfaction of the City. Construction Contract Accounting Summary: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $0 The Contract Amount prior to this Change Orders $6,974,585 With this Change Order request the Contract cost is decreased by ($5,240) New Contract Amount $6,969,345 Change in Contract Time: 0 days Contract Completion Date: Recommended for Approval by: CO i STRUCI ION MANAGER / R&S ARUI ITECT / jeff Katz hitecture Approved by: CONTRACTOR/ Marcofte and,earne Build OWNER/ City 0 tional City `4--rti7.4 tv,704 DATE DATE DATE DATE Distribution: City Of National City (original w/all documentation)/MH Builders (copy w/all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) Jeff Katz Architecture (copy w/a11 documentation) ��OGapORATBL eB0 RUDOLPHASLETTEN GENERAL AND ENGINEERING CONTRACTORS March 19, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject: M+H COR #1 — Additional Abatement at Carpeted Areas of Fire Station Steve: This letter is to transmit our review comments on the subject change order faxed March 17, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with handling containing and removal of asbestos containing material found under VCT in carpeted areas of the Fire Station. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted amount of $12,660. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at hnmills(airscont.com. Sincerely, Rudolph and Slette``n, Inc. 14 4 Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 1 file OK_ RUDOLPH AND SLETL'EN, INC. 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DIEGO, CALIFORNLA 92130 TEL. 858.259.6262 FAX. 858.259.8282 MARCOTTE HEARNE BUILDERS, INC. March 15, 2004 Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE National City Fire Station #34 - Marcotte & Heame Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No, 001 Dear Sir: The contract adjustment required as a result of: Additional abatement required for VCT discovered under existing carpet. Change Order Request No. 001 is $12,660 Atok The incorporation of this revision into the contractual scope of work will ays re uire >k/ ed in our current schedule, The job schedule will be adjusted accordingly to show the effect of th s workingdrevision onnotcludthe final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance, We HAVE proceeded with this revised work. Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Very truly y rs, Quotation Accepted By: Wayne Powderly / Representi 1t /it , Project Manager Date: 3 4(i— CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 658.793.4101 Fax:858-793-4102 Via Facsimile � . '3117104 L I/ Al,a err arse C. (3rAGl[ l c Q, /AP TT/Td WdLz:SO 1700E LT °aeW z6T1726L: ON Xdd ONI selacima 31•1639H 2110D 3W: WOaad vvvD/4LI6V DATE: COMPANY: ATTENTION: PAX NO, SAN OTEGO 1830 ailh>.pis Wq El G41en. CA PEoa.J (619)1062-7T30 046) 400-9353 (629) 563-77$t I'AX pownr.:unsr-reehAel MUMMER OF PAGES (D3CLUblNa OMR MET): L ) PLEASE REPLY ( ) CONFIRM RECEIPT ( ) CALL IF YOU WAY! QUESTIONS ( ) No RESPONSE REQUIRED ( ) URSENT REOARDIN6s COMMENTS: arkvicloti or softy wood 6120,. IV i • ?ren+etrY end/ar Is_p, Prioshg.d Mbs«rsNes Waded erdir for Mhs woe •f n■ dl goworo. or di:P f6m m of IN. Hi. molar M sr of this ;Mows P sar ,h. Mnnrds4 r cI$mrr. Mru srs b+s& msifwe lbbr aeg ____, lasss.ds.fies is sera% prase srurefaestlfr s it+fY ,ba a.rrtler by sroioissRpssi "1 r.Aou rs s*arJr rnI iree. xI re hspi recic 1 ,bls *Thiel for Tbs runes. of I frylnlM, Thi * r„ oorPOrsea ogles giy Ares Lae Vegas Ler VW) (11394100 i 9(714) 929.4040 (510) M.6910 ) 7Q0,6q� (916)614790800) 400 363 (833400.8853 02) 920.7840-(a 9377(916) 314 29� Ew(7490p4gy0ax 5101 Z�55104rt (613 TTi2d WdLE:SO POOE LT 'aeN EOTbSEL: 'ON XFJd ONI seiDairnE dNNUEH 31103e1UW: Wa{d .boolj [sLZs ON xa/x1] a:LL a aooZ/LL/co FROM IMARCOTTE HEARNE BUILDERS INC FRX NO./7934102 National City Fire Station #34 Marcotte + Hearne Builders Inc. Subcontractor Change Order Break Down Analysis Mar. 16 2004 05147PM P2 Unit Coat Materiels: DeSeMption QTY (incl. Tex Total Item 1. .. ii27AGtyaL. 3f344 Rem Item 3 Item 4 Itom 5 aUBTOTAL "A" CITY - Unit Cot Equipment Description HOURS (Incl. Tax) Tottll Item 1 ek E12p Item z Item 3 adiripSA4., Item 4 Item 5 "''1 Labor class Type Claea Type Class Type Class Type SUBTOTAL "IV Prev. Wage _78 2g Rate0441411.1. Total 49 _ j9,ta. SUBTOTAL"C" .fr)Ecommercical General Liability and Property Damage Ineuranca Workers Compensation Insurance Social Security and Unemployment Taxes SUBTOTAL"D" SUBTOTAL ArB'+C,D 1 Subcontractor Mark Up 15% 1S57 Total Soboontroator Change OrderrW Rsk1 los, deet44ti►w. 441(1,. 0+4. IT/t'd WdS :S0 b00Z LT 'aeW ZOT1'2BL: °ON Xdd ONI saaalInaONati2H a110Ja1W: WOad 800E [OLZ9 ON x1/H1] LZ:LL 03 00Z/Ll/C0 Materials Worksheet Natrlonai City Fire Station Rode Qtr, Ouse au Job Name: Iftiv.1044 .09 �Nt Pdc9 Fa Olt Total Mall 1 A100 9 Adhesive Spray Each $6.24 $66.18 2 A101 5 Air Monitoring Cassettes Each $3.66 $18.30 3 A102 Blades Floor 3' Slick Each $9,00 $0.00 4 A103 Blades Floor 4" Razor Each $0.84 $0.00 6 A104 20 Blades Floor 8' Razor Each $2.44 $48.80 6 A105 Blades Roof 8' Each $2.70 $0.00 7 A106 4 Blades, Utility Knives Each $0,29 $1.18 8 A107 - Brushes, Tooth Each $1.87 $0,00 9 A198 4 Brushes, Wirelong Handle Each $3.25 $13.00 10 A109 10 Hearing Protection Each $0.49 $4.90 11 A110 26 Coveralls, full body with hood Each $3.35 $93.80 12 A111 2 Danger Signs (English) Each $0.75 $1.50 19 A112 2 Danger Signs (Spanish) Each $0.85 $1.70 14 A113 Danger Stickers Each $0.36 $0.00 15 A114 1 Danger Tape - Yellow Roll $26.00 $26.00 16 A115 4 Glasses, Safety Each S8.6S $34.80 17 A118 16 Gloves, Cotton White Pair $1.70 127.20 18 A117 4 Gloves. Leather Pair $4-78 $19.12 19 A118 24 Gloves, Rubber Yellow Pair $1.65 $39.80 A119 2 Goggles, Safety Each $5,20 $10.40 A120 2 Knives, Carpet Each $5.80 $13.60 22 A121 . 4 Knives, Witty Each 54.40 $17.60 23 A122 10 Quicksorb Lb. $0.35 $3.50 24 M23 35 Rags, Mused Lb. $1.65 $57.75 26 A124 Rain Suk (medium) Each $21.00 $0.00 26 A125 Rain Sult (large) Each $25.00 $0.00 27 A128 20 Respirator Wipes Each $0.20 $4.00 28 A127 1 Shampoo Each $7.75 $7,75 29 A128 30 Shower Towels Each $0.40 $12.00 30 A129 1 Staples 3/8' Box $4.01 $44.01 31 A190 Tape, Duct 2" (red) Each $7A0 $0.00 32 A131 16 Tape, Duct 2" (silver) Each $5.85 $93.60 33 A132 Tape, Duct 3' silver Roll $7,95 $0.00 A133 Ta•e, Painters (blue) Roll $13.00 $0.00 A134 tight Bulbs, Halogen Each $11.00 $0.00 A137 Btades Floor 2' Slick Each $16.00 $0.00 A201 Encapsulant (22P Powerlock) Gallon $16.00 $112.00 A204 Mastic Remover 747 Galion $26.00 $910.00 39 A206 Mastic Remover 787 Gallon $35,00 $0.00 40 A206 Mastic Remover Erty. Gallon $22.00 $0.00 IT/Sd Wd8E:SO 1700E LT 'apW Zati17£6L : ' ON Xdd ON I SHarl I ng RN?IUDH 21100211:1W : W0?Jd 900!I [839 ON xalxi.] LZ:LI 03 oOZ/LL/C0 uUR p1[pe 'Winn hotel Ptice M. 61NIv NMI vvvMummwu 41 A206 2 Surfactant (5gal/Ctn) r.ontaine $13.00 $26.00 42 A209 Duct Encapsulant/Lagkote Gallon $80.00 $0.00 43 A211 Mastic Remover 31SX-90 ( 9 '/ in) :.ontetne 538.00 $0.00 44 A300 3 Filters, Negative Alr #1 PRE Each $1.30 $3.90 45 A301 3 Fitters, Negative Air #2 PLT Each $7,50 $22.50 46 A302 3 Filters, Negative Air #3 Wire Each $7.80 $23.40 47 A303 Miters, Noah 1/2 Combo Each $11,00 $0.00 48 A304 24 Filters, North 112 Reap Each $5.25 $126,00 49 A306 Filters, Racal#SP-3 PAPR Each $10.00 $0.00 50 A306 2 Fitters, Showr 100MIC (green) Each $6,40 $12.80 51 A307 1 Filters, Showr 25MIC (blue) Each $6A0 $6.40 52 A308 1 Filters, Show( WIC (white) Each $7.25 $7.25 63 A309 2 Filters, Showr 50MIC (yellow) Each $6.00 $12.00 54 A310 3 HEPA Vacuum Bags Upright Each $8.00 $24.00 55 A311 HEPA Vacuum Bags Shoulder Each $8.00 $0.00 56 A312 Pads, Buffing 17" Each $23.70 $0,00 57 A313 3 Pads, Huffing 20" Each $36.00 $108.00 58 A314 6 Pads, Hand Doodle Bug Each $3.50 $21.00 59 A400 220 ems, Clear 3000 6MIL Each $1.16 $253.00 60 A401 Bags/Non.Haz 30x40 6MIL Each $0.95 $0.00 61 A403 48 Beg*PA" 30x40 6MIL , Each $1.45 $69.80 63 A407 0 Flex Duct12"x25' Each $40.00 $0'00 64 A408 2 Flex Duct 145c25' Each $45,00 $90.00 66 A408 Glove Bags 44x60 (horiz) Each $16.10 $0.00 65 A410 Glove Bags 44x60 (avert) Each $17.30 80.00 67 A411 Poly 10x100 4MIL F/R Roll $55.00 60.00 66 A412 Glove gags 80x80 6MIL Each $15.00 $0.00 69 A413 1 Poly 20x100 eMiL Roll $66.00 $66.00 70 A414 Poly 20x100 4MIL F!R Roll $80,00 $0.00 71 A415 Poly 20x100 4MIL (black) Roll $46.00 $0,00 72 A416 1 Poi 20x100 6MIL Roll $76.00 $76.00 73 A417 Poly 20x100 6MIL FIR Roll $133.00 $0.00 74 A418 Poly 20x100 6MIL (black) Roll $81.00 $0.00 75 A419 Poly 8x100 4MIL Roll $46.00 • $0.00 76 A420 Poly Bx100 4MIL Fin Rott $76_00 $0.00 77 A421 Poly 8400 2MIL Roll $34,00 $0.00 78 A425 Poly 10x100 4MIL boll $57.00 $0.00 79 A426 Poly 20x100 6MIL Reinforced Roll $239.00 $0.00 660 4 1/2 Face Respirrator Each $29,75 $119.00 81 3" Angle Scraper Each $6,90 $0,00 52 4 Floor Scraper (large 6 Each $9,85 $3940 83 Ceiling Scraper (small 31 Each $8,80 $0.00 84 Claw Hammer Each $7.35 $0.00 85 Crow Bar 18" Each $9.00 $6.00 80 Crow Bar 36" Each $11.20 $0,00 97 d Crow Foot Each $a.a0 $0.00 ST/9d Wd8Z:S0 1700Z LT '-rekl Z0Tb26L: '8N Xdd JNI Sadaiina 2N2:1H3H 311.0jadW: WOad FROM :MRRCOTTE HERRNE BUILDERS INC FAX NO. :7934102 Mar. 17 2004 05:29PM P7/11 09'i66`£$ :11,10i 00'0$ 601. oo'O$ 804 0D'06 LOL OD'O$ Q01E6 1108 soolnJnoa 904 00'05 owns AO Augpal pue Pool'mai urea Jed 904 00'05 YUL 00-0t 0011.$ (APO Amu%06-lues tot OTOS Ran uolliJ Aces i191QoJ0lW-que sibev Z0l 00764$ 007.64$ Uaa9 Ja1lId dd3H l 401. 00' .9ES 00'24t uou 6uIJ *101 pue pip uollee 9Q JAa 'Sutruc 6 004 QZ 6PS 03'9$ 4aa3 ingidoeN 71ae19'ma1e 9 66 00'01 0012$ Rain IeeS Puoil 86 00'0$ 00'0E6 Pa Aden 86 WW1 00'3S Jed 8 J99n>rl z 96 oo'OS sz-4$ Irma wool) eglnewan P6 00'0$ curl LS filed spedaau){ E6 00'01 tL'9$ tiaras !aH WaH Z6 00'0$ 00'0$ 110e3 (paPnlauJ 101 AM L9.1!d L 46 0o'0$ 00.0E 4Pu3 " ' ' — (prpnpu!) aiivam8ul1x3 aJ!d l 06 0013 00'ZI.l woos (u 0g) pua'3 uolsuatx3 59 00'0$ s9'£4S Lp (eituls) s l6ri doia 99 =lid 0101 iid11 111111 us Nem slum. 03/17/2004 D 17:27 [TX/RX NO 62181 2j 007 soots Lsts ON xarxl] L :LI 0 I0oz/tG/so Equipment, Testing, and Disposal Worksheet Job Norm: National city fire stn OLv. duucrititlau Rev. 10-24.03 Ma # oJUnite Peke Per Udt Total Prude 1 Air Sampling Pump, Personal Day $40.00 $0.00 2 Airless, Electric Day $75.00 $0.00 3 Airless, Gas Day $75.00 $0.00 4 Bench Day $16.00 $0.00 5 Broom, Hausa Day $5.00 $0.00 6 Broom, Shop Day $7.00 $0.00 7 0 Buffing Machine 17' Day 0 $87.00 $0.00 8 2 Buffing Machine20' Day 2 $109.00 $436.00 9 Chiaal,1' Day $14.00 $0.00 10 Chisel, 3° Day $18.00 $0,00 11 Compressor, Air Day $48.00 $0.00 12 Compressor, Air (Trailer) Day $155.00 $0.00 13 Decone Unit (3 stage) Day $75.00 $0.00 14 DehumidMlor Day $95.00 $0.00 15 Desco gun wMEPA attachment Day $38.00 $0.00 18 Drill, Cordless or electric 110V Day $14.00 $0.00 17 Drums, Fiber 38/Gal Day $53.00 $0.00 18 Druma, Steel wllid 55/Gal Day $127.00 $0.00 19 Dempster 3 CY Day $250.00 $0.00 20 Dumpster, Trash 40 CY Day $778.00 $0.00 21 Dempster Ramp Day $16.00 $0.00 22 Dumpster Carte (large' Day $12.00 $0,00 23 Dum star Carts (small) Day. $8.00 $0.00 24 Dust Pan Day $4.00 $0.00 26 Flra Permit Kit Each $100.00 ~ $0.00 26 Fork Lift Day $200.00 $0.00 27 Generator 5KW Day $45.00 $0.00 28Generator 10KW Day $115.00 $0.00 29 Generator 35KW Day $250.00 $0.00 30 Grinder oordlasa or electric 110V Day $14.00 $0.00 31 Hemmer, Air. 601b Day $75.00 $0.00 32 Hammer, Air 90Ib Day $90.00 $0.00 33 Hemmer, Electric601b. bey $122.00 $0,00 34 Hammer, Sledge #10 Day $12.00 $0.00 35 Hammer, Sledge#5 Day $9,00 $0.00 30 Hudson Sprayer Day $12.00 $0.00 37 Huse, Alr Day $65.00 $0.00 38 Hose, Fittings Day $6,00 $0.00 39 Hose, Water ,,Day $5.00 $0.00 40 Labor Law Posters Each $5.00 $0.00 41 Ladders 8' Day $7.00 $0.00 42 L Ladders 6' Day $8.00 80.00 TT/SA Wd6E:S0 17009 LT 'ueW 20T P2EL : 'ON Xdd DN I s� a1 I na 3N& 2H 91100e1bW : WOad 600T] [812,9 ON Hal] LZ:L1 0 tr00Z/Ll/E0 xa No. ad. Drocillitu/u Von #ofNis Moe Par BO Total Price 43 Ladders 10' Day $10.00 $0.00 44 Ladders 12' Day 514.00 $0,00 45 Ladders 14' Day $20-00 $0,00 48 Ladders 16' Day $22.00 $0.00 47. Ladder Extension 10' Day $22.00 $0.00 48 Ladder Extension 12' Day $24.00 $0.00 48 Ladder Extension 15' Day $30.00 $0.00 50 Lights, Halogen (lame) Day $12.00 $0.00 51 Lhts, Halogen (floodlight) Day $9.00 $0.00 52 Lighta,_String (501 Day $30.00 $0.00 53 Needle Gun w/ HEPA attachment Day $15.00 $0.00 54 Negative Al r 600 CFM Day $45.00 $0.00 55 Ngative Air2000 CFM Day $70.00 $0.00 56 Pad Holder Wheel Day $11.00 $0.00 57 Power, CPI Box Day $18.00 $0.00 58 Power, Spider Box day $35.00 $0,00 59 Pump, High Volume Day $55.00 $0.00 60 Respirator, Full Face Day 55.00 $0.00 61 Respirator, PAPR Racal Day $15.00 $0-00 62 Robf,Chute Day S180.00 $0.00 83 Roof, Shute 4ft. Sea. Day $16.00 $0.00 84 Roof, Rakes Day $4.00 $0.00 85 Saws, Chain Day $12,00 $0.00 68 Saws, Circular Day $9.00 $0.00 67 Saws, Drywall w/ HEPA Day $27.00 $0.00 68 Saws, Hack Day $4.00 $0.00 89 Saws, Hand Day $8.00 $0.00 70 Saws, Jig Day $11.00 $0.00 71 Saws, Sawzall Day $17.00 $0.00 72 Saws, Ski Day $10.00 $0.00 73 Safety Belts . Day $25.00 $0.00 74 Saffoidin0 2'x4' Day $22.00 $0.00 75 Scaffoldirq 6k10' Day $48.00 $0.00 76 Scaffolding Baker Day $28.00 $0,00 77 Scaffolding Wheels Day $8.00 $0.00 78 Scissor Lift Day $196,00 $0,00 79 Scrape Away Wheel Day $10,00 $0.00 80 Scrapers 8" Roof Day $5.00 $0.00 81 $dopers 8' Side walk Day $5,00 $0.00 821 Scrapers, Floor 3' Day $6.00 $0.00 83 Scrapers, Mutt Pay $6.00 saw 84 Scrapers, Razor 4" Day $7.00 $8.00I' $0.00 $0.00 85 Scrapers, Razor 8" Day 86 Sera ers, Sueee Day $5 00 $0.00 87 88 _ Shovel, Aluminum Shovel, Metal D Day $5 00 $3,00 $0.00 $0.00 89 Shoved, Plastic Day $4.00 $0.00 II/6d Wd6E:S0 1700E LI 'aeW E0I17E6L: 'ON XHd DNI SeallIfH 2NaN2H 51107abW: Woad r.,Lot t [sL..9 ON xalxl] zz:LL a" 700Z/2.1/60 Labor Worksheet National city Ore sin dub Name: Rev. t0.24-O3 Ne. 4tf. Dew Wu gift ime Price Par NW rsai rrws 1 Chemist / CIH Hour $226.00 $0.00 2 Clerical HOWv_ $29.00 $100 3 Construction Foreman Hour $56.00 $0A0 4'r® Engineer Hour $89.00 $0.00 5 Equipment Operator (Light) Hour _ ,. $84.00 $0.00 6 Equipment Operator (Heavy) Hour $75,00 $0.00 7 General Labor Hots driver l warehouse $2 4.00 $0.00 6 'Hazardous Waste Technician Hour ACM, LBP. MoldiFunpu $42.00 $0.00 QA Haz WWtete handler Prevail. Wage Hour ACM Mechaniad $74.00 $0.00 8B Asbestos Laborer Prevail. wage Hour ACM, t.sr, eroesruneue . _ . _ $09.00 $0.00 BB Asbestos I aborer Overtime Hour ACM, Ur, Mold/Fungus 4100.00 $0,00 8B Asbestos Laborer Double time Hour ACM, LMP, MnidIPungue $14.7.00 $0.00 BC Hazardous Waste Technician Hour with / PPE $57.00 $66.00 $0.00 $0,00 9 Health b Safety Specialist Hour 10 Project Director Hour $75.00 $0.00 11 Project Foramari/Supv Haz. Hour ACM, LBP. MoitliMmos $46.00 $0.00 11A Project Foreman/Supv Ha. Hour with / PPE $69,00 $0.00 12 Project Foreman Hour $41.00 $0.00 13 Supervisor Hour $39.00 $0.00 14 Superintendent Hour $70.00 moil- $0.00 $0;00 15 Supervisor, Contents Hour 16 96 Asbestos laborer Prevail. wage Hour Direct Cost a $29.90 $2,930.20 Total $22,930.20 Sat Overtime rates add 65% Sunday Overtime rates add 90% These rates reflect prevailing wage rates on 8A and 8B only. TI/TId Wd02:S0 1700E LT °a�W E0ti1726L: 'ON Xd.d ONI sem-11f1H DNZIdEH 31100JdW: Wald ,z r `QOO Bp ORATIth @ O RUDOLPH AND SLETTEN March 29, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: Subject: Steve: GENERAL AND ENGINEERING CONTRACTORS National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 M+H COR #2 — Delete portion of SDG&E scope for revised POC This letter is to transmit our review comments on the subject change order faxed March 22, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with reducing the SDG&E primary feed scope by deleting approximately 90 If. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted credit amount of $1,448. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at hnmills(a rscont.com. Sincerely, Rudolph and Sletten, Inc. Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 2 file RUDOLPH AND SLETTEN, INC. 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DIEGO, CALIFORNIA 92130 TEL. 858.259.6262 FAX. 858.259.8282 t800apOEB �®9 0 RUDOLPHANDSLETTEN March 29, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: Subject: Steve: GENERAL AND ENGINEERING CONTRACTORS National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 M+H COR #3 — Modifications associated with water service connections This letter is to transmit our review comments on the subject change order faxed March 22, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with changes outlined i.n JKA PR#002 — water service connections. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted amount of $0. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at hnmills(irscont. com. Sincerely, Rudolph and Sletten, Inc. Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 3 file RUDOLPI-I AND SLETTEN, INC. 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DIEGO, CALIFORNIA 92130 TEL. 858.259.6262 FAX. 858.259.8282 FROM :MRRCOTTE HEARNE BUILDERS I1,_ FAX NO. :7934102 .gar. 22 2004 10:06AM P1/6 MARCOTTE HEARNE BUILDERS, INC. March 22, 2004 Via Facsimile Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station #34 Marcotte & Hearne Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No, 003 Dear Sir: The contract adjustment required as a result of: PR #2 — revised water POC's for Sweetwater Authority. Change Order Request No, 003 Is $0 The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule, The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule Impact) of this change order request are subject to review and a re - quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work. Please issue an authorization and/or a change order, If you have any questions or comments pertaining to this matter, please contact the undersigned.. Very truly yours, , Quotation Accepted By: Wayne Powderly / Representing: Project Manager Date: 3'' CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax: 858-793-4102 FROM :MARCOTTE HERRNE BUILDERS It FAX NO. :7934102 ar. 22 2004 10:07RM P2/6 JOB NO. 04-003 COR NO. 003 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 PR #2 - Revised POCs for Sweetwater Authority SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE $0 credit can be offered because the specifications instructed the bidders not to include any cost for wet taps in the street. All subs bid the water lines to the property line - see spec section 02660-1.01. Paul Hansen $0 Added 72 sf of cut and patch in the street - neglIgable add because we have cut and patch at the location already per the bid set. M+HB $0 5% OH + P 1% Bond Premium Change Order Total $0 $0 so $0 $0f *0l00lnnnd until 1n nn r-i-v/nia Lin nnnn, r7.nnn :ROM :MRRCgiTE HEARNE BUILDERERRN1C FAX NO. :7934102 02 Mar. 22 2004 10:07RM P3/6 PROPOSAL REQUEST Distribution; x Steve Kirkpatrick x Howard Mills X Wayne Powderly x Jason Sanders x Frans Thomassan PROJ ECT: National City Fire Department Headquarters, Station 34 National City, California OWNER: City of National City 1243 National City Boulevard National City, CA 91950 TO: Marootte + Hearne Builders, Inc. 11626 Sorrento Valley Road, Suite 200 San Diego, Ca, 92121 PROPOSAL REQUEST NO, 002 DATE: March 1, 2004 ARCHITECTS PROJECT NO: 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the Contract Sum and/or lime incidental to proposed modifications to the Contract Documents described herein, Proposal shall be submitted in accordance with Article 26 of the General Conditions, Cost proposal shall be submitted Architect and Construction Manager no later than March 10, 2004, THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Sweetwater Authority has requested some revisions to the project plans regarding water sen/ices points of connection. The revised requirements are reflected on sheets Delta 1 Drawings C-2, C-3 and C-5, dated 02/04/04. The modifications are generally as follows: Revise area of sawcut at connection to water main In 16th Street to include abandoning the existing lateral at the main. C-3; Patch paving at connection to water main in 1e'h Street. C-5; Revise connection to existing main. Existing main is 16" (not 8" as indicated). Connection to existing main will be made by Sweetwater Authority. Fire Service - Sweetwater provides everything from water main to property line Domestic Water - Sweetwater provides everything from water main to meter box including meter box. Provide a cost proposal to reflect the revised scope of work. The cost should include additional trenching and patching, as well as the credit for the 8"x8"x6" and 8'x8'x2' tees, piping, trenching and connection to mainline that are no longer required. Reference Documents; C-2, Delta 1 dated 02/04/04 C-3, Delta 1 dated 02/04/04 C-5, Delta 1 dated 02/04/04 ARCHITECT; Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER: Rudolph & Sietten 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA 22130 ROM MARCOTTE HERRNE BUILDERS IC FAX NO. :7934102 Mar. 22 2004 10:07RM P6/6 SECTION 02660 EXTERIOR WATER DISTRIBUTION SYSTEM PART 'I GENERAL 1.01 SUMMARY A. The wont includes the installation of a 6" fire service, a 21A" domestic water supply and a 1 "14" irrigation supply. The new 1'%' meter will be installed by Sweetwater Authority. The work also includes the installation of the fire training water reclamation system. This Section also includes tre.noh pavement repair For areas crossing existing pavement, as specified in Section 02225, "Excavating, Eackfiiling and Compacting for Utilities". 3. The Owner will pay water capacity and wet tap fees. The Contractor shall make all arrangements to schedule water utility forces to make wet tap for Fire supply main. 1.02 REFERENCES The publications listed'below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. A. Standard Specifications: 1. American National Standards Institute (ANSI), ANSI A1O.6, 1983 Demolition Operations -Safety Requirements. 2. Standard Specifications for Public Works Construction (2000 Edition), "Greenbook", including the latest edition of the City of San Dien Regional Supplement Amendments, 3. Standard Drawings: San Diego Regional Standard Drawings, issued July, 2000, shall apply to the work to the extent referenced on the drawings. C. Geotechnical Report: A Geotechnical Report has been prepared for this project and is available for the Contractor's review, The Geotechnical Report is entitled " Geotechnical Investigation, National City Main Fire Station, National City, California", prepared by Geocon, Inc., dated September 24, 2003, Project No, 07143-22-01, The Geotechnical Report is believed accurate, however neither the information contained therein, nor conditions indicated to exist at the site are guaranteed to prevail throughout the job site. D. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM 8 42 (1986) Seamless Copper Pipe, Standard Sizes ASTM D1785 (1993) Poly Vinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80 and 120 ASTM D2466 (1994; Rev. A) Poly Vinyl Chloride (PVC) Plastic Pipe Fittings, Schedule 40 ASTM D2564 (1993) Solvent Cements for Poly Vinyl Chloride (PVC) Plastic Piping Systems City of National City Fire Department Headquarters, Station 34 National City, California 01 /05/04 Exterior Water Distribution System 02650-1 fl!19919lf1A NfiH 1R,A0 rrJmJ fin nnn..n FROM :MARCOTTE HEARNE FAX NO. :858 793 4102 May. 05 2004 03:25PM P1/5 MARCOTTE HEARNE BUILDERS, INC. May 5, 2004 Attn: Howard Mills Rudolph and Sietten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station #34 Marcotte & Heame Job No. 04-003 Via Facsimile Subj: Marcotte & Hearne Change Order Request No. 005 Dear Sir: The contract adjustment required as a result of: Credit for 50% of Sweetwater Authority's connection fees, per agreement betweem M+HI3, National City, and R+S. Change Order Request No. 005 is -$16,452 The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date, The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work. Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Very truly yo Quotation Accepted By: Wayne Powderly Project Manager Representing: Date: CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel, 858-793-4101 Fax: 858-793-4102 05/05/2004 WED 15:28 [TX/RX NO 7302] Ii001 FROM :MARCOTTE HEARNE FRX NO. :858 793 4102 May. 05 2004 03:25PM P2/5 JOB NO. 04-003 COR NO. 005 SUBCONTRAOT NO. MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Credit to National City for 50% of Sweetwater Authority fees per agreement with R&S and National City. DESCRIPTION Credit for Sweetwater fees SUBCONTRACTOR M+HB QUOTE -$16,452 SUBTOTAL 16,452 Change Order Total 416,4.521 05/05/2004 WED 15:26 [TX/RX NO 7302] [21 002 FROM :MRRCOTTE HERRNE 04/23/2004 16:20 FAX 185825S92e2 FRX NO. :858 793 4102 May. 05 2004 03:25PM P3/5 Rudclph_l_'Sletten,_Inc. 41001/004 ti4o � fa'o RUDOLPHAIND SLETTEN ICI a•YaaaL aping asarraatraa 0owfaacroaa April 23, 2004 Via fax 858.793.4102, US Mail & e- mail M+H Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, CA 92121 Attn: Wayne Powderly Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject: Sweetwater Authority Utilities and Services Dear Wayne: This letter Shall serve as a recap and evaluation of the scope discrepancies as they are associated with water utilities to the referenced project. hicluded within are comments addressing your letter dated April 9, 2004. In your letter, M+1i states specification 02662.1.01 clearly stating -permanent water connections and meters Will be installed by Sweetwater Authority and paid for by the Owner, National City. My comment to this is that the specification does indeed say, The Owner will pay water capacity and wet tap fees_ However this its in direct conflict of the plans, which show '"tee connections" on sheet CS and the General Conditions article 60 that require the Contractor to include costs for all permanent meters and other municipal charges that are to be included in the Contract Price both of which prevail over the referenced specification section as outlined in the bid documents. There is however a contradiction to the costs of meters in Article 67 of the General Requirements where it states, The City will reimburse the Contractor for the Water District's cost of the water meter — however the total cost of water meters are S2601- $80. This note does not relieve the Contractor of the municipal fees nor the requiretncnt to have utilities and Meterb installed in the Contractor's name until the completion of the project. Unfortunately we have to rescind our previous evaluation of Change Order Request #3 as proposed in Proposal Request #2 regarding Sweetwater changes due to the Findings contained herein. We have discussed the Correlation and intent of documents outlined in specification section 0101Q-3 Item F where the order of precedence outline General Conditions prevailing over drawings and drawings over specifications. Having recapped this, it appears that the majority of the Sweetwater Authority fees totaling S32,904 as outlined in their proposal dated March 29, 2004 shall be the oust of the Contractor, MI-H Builders. See attached break down titled Per the Contract Documents. Steve Kirkpatrick with National City has proposed to split the costs outlined in Sweetwater Authority's fee schedule with M-I-H Builders in the interest of moving forward with the project. A deductive change RUDoLPH AND StarrEN, INC. 10955 VISTA SORRNTO PARKWAY, SUITE 100 SAN DIE•GQ,CALInoRNTA 92130 TEL. R58.259.6262 FAX. 859.259.8282 05/05/2004 WED 15:26 [TX/RX NO 7302] 0J 003 FROM :MARCOTTE HEARNE 04/23/2004 16:20 FAX 185582598282 FAX NO. :858 793 4102 May. 05 2004 03:25PM P4/5 Rudolph_&_Sletten,_Inc, a 002/004 y4A��pdarr;br+etl RUDOLPS•iiLFI TTEN lei afrarsL £ IJI s.ors:Ialra iOOMI.aT.s. order in the amount of Si 6,452 has bean offered to settle this situation. See proposed break down attached titled National City One Time Offer_ If M+H Builders do not wish to entertain the option proposed above, National City will be forced to pursue the total costs associated with Complying with the eoutract documents. Please notify me of your position no later than Tuesday May 27, 2004 with your *Won. 1 may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at lmmilljscont oom with any comments Or questions you may have. Sincerely, Rudolph and Slettgn, Inc. Howard N. Mills Projsot Manager c: Steve Kirkpatrick —National City/Jeff Katz—JKA/Bill Hearne —M+II Builders/Mill job File R[J1 or rx AND SL.rrrEN, INC,. 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DIEGO, CALIFORNIA 92130 TEL 858.259.6262 FAX 858,259.8292 05/05/2004 WED 15:28 [TX/RX N0 7302] 8J 004 FROM :MARCOTTE HEARNE FAX NO. :858 793 4102 May. 05 2004 03:25PM P5/5 04/23/2004 16:20 FAX 13582586262 Rudolph_6_81etten,_Inc, Ii003/004 National City One time offer Sweet Water Authority Fees Break Down ITEM NO DESCRIPTION National City Tut+H Builders SWA COST ( no 5f8-Inch meter [detector meter for fire serviat $ 80.00 f - $ 80.00 $12,600.00 $ 7,$00.00 2 8-inch fire service S 2400,00 1000.00 3 bne 2-inch service $ 1,348.00 $ 5,882.00 4 One 1-1/2-inch meter $ 260.00 $ - $ 260.00 6 Storage aeseementfor one 1-1/2-Inch meter $ 1,500,00- $ 1_,600.00 $ 6,012.00 8 _ San Diego County Water Authority Capacity charge for 1-1/2-Inch meter $ 0,012.00 7 Credit for two 5/8-Inch meter fees $ 1160.00) $ (160.00) 8 Credit for Storage Assessment for two 5/8-inch meters $ (600.00) $ (600.00) 9 , Credit for San Diego County Water Authority capacity charge for two 5/8-inch meters $ (4,008.00) $ (4,008.00) $ 4,900.00_ $ 6,000.00 $ 120.00 10 Abandon two 1-inch services [Service Nos. 20583 & 8046E $ 4.900.00 11 _ Abandon 4-Inch main and fire hydrant $ 6.000.00 12 City of Natmnal City Permit Fee $ 120.00 TOTALS $16,452.00 _ $ '1r A2.d0 $ 32,904.80 $ 32,904.00 05/05/2004 WED 15:26 [TX/RX NO 7302] ra005