HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #1 throu #4 Fire Station #34City of National City, California COUNCIL AGENDA STATEMENT AEETING DATE July 6, 2004 AGENDA ITEM NO. 3 (-ITEM TITLE A Resolution of the City of National City Approving Change Order Numbers One, Two, Three and Four for the Fire Department Construction Project PREPARED BY Stephen Kirkpatrick DEPARTMENT Publiic Works/Engineering 336-4580 EXPLANATION See attached explanation. Environmental Review X N/A Financial Statement The aggregate total of the four change orders is $33,454. Funds are budgeted for these change orders in the project account number 250-409-500-598-1588. Approved By: i° 6d-r ,c.L Fi ance Director Account No. STAFF RECOMMENDATION Adopt the Resolution BOARD /COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) Resolution No. 2c04.-(1 L. 1. Resolution 3. CCO Numbers One, Two, Three, Four 2. February17,2004 Council Staff Report A-200 (9;99) RESOLUTION NO. 2004 — 115 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDERS NO. 1-4 FOR THE NATIONAL CITY FIRE DEPARTMENT, STATION 34 CONSTRUCITON PROJECT BE IT RESOLVED by the City Council of the City of National City, California, that Change Orders No. 1-4 for the Fire Department, Station 34 Construction Project are hereby approved. PASSED and ADOPTED this 6th day of July, 2004. ATTEST: Mic .el Dalla, it, Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on July 6, 2004, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California h 1 City erk of the City National City, California By: Deputy HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-115 of the City of National City, California, passed and adopted by the Council of said City on July 6, 2004. City Clerk of the City of National City, California By: Deputy Explanation: As of June 16, 2004, four change orders have been processed for the Fire Station project. Due to timing considerations and the work flow of the construction, staff has approved all four change orders and authorized the contractor to proceed with the work that they entail. This report is presented to Council as an information item and requests that a resolution be adopted to memorialize the change to the Fire Station contract amount. All four of the change orders are attached for Council's review. They are also briefly summarized in the table below: CCO Number Cost Impact Description One ($5,240) 1. Provide additional abatement of floor mastic materials found to contain asbestos in the existing Fire Station building during demolition. - $12,660 2. Modifications to the SDGE point of connection. — ($1,448) 3. Portion of the connection water connection and capacity fees being charged to the City. — ($16,452) Two $1,801 Addition of a 2-inch backflow preventer to the water service for the water reclamation tank. Three $23,662 Construction of a modified cul-de-sac at the north end of C Avenue. Four $13,231 Installation of a brass slide pole from the second floor living area to the fire equipment area for firefighter emergency response personnel. The aggregate total of the four change orders is $33,454. Funds are budgeted for these change orders in the project account number 250-409-500-598-1588. As shown in the attached February Council report, a total of $600,000 was budgeted for contingencies such as this as they arise during construction. These change orders are the first significant draw on the contingency account. City of National City, California UNCIL AGENDA STATEME MEETING DATE Fehriiary 17,7004 AGENDA ITEM NO. ITEM TITLE A RESOLUTION OF THE CITY COUNCIL OF NATIONAL CITY AWARDING A CONTRACT TO MARCOTTE & HEARNES BUILDERS, INC. FOR THE NATIONAL CITY FIRE DEPARTMENT, STATION 34 PROJECT, SPECIFICATION 1029 PREPARED BY Stephen Kirkpatrick DEPARTMENT Public Works/Engineering 336-4383 EXPLANATION See attached explanation. Environmental Review X N/A Financial Statement Funding for this project is available in the following accounts: 250-409-500-598-1588 $ 6,866,729 301 -409-500-598-1588 $ 202,500 >302-409-500-598-1588 $ 20225.000 STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A Approved By: '^^^ nance Dire or Account No. "ATTACHMENTS ( Listed Below ) 1. Resolution Resolution No, A-200 i9 991 EXPLANATION: Bids were opened for the National City Fire Department, Station 34 project on Wednesday February 4, 2004 at 3:00 pm. Plans had been advertised for construction bid since December 31, 2003, so there was approximately a five -week bidding period. The construction estimate for the project is $7,095,000. Six bids were received, in order from low to high: MARCOTTE & HEARNE BUILDERS T.B. PENICK & SONS, INC. CE WYLIE CONSTRUCTION CO. SOLPAC, INC RIHA CONSTRUCTION CO. A & D FIRE PROTECTION, INC. $ 6,749,000 $ 6,945,000 $ 6,950,000 $ 6,985,000 $ 7,200,000 $ 7,330,000 By speaking with Marcotte and Hearne Builders regarding the project, by speaking with other Architects that have worked with Marcotte and Hearne Builders, by checking references, and speaking with listed subcontractors in Marcotte and Hearne Builders' bid, it appears that we have a good contractor and a quality price — 4.8% below our construction estimate. The project is being awarded based solely on the base bid cost. However, the contract contained three additive alternatives and four deductive alternatives that could be utilized if the base bids came in above or below the budgeted project amount. By creating the alternates in the bid documents, the goal was to give the City flexibility to move forward with the project by using the alternates if it was needed to reduce the cost, and thereby avoiding the need to redesign and re -bid if the proposals were too high. As stated previously, Marcotte and Hearne Builders' proposal was below our estimate. In reviewing the alternate items and the proposal our budget allows us to add all three alternates. Add Alternate One is the a fifth Story on the training tower - $87,055. Add Alternate Two is a fully automated fire control system (bum room for live fire training) - $137,380. Add AlternateThree is a one-year (in addition to the one-year warranty) on the HVAC system. - $1,150 Including all three alternates the total construction cost of the project is $6,974,585, still 1.7% below our budget estimate of S7.095,000 This project is being funded by three sources. A HUD loan in the amount of $6,866,730, a CDBG Grant in the amount of $202,500, and finally a loan from CDC reserves in the amount of $2,225,000. Please see "Financial Statement" on the A-200 form cover . The total construction cost of the project is as follows: Construction Bid including alternates $6,974,585 Architecture/Engineering $675,000 Temporary Facilities $250,000 Construction Management $300,000 Material Testing and Inspection $60,000 Furniture, Finishes, and Equipment $250,000 Contingency $600,000 Fiber Optic Connection $100,000 Public Art 77,500 Total $9,287,085 CHANGE ORDER C/O Number: 1 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: May 10, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Provide additional abatement of floor mastic materials found to contain Asbestos in the Fire Station building $12,660 2. Modifications for SDG&E point of connection as outlined in Jeff Katz Proposal Request No. 001 Dated March 1, 2004 •••.($1,448) 3. Clarifications for Sweetwater Utility work as outlined in JKA PR 002 dated March 1, 2004 .....$0 4. Portion of Sweetwater Authority fees now being performed by Sweetwater. As outlined and submitted in M+H Builders C. O. R. # 005 dated May 5, 2004 ($16,452) REASON FOR CHANGE: 1. Hazardous conditions. 2. SDG&E shop drawings deviated from bid set drawings 3. Define scope of work being performed by Sweetwater Authority 4. Define scope of work being performed by Sweetwater Authority COST RECONCILIATION: Costs were reviewed by the architect and City and negotiated to the satisfaction of the City. The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $0 The Contract Amount prior to this Change Orders $6,974,585 With this Change Order request the Contract cost is decreased by ($5,240) New Contract Amount $6,969,345 Change in Contract Time: 0 days Contract Completion Date: Recommended for Approval by: CO ii STRUCTION MANAGER / R&S PR ' ARC ITECT / Jeff Katz Architecture n Approved by: 1 s� /,, 7 CONTRACTOR/ Ma anal Hearne :,. ilders OWNER/ City f National City City Of National City (original w/all d"bc nentation)/MH Builders (copy w/all documentation) Ri 3Slettrn, Inc (conv / donimentation) 141' , zoaei-- DATE DATE DATE DATE Distribution: co" re@o 4110 RUDOLPH ATtD SLETTEN GENERAL AND ENGINEERING CONTRACTORS March 19, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters - Station #34 R&S Job No. 2848-0 Subject: M+H COR #1 - Additional Abatement at Carpeted Areas of Fire Station Steve: This letter is to transmit our review comments on the subject change order faxed March 17, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with handling containing and removal of asbestos containing material found under VCT in carpeted areas of the Fire Station. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted amount of $12,660. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at hnmills(a rscont.com. Sincerely, Rudolph and Sletten, Inc, Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 1 file RUDOLPII AND SLE"FI'EN, INC. 10955 VISTA SORRENTO PARKWAY, SUII'L 10Q SAN DIEGO, CALIFORNIA 92130 V Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 March 15, 2004 MARCOTTE HEARNE BUILDERS, INC. Subj: Marcotte & Hearne Change Order Request No. 001 Dear Sir The contract adjustment required as a result of: Additional abatement required for VCT discovered under existing carpet. Change Order Request No, 001 is $12,660 co,V2V . 1v�/ The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance, We HAVE proceeded with this revised work. Please issue an authorization and/or a change order. if you have any questions or comments pertaining to this matter, please contact the undersigned, Very truly y/qurs, Via Facsimile RE: National City Fire Station #34 %} Marcotte & Heame Job No. 04-003 3h7 %04 lt3 AGl[ up. frvp Wayne Powderiy Project Manager Quotation pled, By: Representir: Date: 7 CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File h Ctrts 11696 Sorrento Valley Rd., Site. 200, San Diego, CA 92121 Tel. 058-793 4101 Fax: 058-793-4102 LL/Ld NdLz:Se t?0 LL `-rew z0i7E61_,: '0N XHr a DN I SZIaT 1I lH EN6HDH d 1P,0Ndi4 : WfN `+gym vvV(,f LLI6U 6ATI: COAWANYt A itENTtQ 4: PAX NO PROW SAN WHO Ell Non, CA 173030 (619) %2-7730 (966) 400.9353 (629) 56267751 piiX r.1atnv-taehm 3 a t7 14/#3 yAle 410283131111111 Ar NUMMI G? PAGES (ZNa.LJJNO eo1fiR SHEET): t ) ,EASE REPLY ( ) GALS. IF YOU MAW QUES rK NS ( ) ummlNT ROAR Se any foto-Ann es iarrnrishm ditthy wend hthno. If the ranger of thin inswenee 500 Infonente mithalehr, en hominy ml(fut2 1340 erte chreine, en"ne7 for) ( 9 ) CONF1206 M dENT ) NO MANSE 0KIIAREA .:ANa)uM:ifigMan 14) 12*4010 moo) 4c0-3852 Bey 019) 2e5-6494 MS) 400-9868 (510) %86-8480ia` R San W Las (7021416C•08a4 (CM 740.60G0 QY92) 220.78404u (877) 406.9 383 Me) 740. 5o (910) 814•1O 1410)914-799 , Tied WdLE:SO POOE zT °-t2W ZC3T17E62 : 'ON XHd 3N I a 1I fie, ANNH3H H1 L07)N17ib,! : I,inm., i boom [Bl'Z9 ON X8/x1] LZ LI. 0 bOOZ/LLtE0 FROM IMRRCOTTE WEraRNF BUILDERS 1NG FAX ND./7934102 Mar. 15 2004 05;47RM P2 National City Fire Station #34 Marcotte + Hearne Builders Inc. Subcontractor Change Order Break Down Analysis ( ,k,z,:k ivkNeuviitwx Unit Cost Materiels: Description OTY (incl. Tax) Total Item 1 .. .¢�"�C�ije+C.+. . 3.344 Item 2 Item 3 Item 4 Item 5 Equipment Description Item 1 %4'rp~ Item 2 Item 3 Item 4 Item 5 AUBTOTAL "A" QTY - Unit Goat HOUFtS (Incl. Tax) Tettll 124, Labor Class Type_ Class Type Class Type Claea Type Prev, Wage RS Base Rete Total 20 SUBTOTAL "C" .t7ecam nierclail General Liability and Property Damage Insurance Workers Compensation Insurance7r Social Security and Unemployment Taxes ENaL SUBTOTAL "I9" ‘?is. emeeaa SUBTOTAL AQB'4.0 +ri 66,6 gl J 3ff t Subconteactor Mark Up 15% Slf /5 7 fr2 Total Sut>oontroater Change Ord 49441A, miev er ta44. z , g d Asko, l49s 09041fi ffi e,1°, o 900 a [BLZ9 ON X8/X1] LZ:LL 03 OOZILI/EO Materials Worksheet Netrlonal City Fire Station Ma. Dada Qtr. Dasoilptlua Jab Name: ?may.fo44"09 IIIL MUNI UM Tatel Mai 1 A100 9 Adhesive Spray Each $6.24 $56.10 2 A101 3 Air Monitoring Cassettes Each $3.+ $18.30 3 A102 Blades Floor 3' Slink Each $9,00 $0.00 4 A103 Blades Floor4" Razor Each $0.84 $0.00 5 A104 20 Blades Floor 8' Razor Each $2.44 $48.00 6 A105 Blades Roof 8' Each $270 50.00 T A106 4 Blades, Utility Knives Each $0,29 $1.16 6 A107 Brushes, Tooth Each $1.87 $0.00 9 A108 4 Brushes, Wirelong Handle Each $3.25 $13.00 10 A109 10 Howl , Protection Each $0.49 $4.90 11 A110 28 Caveralt.% full body with hood Each $3.36 $63.80 12 A111 2 Danger Signs (Nish) Each $0.75 $1.50 13 A112 2 Danger Suns (Spanish) Each $0.86 $1.70 14 A113 Danger Stickers Each $0.36 $0.00 15 A114 1 D c er Tape - Yellow Roll $26.00 $26.00 18 A115 4 Glasses, Safely Each $8.65 $34.60 17 A118 16 Gloves, Cotton White Pair $1.70 $27.20 18 A117 4 Gloves. Leather Pair $4.78 $19.12 19 A118 24 Gloves. Rubber Yellow Pair $1.65 $39.60 20 A119 2 Goggles, Safety Each $5,20 $10A0 21 A120 2 Knives, Carpet Each $3.80 $13.50 22 A121 4 Knives, Utility Each $4,40 $17.00 23 A122 10 Quicksorb Lb. $0.35 $3.50 24 A123 35 Rags, Mixed Lb. $1.65 $57.75 26 A124 Rain Sullimadlum) Each $21.00 $0.00 26 A125 Rain Suit (large) Each $26.00 $0.00 27 A128 20 Respirator Wipes Each +.20 $4-00 28 A127 1 Shampoo Eech $7.75 $7.75 29 A128 30 Shower Towels Each $0.40 $12.00 30 A129 1 Staples 318" Box $44.01 $4.01 31 A130 Tepe, Duct 2" (red) Each $7.40 $0.00 32 A131 16 T =e, Duct 2" (silver) Each $5.88 $93.60 33 A132 Tape, Duct 3' silver Rgll 1111111M $0.00 34 A133 Tape, Painters (blue) Roll $13.00 $0.00 35 A134 Light Bulbs, Halogen Each $11,00 $0,00 A137 Blades Floor 2' Slick Each $16.00 $0,00 A201 Encapsulant ; 22P Powerlvck) Gallon $16.00 $112.00 A204 Mastic Remover 747 Galion $26.00 $910.00'. 39 A205 Mastic Remover 787 Gallon $35.00 $0.00' 40 A208 Mastic Remover Env. Gallon $22.00' $0.00 7G?17t7S'F,).: "ON DN I S?i G-!IfH 'ANHH=P,H 2110")NHW : WIr?i_-1 9001€] [EI:Zs ON x8/x11 LZ: Lt. 03 00Z/LL/EO Me, cede Qry. 0eec111a1+I 41 A208 2 Surfactant(5g9UCtn) , 42 A209 43 44 46 47 A211 A300 A301 A302 A303 49 A304 A306 Unit POOPit Unit .ntaina. $13.00 106111 hiss $26.00 Duct Encapsulantl • kote Mastic Remover 31SX-90 (6geWctn) Filters, Negative Alr #1 PRE Fitters, Negative Air 02 PL7 Filters, Negative Air #3 WIrt3 Filters, North 112 combo 24 Fitters, North 1/2 Reap Filters, Racal #SP-3 PAPR usEssum 220 Gallon $80.00 ontalne $38.00 Each $1.30 $0.00' $0.00 $3.90 Each $7.50 $22.50 Each $7.80 $23.40 Each $11.00 1111.1105 Each Each $5.26 $10.00 $126.00 Pads, Buffing 20" Each 111 48 BagarA" 30x40 BMiL Flex Duct 12'x25' 60 67 A411 mA412 o� m 70 Flex Duct 14'x25' Glove Bags 44x80 (hor arJ Glove Bags 44x60 overt) Poly 10x100 4MIL FIR Glove flags e0x80 641. Poly 20x100 4MIL Poly 20x100 4MIL FIR Poly 20x100 4MIL (black) Poll 20x100 6MIL Poly 20x100 6MIL FIR Poly 20x100 6MIL (bleck9 Poly 8x100 4MIL $36.00 $3.50 61.16 $0.95 $0.00 $12.80 $6.40 $725 $108.00 $21.00 $253.00 $0.00 Each Each Each Roll Ron LL A421 Poly 8409 2MIL Roll $34,00 $0.00! 77 78, A425 Poly 10X100 4MIL Roll $57.00 $0,00 70'; A426 Po 20x100 6MIL Reinforced Roll $239,00 $0.00' r 4 1/22 Face Respirator Each $20.75 $119.00 81 3" ` t le Scraper Each $8.90 50.00' 82 4 Floor Scraper (large 61 Each $9,85 $39.40 Collin •. Scraper (small 3° Each $8.80: $0.00 85 Glaw Hammar ._ ��.. NM$7 = , 35! $9.00 $0.00 $0.00 Crow Bar 18e _ 80 Grow Bar 36" Each .. $11.20; -.50' $0.00 $0.00' 87 Crow Foot Each rna 77.11? L1r:1:- {4-W S 1 LOOI1 LBLZ9 ON XH/X17 LZ:LL O. POOZ/LL/CO Gods qtk lioscrllltlsni NIII PrIce far Unit Total Pas BB Drop Lights (single) Each $13,115 $0.00 69 Extension Cord (50 Ft) Each $12.00 $0.00 90 1 Fire Extingul her OncludedL Each $0,00 $0.00 91 1 First Add IQ (included) Each $0.00 $0.00 92 Hard Hat Each $0.22 $0.00 93 Knee Rids Pair $11.00 $0.00 94 Light Bulbs (.1.00w) Each $125 $0.00 96 2 Rubber Boots Pg)r $17.00 34.00 96 Stapler Each $34.80 _ $0.00 98 Bond seal Gallon $22.00 $0.00 99 6 Gloves, Bleat Neoprene Each $8.20 $4920 100 3 Drums, DOT 55 Gallon wed and lock ring Each $127,00 $381.00 101 1 HEPA Filter Each $192.00 $192.00 102 Awe is anti -microbial sealer Gallon $36.75 $0.00 103 Sane-10 santttzer _ Gallon $19:00 $0.00 104 $0.00 105 Per Diem fees. food and lodging 6,52.00 $0.00 106 Courier fees Each , r r, $0.00 107 $0.00 108 $0.00 109 $a TOTAL: $3,394.50 00OI [SL70 OH XH/X1] Ld:LL 0 bOOZ/LL/CO Equipment, Testing, and Disposal Worksheet lab Nome National city fire stn K0. (tv. DescrkIUBu Rev. YO-z4-0 011it # OtUalite Mee Per NI Teral Pilo 1 Air Sam . Iin, Porn. Personal Days $40.00 $0.00 2 Airless, FIo trio Dray $75.00 $0.00 3 Airless, Ges Day $75.00 $0.00 4 Bench DIY $18.00 $0.00 5 Broom, Hours Day $5.00 $0.00 6 Broom, shop Da ' $7.00 $0.00 7 0 Day0 $57AD $0.00 8 2 Boffin. Machine 20' Da _. 2 $109.00 $435.00 Chisel, 1' Day. $14.00 $0.00 1. Chisel, 3' Os . • $18.00 $0.00 Com.tenor, Air Day $48.00 $0.00 12 Compressor Ale (Treller) Da $188.00 $0.00 Dacorre Unit (3 stale) .: , , $0.00 DehumldltI Da $95.00 0.00 Desco gun w/HEPA mttachment : + + DMr, Cordless or electric 110VDa $14.00 Drums, Fiber 351GaI D $53.0e Drums, Steel wAid 55/GolDay $0.00 Da Son e $0.00 13 e 00 Dumpster Cans (Iar1 Day $0.00 Dum • Garts sma[ID - $0.00 se Dust Pan Day S4,00 $0.00 FIIe Permit Kit Each , r e e e 0.00 • Fork Lift D _ ' e r $0.00 Generator 5KW % e e $0.00 28 Mill Generator 10KW r $0,00 Generator 35KW Ds $250.00 30 Gdndar cordlasa or electric 110V Day 514.00 30.00 31 Hammer, Air 601b Da - $75.00 Hammer, Air 90Ib Day $90.00 10,00 33 Hemmer, Electric 601b. De $122.00 34 In Ma NM Hammer, Sledge #10 D; 00 $0.00 Hammer, Sledge#5 Da $9,00 $0.00 Hudson Sprayer • : $12.00 $0.00 37 Hose, Air= ++ $0.00. 38 Hose, Fittings 1 55.00 $0.00, 39 Hose, Water NI $5,00 $0.00! 40 Labor Law Posters EacB $5.00 $0.00 41 Ladders 6' Ds , $7.00 $0.00 42 Ladders 8° DIY 8.00 $0.00 600f [,BLZ,9 ON Xa/X17 LZ:LL 0 VOOZ/LL/EO Xa No. WY. 08801851e 43 Ladders 10' 44 Ladders 12' 48 49 50 51 52 53 54 55 58 57 58 59 80 81 70 Ladders 14' Ladders 15' Ladder Extension 10' Lights, Hatopen Qar�e) Ltghte, Halogen (tloaddii$htj LiOhta, 811109 (50') 1112 $al 72 Sa 73 75 76 ORR it of Was Rico Per Ile Total Price Day $10.00 $0.00 Day $14.00 $0.00 Da $20.00 $22.00 Da $22.00 5affoiding 2'x4' Scaffolding 5'x10' Scaffoldin . Baker Day Day Day 78 82 Away Wheel Scrapers 8" Side Walk Scrapers, Floor 3" Serra, Mutt Scrapers, Razor 4' Scrapers, Razor 8" Scrapers, ee Shovel, Alutnlnurn 85 Shovel, Metal Day a NMI $0.00 $0.00 $0-00 $24.00 $0.00 rrr $0,00 $12.00 $0.00 $9.00 $0.00 $30.00 $0.00 $15.00 $0,00 $45.00 11100 $70-1 r $0,00 $11.00 -).00 $0.00 $18.00 $35.00 $0,00 $66.00 8100 $$.00 $15.00 $180.00 $15.00 $4.00 $12.00 $9.00 $27.00 $4.00 $6-00 $11.00 $17.00 $10.00 $25.00 $28.00 rr $195.00 $10,00 $5.00 $5.00 $7.00 $8.00 $5.00 $5.00 Shovel, Plastic Da 53,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 ,00 $0.00 .00 $0.00 $0.00 $0.00 54.00± $0.00 ID GGo [sLzes ON xa'x1] LE Lt. o' '700z/LL/CO Labor Worksheet National city fire sin Sob Name: Rev.-104441 No. QM Sesetionse Veit Nelse PntrA Per wr Texan nerd 1 Chemist !GIN Hour $225.00} $U•UO 2 Cledcel Haar $29,00 $3.00 3 Construction Foreman Hour $56.00l $0,00 4 Engineer Hour $89.001 $0.00 5 Equipment Operator (LIght) $84.00 $0.00 6 ,Hour Equipment Operator (Heavy) Hour. $75,00 $0.00 7 General Labor Hour driver lwarehouse 4 $34.00 $0.00 6 Hazardous Waste Technician Hour ACM, LBP. MoldaFwpw $42.00 $0.00 8A Has Waste handler Prevail, Wage Hour ACM weaunicsi i74.00 $0.00 8B Asbestos Letterer Prevail. wage Hour ACII,sm,moidirundue . $51.00 $0.00 8B Asbestos laborer Overtime Hour MA UPIMoIrllFanoun $106.00 $0.00 88 NbuMos tabour Double time Hour ACM, LAP, MnIdJPunque $147.00 $0.00 8C Hazardous Waste Technician Hour, with 1 PPE $57.00 $0.00 9 Health & Safety Specialist Hour $05.00 $0.00 10 Project Director Hour $75.00 $0.00 11 Project FOremanlSupv Hoz, Hour ACM, LUP, MoMlFurgus 945.00 $0.00 11A Project. Foremanl$upv Haz. Hour with r PPE $69.00 $0.00 12 ., Protect Foreman Hour $41.00 $0.00 13 Supervlcor Hour $39 00 $0.00 14 Superintendent Hour $70.00 $0.00 15 Supervisor, Contents Hour $36.00 $0.00 18 98 Asbestos Laborer prevail. wage Hour Aired Cost . $29.90 $2,930.20 J_ 0. Sat Overtime rates add 85% Sunday Overtime rates add 90% These rates reflect prevailing lunge rates on SA and BB only. $a,03o.2Ui QOp4r ORwT$O+ RUDOLPH AND SLETTEN GENERAL AND ENGINEERING CONTRACTORS March 29, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject: M+H COR #2 — Delete portion of SDG&E scope for revised POC Steve: This letter is to transmit our review comments on the subject change order faxed March 22, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with reducing the SDG&E primary feedscope by deleting approximately 90 If. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted credit amount of $1,448. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at luunills(a�rscont. com. Sincerely, Rudolph and Sletten, Inc. Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 2 file RUDD].P11 AND SLI,:ri N, INC. 10955 VISTA SORRIsNTO PARKWAY, SUITF 100 SAN DIEGO, CALIFORNIA 92130 y�00,,D ATAb t °fig®@O R �.9D LPHAND LETEN GENERAL AND ENGINEERING CONTRACTORS March 29, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject: M+H COR #3 — Modifications associated with water service connections Steve: This letter is to transmit our review comments on the subject change order faxed March 22, 2004 from M+H Builders. We have reviewed the submitted change order for additional work associated with changes outlined in JKA PR#002 — water service connections. Our findings reveal that the back up and processing are in order. We recommend the attached change order be approved for the submitted amount of $0. Please notify me if any additional information is required to process this change order. I may be reached by phone at 858-509-2213, fax at 858-259-8282, or by email at hnmills a rscont.com. Sincerely, Rudolph and Slett. n, � y •tJ, Howard N. Mills Project Manager c: Jeff Katz — JKA/COR 3 file RUDC)I 1'I I AND SIJ rI'I;N, INC. 10955 VISTA SORR1?NI'O PARK\;AY, SUM,: I00 •£ S;\N DIF.GO, C \I.LI ORNI-A 92130! FROM :MARCOTTE HEARNE BUILDERS I1,_ FAX NO. :7934102 Aar. 22 2004 10:06AM P1/6 MARCOTTE HEARNE BUILDERS, INC. March 22, 2004 Via Facsimile • Attn: Howard Mills Rudolph and Sietten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station 434 Marcotte & Hearne Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No, 003 Dear Sir: The contract adjustment required as a result of: PR #2 — revised water POC's for Sweetwater Authority, Change Order Request No. 003 Is $0 The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule. The Job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule Impact) of this change order request are subject to review and a re - quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work. Please issue an authorization and/or a change order, If you have any questions or comments pertaining to this matter, please contact the undersigned. • Very krulyyou rs-- 1/ Wayne Powderly Project Manager Quotation Accepted By: Representing: Crt< Date: 3 014 CC; Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Rd., Ste, 200, San Diego, CA 92121 Tel. 858-793-4101 Fax:858-793-4102 FROM :MARCOTTE HEARNE BUILDERS It FAX NO. :7934102 ar, 22 2004 10:07AM P2/6 JOS NO, 04-003 COR NO. 003 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 PR #2 - Revised POCs for Sweetwater Authority SUBCONTRACT NO. DESCRIPTION . SUBCONTRACTOR QUOTE $O credit can be offered becauseLthe specifications instructed the bidders not to include any cost for wet taps in the street. All subs bid the water lines to theproperty line - see spec section 02660-1.01. Paul Hansen $0 Added 72 sf of cut end patch in the street - neglIgabie add because we have cut and patch at the location already per the bid set. M+HB $0 SUBTOTAL 5%OH+P 1% Bond Premium $0 $0 $0 $0 Change Order Total $0 =ROM : P1ARCEITTE HEARNE BU I LDEREARN,IC FAX NO. : 7934102 02 Mar, 22 2004 10:07AM P3/6 PROPOSAL REQUEST Distribution: x Steve Kirkpatrick x Howard Mills x Wayne Powderiy x Jason Sanders x Frans Thomassen PROJ ECT: National City Fire Department Headquarters, Station 34 National City, California OWNER: City of National City 1243 National City Boulevard National City, CA 91950 TO: Marcotte + Hearne Builders, Ina. 11695 Sorrento Valley Road, Suite 200 San Diego, Ca, 92121 PROPOSAL REQUEST NO, 002 DATE: March 1, 2004 ARCHITECT'S PROJECT NO: 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein, Proposal shall be submitted in accordance with Article 25 of the General Conditions, Cost proposal shall be submitted Architect and Construction Managsr no later than March 10, 2004, THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Sweetwater Authority has requested some revisions to the project plans regarding water services points of connection. The revised requirements are reflected on sheets Delta 1 Drawings C-2, C-3 and C-5, dated 02/04/04. The modifications are generally as follows: C-3: C-5: Revise area of sawcut at connection to water main In 16°i Street to include abandoning the existing lateral et the main, Patch paving at connection to water main in 16'h Street, Revise connection to existing main. Existing main is 16" (not 8" as indicated). Connection to existing main will be made by Sweetwater Authority. Fire Service - Sweetwater provides everything from water main to property line Domestic Water - Sweetwater provides everything from water main to meter box including meter box. Provide a cost proposal to reflect the revised scope of work. The cost should include additional trenching and patching, as well as the credit for the 8"x8"x6" and B'x8`x2' tees, piping, trenching and connection to mainline that are no longer required, Reference Documents: C-2, Delta 1 dated D2/04/04 c-3, Delta 1 dated 02/04/04 C-5, Delta 1 dated 02/04/04 ARCHITECT: Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER: Rudolph & Sietten 10955'Vista Sorrento Parkway, Suite 100 San Diego, OA 92130 ROM•:MRRCOTTE HERRNE BUILDERE C FRX NO. :7934102 Mar, 22 2004 10:07RM P6/6 SECTION 02660 FX.TERIOR WATER DISTRIBUTION SYSTEM PART 'I GENERAL 1.01 SUMMARY A. The work includes the installation of a 6" fire service, e 2'/1' domestic water supply and a 1'/P irrigation supply, The new 11/2' meter will be installed by Sweetwater Authority. The work also includes the instatlation of the fire training water reclamation system. This Section also includes trench pavement repair for areas crossing existing pavement, as specified in Section 02225, "Excavating, Sackfilling and Compacting for Utilities". B. The Owner will pay water capacity and wet tap fees. The Contractor shall make all arrangements to schedule water utility forces to make wet tap for fire supply main. 1.02 REFERENCES The publications listed'below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. A. Standard Specifications: 1. American National Standards Institute (ANSI), ANSI A1O.6, 1983 Demolition Operations -Safety Requirements. 2. Standard Specifications for Public Works Construction (2000 Edition), "Greenbook", including the latest edition of the City of San Diego Regional Supplement Amendments, B. Standard Drawings: San Diego Regional Standard Drawings, issued July, 2000, shall apply to the work to the extent referenced on the drawings. C. Geotechnical Report; A Geotechnical Report has been prepared for this project and is available for the Contractor's review. The Geoteohnical Report Is entitled " Geotechnical Investigation, National City Main Fire Station, National City, California", prepared by Geocon, Inc., dated September 24, 2003, Project No. 07143-22-01. The Geotechnical Report is believed accurate, however neither the information contained therein, nor conditions indicated to exist at the site are guaranteed to prevail throughout the job site. D. AMERICAN SOCIETY FOR TESTING AND MATERIALS (,ASTM) ASTM B 42 (1986) Seamless Copper Pipe, Standard Sizes ASTM D1785 ASTM D2465 ASTM D2564 (1993) Poly Vinyl Chloride (PVC) Plastic Pipe, Schedules 4-0, 80 and 120 (1994; Rev. A) Poly Vinyl Chloride (PVC) Plastic Pipe Fittings, Schedule 40 (1993) Solvent Cements for Poly Vinyl Chloride (PVC) Plastic Piping Systems City of National City Fire Department Headquarters, Station 34 National City, California 01/05104 Exterior Water Distribution Systern 02660-1 • FROM :MARCOTTE HEARNE FAX N0. :858 793 4102 May. 05 2004 03:25PM P1/5 MARCOTTE HEARNE BUILDERS, INC, May 5, 2004 Attn: Howard Mills Rudolph and Sietten 10955 Vista Sorrento PKVVY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station #34 Marcotte & Heame Job No. 04-003 Via Facsimile Subj: Marcotte & Hearne Change Order Request No. 005 Dear Sir: The contract adjustment required as a result of: Credit for 50% of Sweetwater Authority's connection fees, per agreement betweem M+HB, National City, and R+S. Change Order Request No. 005 is -$16,452 The incorporation of this revision into the contractual scope of work will require working clays not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work. Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned, Very truly you , /) Quotation Accepted By: Wayne Powderly Project Manager Representing: Date: CC; Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Bd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax;858-793-4102 a 'FROM :MARCOTTE HERRNE FAX NO. :B58 793 4102 May. 05 2004 03:25PM P2/5 JOB NO. 04003 COR NO. 005 MARMITE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Credit to National City for 50% of Sweetwater Authority fees per agreement with R&S and National City. SUBCONTRACT NO, DESCRIPTION SUBCONTRACTOR QUOTE Credit for Sweetwater fees M+HB -$16,452 SUBTOTAL -$ 18,452 Change Order Total-$16,452 'FROM :MRRCOTTE HERRNE 04/23/2004 16:20 FAX 18582698282 FRX NO. :858 793 4102 May. 05 2004 03:25PM P3/5 Rudclph_&_Sletten,_Inc. 001/004 #�yVuAassta a.0 1111 RUDOLPH.sD SLETTEN o■ra=ie tun 7f4IMs•}.r11e! aosrsACTOU.e April 23, 2004 Via fax 858.793.4102, US Mail & e- mail M+FI Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, CA 92121 Attn: Wayne Pow4erly Reference: National City Fire Department Heaadquaxtore — Station #34 R&S Job No. 2848-0 Subject: Sweetwater Authority UtiUtles and Services Dear Wayne: This letter shall serve as a recap And evaluation of the scope discrepancies as they are associated with water utilities to the referenced project. Included within are comments addressing your letter dated April 9, 2004, In your letter, M+H states specification 02662.1.01 clearly stating permanent water connections and meters will be installed by Sweetwater Authority and paid for by the Owner, National City_ My comment to this is that the specification does indeed say, The Owner will pay water capacity and wet tap fees_ However this is in direct conflict of the plaits, which show 'lee ootmeotlons" on sheet CS and the General Conditions article 60 that require the Contractor to include costs for all permanent meters and other municipal charges that are to be included in the Contract Price both of which prevail over the referenced specification section as outlined in the bid documents. There is however a contradiction to the costs of meters in Article 67 of the General Requirements where it states, The City will reimburse the Contractor for the Water District's cost of the water meter — however the total cost of water meters are $250 1- $80. This note does not relieve the Contractor of the municipal fees nor the requirement to have utilities and teeters installed in the Contractor's name until the completion of the project, Unfortunately we have to rescind our previous evaluation of Change Order Request #3 as proposed in Proposal Request #2 regarding Sweetwater changes due to the findings contained herein. • We have discussed the Correlation and intent of documents outlined in specification section 0101Q-3 Item F where the order of precedence outline General Conditions prevailing over drawings and drawings over specifications. Having recapped this, it appears that the majority of the Sweetwater Authority fees totaling $32,904 as outlined in their proposal dated March 29, 2004 shall be the cost of the Contractor, 1vi1 It Builders. See attached break down titled Per the Contract Documents. Steve Kirkpatrick with National City has proposed to split the costs outlined in Sweetwater Authority's fee schedule with M+H Builders in the interest of moving forward with the project. A deductive ohange RUDOLPH AND SLETFEN,1NC, 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DieGQ, GAI,TroTNTA 92130 TEL. 856,259.62621*AX. M.259.82132 :2. 'FROM :MRRCOTTE HERRNE 04/23/2004 16;20 FAX 18582588282 FAX NO. :858 4102 May. OS 2004 03:25PM P4/5 Rudolph_Oletten,_Inc , fJ 002/004 {49�1,As4r�a'41. RUDDr.FSwn.8.LD TTZN eari1 A , AVM rN011111l 11V112011WBAomnie order in the amount of $a 6,452 has been offered to settle this situation. See proposed break down attached titled National City One Time Offer. JfM+H Builders do not wish to entertain the option proposed above, National City will be forced to pursue the total costs associated with Complying with the contract documents. Please notify me of your position no later than Tuesday May 27, 2004 with your decision. I may be reached by phone at 858-509-2213, fax at 858-259-82B2, or by email at hnmillaCulraoont nom with any comments oOr questions you may have. Sincerely, Rudolph and Sle ,Inc. Howard N. Mills Proj eat Manager e: Steve Kirkpatrick —National City/Jeff Katz — JKA/Bill Flown* — M4-H Builders)M+H job File RfTI)0 Pr -I AND STJ.TFEN, LNC. 10955 VISTA SORR'E?NTO PARKWAY, SUITE 100 SAN DIE;GO, CALIFORNIA 92130 TBL, S58239.6262,FAX, 8S8.259.a2112 'FROM :MARCOTTE HEARNE 04/23/2004 16:20 FAX 165B259B262 FAX NO. :858 793 4102 May. 05 2004 03:25PM P5/5 Rudolph_&_Sletten,®Inc, Z 003/004 National City One time offer Sweet Water Authority Fees Break Down ITEM NO 55ESCRIPTION -national City Nithl Builders SWA COST I One 5/8-inch meter [detector meter for fire service] $ 80,00 t - $ 80.00 2 _ 6-inch fire service $ 2,000.00 10,800.00 $ 12,600.00 3 one 2-inch service $ 1,348.00 $ 5r852.00 $ ,7,200.00 4 One 1-1/2-inch meter $ 260.00 $ - $ 280.00 6 Storage asaesment for ono 1-1/2-inch meter $ 1,500,00 $ 1►500.00 8 San Diego County W fer Authority Capacity charge for 1-1/2-inch meter $ 6,012,00 $ 6,012.00 7 Credit for two 51e-Inch meter fees $ (160.00) $ (160.00) 8 Credit for Storage Assessment for two 5/8-inch meters $ (600.00) $ (600.00) 9 Credit for San Dlago County Water Authority capacity charge ror two 5/8-inch meters $ (4.008,001, $ 4,900.00 $ (4,008.00) $ 4,900.00 10 Abandon two 1-Inch services [Service Nos. 20583 & 80461_ 11 Abandon 4-Inch main and fire hydrant — $ 5.000.00 $ 5..00 12 Clly Of Nattcu ai C9y Vermitl- to $ 120.00 ' $''f kaf t10 $ 120.00 TOTALS $16,452.00 $ 52,904.00 $ 32,904.00 CHANGE ORDER C/O Number: 2 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: May 12, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Add 2" back flow preventer to water feed servicing water reclamation tank as outlined in JKA PR #5 and proposed in M+H Builders COR No. 7. Scope excludes steel enclosure $1,801 REASON FOR CHANGE: Not on original design, Sweetwater Authority requirement. COST RECONCILIATION: Costs were reviewed by the architect and City and negotiated to the satisfaction of the City. Construction Contract Accounting Summary: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders ($5,240) The Contract Amount prior to this Change Orders $6,969,345 With this Change Order request the Contract cost is lkick,"r15-er, cleareasud by $1,801 New Contract Amount $6,971,146 Change in Contract Time: 0 days Contract Completion Date: Recommended for Approval by: CONSTRUCTION MANAGER / R&S PROJECT AR Approved by: ems .-.. _ HITECT / Jeff Katz Architecture CONTRACTOR/ I'Karcotte and Hearne ilders Ntoe't 1 +—q Zoo 4- 16 OWNER/ City C National City Distribution: ity Of National City (original w/ all documentation) MH Builders (copy w/all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) Jeff Katz Architecture (copy w/aIl documentation) DATE DATE DATE DATE oolL1 [Lsn ON xl/Xll OL bL NOV V006/0L/90 MARCOTTE HEARNE BUILDERS, INC. May 10, 2004 Via Facsimile Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station #34 Marcotte & Hearne Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No. 007 Dear Sir: The contract adjustment required as a result of: PR #5 — Add 2" BFP, with steel enclosure, on water service line feeding fill line and water reclamation tank per revision drawing X-34. Change Order Request No, 007 is $3,5874 t,0 I 1/o C r The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work, Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Very truly yours/ Quotation Accepted By: Wayne Powderly /"" Representing: Project Manager Date: CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax; 858-793-4102 6/ Er-1 NdDT °716 'OOPS IT 'F,eN 70Tt761_ ° °ON XtJ_ 7N i SJ9G1 I flR 3NNNON 1 O7?J - ° Hf1?1.s ZOOPj [?.GEL Oy xafxl] 01. bL NON b00Zf0Lf90 JOB NO. 04-003 COR NO. 007 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 PR #5 - Add 2" BFP on water service line SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Add BFP and steel enclosure Paul Hansen $3,760 1(J%S SUBTOTAL 6% OH + P 1% Bond Premium $3,760 $188 se. $3,948 $39 Change Order Total $3,9871 1Sc'�1 F:/F.H i:fd0T `70 bCi0? 01: ?0Tt7g. XH:1 ANT sFFCtling 3NP7IyflH 71J 1R-iNHw7 wriN_] boo [4662. ON Xa/XI] 0L:171 NOW 400Z/0L/40 MARcoTTE HEARNE e, „ , ,ttic. SUBCONTRACTOR` DISTRIBUTION COVER rPAGE `1>5' PROJECT NAME: 1C'tCt--ikl, CITE( f iR-E S-rkr t- • PROJECT MANAGER: WA'yNE Ptrtnl[(L.L.`I SUPERINTENDENT: 'Oor1%IlJ . p 2TEQ TEL No: S - - 79 3 - `}-I o I FAX No: DATE: g- rrs - 4002. ATTACHED IS THE ARCHITECT'S RESPONSE'jOR • RFl # ASI # OTHER SUBCONTRACTORs AFFECTED: s $44- d aw0.sr ®5 NAME FAX No. POSSIBLE ADDITIONAL COST REQUIRED (YES/NO) PUSSIt LE ADDITIONAL TIME REQUIRED (YES/NO) 9 PP►w..1- 61614.1 — i €b 8,20whi ' 6Lal 447 0681 2 g 4 5 6 7 8 9 10 PLEASE REVIEW THE ATTACHED CLARIFICATION / DIRECTIVE, YOU ARE HEREBY DIRECTED TO PROCEED IN ACCORDANCE WITH 'f Hk ATTACHED CLARIFICATION. IF THIS DIRECTIVE WILL IMPACT YOUR CONTRACT PRICE OR SCHEDULE DO NOT PROCEED. RETURN A COPY OF THIS TRANSMITTAL PAGE WITH THE APPROPRIATE BOX CHECKED ABOVE -WITH -IN 5 DAYS OF THE DATE OF THIS TRANSMITTAL. NO RESPONSE WITHIN THE ALLOTED 5 DAYS WILL INDICATE YOUR ACCEPTANCE OF THE DIRECTION AS HAVING NO COST OR SCHEDULE IMPACT. ; F fir- t I.i;-;rvi? `r-'=� f' 'i`�.'. "Ft Pl_ l P T -77E, TN >:H.-I ENT `;'B Ql n2 b00ii [L6C2. ON Xti/M.] OL:bL NOW 1,00Z/OL/90 PROPOSAL REQUEST Distribution: x Steve Kirkpatrick x Howard Mills x Wayne Powderly x Jason Sanders x David Porter PROJ ECT: National City Fire Department Headquarters, Station 34 National City, California OWNER; City of National City 1243 National City Boulevard National City, CA 91950 TO: Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, Ca. 92121 PROPOSAL REQUEST NO. 005 DATE: May 3, 2004 ARCHITECT'S PROJECT NO; 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the Contract Sum and/or Time Incidental to proposed modifications to the Contract Documents described herein, Proposal shall be submitted in accordance with Article 26 of the General Conditions. Cost proposal shall be submitted Architect and Construction Manager no later than May 10, 2004, THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Install 2" backfiow preventer on water service Tine feeding fill line and water reclamation tank per Revision Drawing X.034, Reference Documents: ASI-05, Drawings X-34, dated 05/03/04 r ARCHITECT: Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER' RuOolphi & Sletten 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA 92130 i7r?P? RT ?PTt ) 7 '(?N SCFI-{ 711-1 E ° `1?J '900E0 4GEL ON XU/X1] oL:tt NOW VOOVOL/90 ;E3 10 SD 4" S 6" SD 2" BACK FLOW 4PREVENTO,R DIVERIER VALVE Jit.uz. It 3 .60 IE '.0 --CONNECT 4" PERFOR;A; D PIPE TO . 7-7 COORDINATE LIST. Jeff Katz Architecture FDC 38 VI GB 6" DOUBI:1 E-FECTOR CHECK VA .2" ,, ENTOR L 18%18" CB 35.89 IE 4" RD POC 9 IE SERVICE ic RD POC ,47 IE PF35,40 IE 6" 5,57 IE 4" NCRETE —CASE 1 /2" WATER'/ DOMESTIC °G. 7 4_4e 35.23 IE 4" RD 33.32 IE 12"x12" 3217. 1 5 TINUATIOt EE IRRIGATION P ONNECT NEW FT.. ND-THINn EXSTI NG DESCRIPTION .__. ..._ 2038 4768.64 48,51.7:3 W/ ANGLE PT, 2047 4775.82 4817.60 W/ ANGLE Pl. 2048 47667,76 4818.20 W/ ANGLE PT. T290 Navajo Rd, Suite 108 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619)69e-917B www,jeffitatzarOhlteCture,c0i6 National City Fire Department Headquarters Station 34 333 E. 16th Strt. Notional City, CA 91950 we. Arc pplernantal Instructions PROJECT NO. 011101 DATE 5-3 -*Q4 TITLE i ADDITIONAL BACK FLOW PREVENTOR SCALE 1 0=20' ASI-05 SHEET NO. X-34 dt...1c4OT : t70.0?_. ..,0T1-7M?: "ON XNN1 ONI SNOTITOF RINNUAN ONA)&N7 NONH 'SOO Ij LL6EL ON X8/X1] 01:171. NON 1700Z/04/90 E-1 11 ill ! I 111 Mak4. 05 2004 08:21AM YOUR Inn0 ; MARCOTTE HEARNE BUILDERS INC YOUR FAX NO. : 7934102 NO. OTHER FACSIMILE START TIME USAGE TIME MODE PAGES RESULT 01 16194470681 May.05 08:i6AM 04'41 SND 03 OK TO TURN OFF REPORT, PRESS 'MENU' #04. THEN SELECT OFF BY USING '+' OR 1-1. RN FAX ADVANTAGE ASSISTANCE, PI PAGE CALL 1-80B-HELP-FAX C435-7329). G/Sd WATT:?_0 1720?, ot 'Ftew FOTI7ZG: "ON ><d NISMAG-1Inq EINeid2H atiODNUW: NONA LOOlj ELSCL ON xa/ail] OLViL NUN 4OOZ/OL/90 MAY-06-2004 00;23 FROM-PAUI HANSEN EQUIPMENT +61944TOSS I T-14T P.001/003 F-812 0111 .rt;* r 11♦r IN MOW sE ENE -sr i+,A.CSIMILE TRANSMITTAL SHEET fCJ Ile �MLYY I.1tOM: Ted Blown COMPANY: Marcotte & Hearne Builder ] KnS PAX NUMRAR: 1 (858) 7934102 1)ATii:'ae nnAA 5 O6OT TOTAL NO. OR PAGES 1NCL UDSNG COVER: Jf Pi IONIC NUMBER: 1 (858) 793-4101 PAIR. NANSEN JOIi NUMB1"R N/A RP.: Nat. City Fire Sta. 34 Eualj t ri PR. #005 URGENT T VOR RI/V.11 V PLEASE COMMENT PLEASE REPLY NOTES/CQMMRNTA: Wayne: If a cage is required on this backflow you need to add both quotes together. Ted 603 SO. MARSHALL AVE , EL CAJON, CA 92020 (619) 263-7191 FAX (6R9) 447-0681 6ig_ d NdTT 17e47E. 0T "h�N ?0Tt' E .. "ON Xdd ?NI S242a1IfE 9N itI9H 9 _1.069Hk1 ° WDad '6 0 0 in [,L6C2. ON )(8/)(1] 01.:171. NON DO OZ/01./9 0 MAY-06-2004 09:24 FROM-PAUL HANSEN EQUIPMENT *6164470681 T-I47 P 003/003 F-313 SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST Ewe O/5/2.004 REQUESTED MI Nieman + Hearne Builders, 11696 Sorrento Valley Rd. Suite 200 Sou Diego, CA 92121 Aftn;Wayne Powderly PROJECT NAME: National City Fifa Station 034 LABOR: Attach tokti.off oheet if CHANGE IN WORK NOTIFICATION NURSER: PR MOOS CONTRACT NLINDIRRI PHI Job a D37-04 instati Cane on 2" Baddlaw it Required NEP NUM Llikfli CLASSIFICATION HOURS , at1.0 a1.5 x2.0 OFF. HOURLY PATE LABOR COST 1 Laborer Foreman 2.5 i $ 75.00 $157.50 2 Laborer General 15 $ 52.00 $120.00 3 $0.00 4 $ $0_00 5 $ .. $0.00 6 $ ., $0.00 7 $ $0.00 8 . .. $0.00 TOTAL LABOR: MATERIALS: (Atlach take -el shetat) 5318 RE 1 2 3 4 MATERIAL DESCRIPTION Enclosure S$30 If Required Anchors ,$$ Oa* Bolts QTY 1 4 UNITS ES. Ea: UMT COST $ 1,358.00 $ 2115 $ RATERIAL COOT 51,358.00 $11.40 $0.00 $0-50 5 8 $0.00 $0J30 7 $ solo 8 5 $0.00 $ $0.00 10 11 5 5 00-Q0 $0.00 12 is 5 $0.00 $0.00 Line I OTHER COSTS: (AttPch itemized informatipn) TOTAL MATERIAL: (7.75% at U1113 2) SALES TAX: TOTAL LABOR, MATERIAL, AND .ALE 'fAX MARK-UP ON LABOR AND MATERIAL $1),3119 $100 strva $260 REP DESCRIPTION GTY UNITS UMT COST arum COST 1 a 2 3 $ $ 4 6 $ $ a $ $ $ - $ SUBCONTRACTS: (mom Subcontractors proposal) REP SUNCONYNACTOR NAME foesc1aP11ow TOTAL OTHER COSTS: MARK-UP (Sum of Lim 4, 0, am SUBTOTAL: SUBCONTRACT cora $ 4 SUBMITTED Er. Theodore A, Brown SUBCONTRACT COSTS: 50.00 $0.1:10 MARK-UP: (Total of unes 9 and -lin TOTAL SUBCONTRACT COSTS: (Total ofUr 8 and 11) GRAND TOTAL: TOTAL CHANGE REQUESTED eV SUBCONTRACTOR DATE! 0/0/2004 Line 0 Line 10 Uno Line 3 Line 4 Line S $0 Line 6 Line 7 Uno 8 (./ $0.00 $2,002 $6 $2,(102Ium. 002 G/Ed W,ATTFO t700?, 1T 7..0it7E52.. 'ON XHA N J. SACI-1111E1 .!,Pb-1 110.7)NUN: 1.10?J. ' 00UHL ON Xa/X1) OL:hL NOW tO0Z/OL/9O MAY-08-2004 08;23 FROM-PAUL HANSEN El1UIK ENT SUBCONTRACTOR POTENTIAL CHANGE REQUESTED BY: Malcom +14r4s to Builders. 11696 Sorrento Valley Rd. Suite 200 San Diegez, CA 93121 Attn:Wayne Roadedy PROJECT NAME: National City Fire Station #34 031114470881 T-147 P.002/003 F-313 ORDER REQUEST Data: 5/6/2004 CHANGE IN WORK NOTIFICATION NUMBER: PR #005 CONTRACT NUMBER: PHI .sono 937.04 Inatill 2" Saak6cw on seevIca to reclamation line LtW REF Hula 1 #rG. IHLUIW I n9M16`U11 MOWS 11 110V Vv.+/ LABOR CLASSIFICATION HOURS x1.0 x1.5: x2.0 RIFF. HOURLY RATE LA OR DOST Laborer Foreman 8 3 75.00 $450.00 2 Laborer General 6 $ 52.00 $312.00 3 ! : - $0.0 4 - $0.00 $0.00 8 $ - oo 7 - AO 8 .. $ - $0.00 tsr.. 1 Ac„hf. MATERIALS: REF 1 2 3 4 5 e 7 10 Bend (Attach take -off shoo MA7EIAW DESCRIPTION 2" 114 Type K Pipe 2" TAM Ft Cuter Hard Sleeve 2" Pot Union 2" Brass: Baddlow 2" Watts 00$ RP emir "' ` Silver Adapter 2" MIP X C Concrete Pad& Sts ets Tape 2" 1 Mill 4.: 20 1 2 i 1 2 3 1 LIWM Ea. Ea. Roll ea., Lb. Ea.. Ea Roll UNIT COST $ 5.85 $ 6.46 $ 31-00 $ 15-80 ,4 263.55 .00 5 31.60 $ $ 6.00 9 • MATERIAL CG8T $23.40 $129.20 S31.00 $31.80 $265 66 11 $38.00 S63.20 $75.00 $3.00 $0.00 - $0.00 12 13 OTHER COSTS: REP 1 2 3 4 5 6 7 (Attach itemized information) DESCRIPTION SUBCONTRACTS: wench eubaznarmator'a •pas, IA ripp IU NYRA T0R NAME s DEStRIFMON $ $0.00 $0.00 TOTAL MATERIAL" (7,76% of Line 2) SALES TAX: TOTAL. LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIAL 4TY WATS' 17FU1 T $ $ OTHER COST $ $ $ - $ $7$21Une1 $863 Line 2 $61 TOTAL OTHER COSTS: MARK-UP; (Sum of Lines 4, 6, 8,7) SUBTOTAL: swomQNTRP T Mar 1 2 $ 3 4 SupMITTE0 SY: Thoodnro A. Grown I t77 �431 $UBCONTRR1CT CO$T$: $0.00 Line 9 MARK-UP: $0.00 Line 10 (row Qf Lines 9 9nd 14) TOTAL 13U16C0NITRACf COSTS: (Total bf Urea 8 and 11) GRAND TOTAL: SO `$1,696 Line 3 Une 4 Un• a t/ $0 Une 6 .OQ Linm7 Ulm $01Une 11 $1,688,Line 12 TOTAL CHANf3B REQUESTED BY SUBCONTRACTOR: $1,898 DATE:! 5/6/2004 N };F=,. )N r 7N>iNP,H a 1_ I_QD?1HI•J J 7�I j CHANGE ORDER C/O Number: 3 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: May 20, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. All work associated with the modifications to the dead end at C Avenue by 15th Street specifically as outlined in JKA Proposal Request #3 dated April 23, 2004. All work to be performed in compliance with contract guidelines. All demolished materials to be removed off site. All areas to be restored to a clean condition upon completion $23,662 REASON FOR CHANGE: Scope of work required by City not shown on original documents COST RECONCILIATION: Costs were reviewed by the architect and City and negotiated to the satisfaction of the City. Construction Contract Accounting Summary: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders ($3,439) The Contract Amount prior to this Change Orders $6,971,146 With this Change Order request the Contract cost is increased by $23,662 New Contract Amount $6,994,808 Change in Contract Time: 0 days Contract Completion Date: Recommended for Approval by: i2ko OTRUCTION MANAGER / R&S PR ECT ARCT--IITECT / Jeff Katz Architecture Approved by: CONTRACTOR/ Ma Otte and Hearne Btders OWNER/ City Of National City DATE DATE DATE DATE Distribution: City Of National City (original w/all documentation) MH Builders (copy w/all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) ��� 1.0Q [V8gL ON Xa/X1] 89 VI_ NON VOOZ/L1/40 MARCOTTE HEARNE BUILDERS, INC. May 17, 2004 Via Facsimile Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 RE: National City Fire Station #34 Marcotte & Hearne Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No. 004Revised Dear Sir. The contract adjustment required as a result of: PR #3 add turn -about at north end of C avenue. Change Order Request No. 004R is $23,662 The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE proceeded with this revised work, Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned, Very truly you r$/ //Jy Wayne Powderly Project Manager Quotation Accepted By: Representing: Date: CO Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11096 Sorrento valley Rd., Ste. 200, San Diego, CA 92121 fel. 858-793-4101 Fax: 858-793-4102 F.P1Tt' S7174. ' SR: OH XH.1 =Ii.7NH_PH 1! i fl H1..1 7 I, Ifl?i-I ZOO 1 [089L ON Kit/K1] 84:131 NON b00Z/LL/SO JOB NO. 04-003 COR NO. 004 Revised MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 PR #3 - added turn about at end of C avenue SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE A Added concrete Big Hom $6,085 Added rebar - none needed Minshew $0 added earthwork & demo Whitlock $4,599 a added paving JD Paving $7,356 added surveying Adkan $1,480 a added fencing Crown $1,968 a added utilities - no change Paul Hansen $0 r rental of trench plates for residents driveway M+HB 8825 [+I IttT/1T/,1 ell 111 5% OH + P 1% Bond Premium Change Order Total $23,5621 $1,116 $23,428 $234 ) T, 7'11T17.7 C'E,) R P.. ^r iiJ 1'�I-! :�t.IS,I-'�I-I 11 1f7T H1.1; 1700El [LOEL ON X!I/X1l LL 91 03A 1700Z/90/90 PROPOSAL REQUEST Distribution: x Steve Kirkpatrick x Howard Mille x Wayne Fowderly x Jason Sanders x Frans Thomassen PROJ ECT: National City Fire Department Headquarters, Station 34 National Clty, California OWNER: City of National City • 1243 National City Boulevard National Clty, CA 91960 TO: Marcotte + Hearne Builders, Inc, 11898 Sorrento Valley Road, Suite 200 San Diego, Ca. 92121 PROPOSAL REQUEST NO. ' 003 DATE: April 23, 2004 ARCHITECT'S PROJECT NO: 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the Contract Sum and/or Time Incidental to proposed modifications to the Contract Documents described herein. Proposal shall be submitted in accordance with Article 26 of the General Conditions. Cost proposal shall be submitted Architect and Construction Manager no later than April 30, 2004. THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1, Description: Modify the northern termination of C Avenue in accordance with the attached revisions drawings X-03, X-04 and X-05. Work Includes demolition of curb, gutter, sidewalk, driveway apron, fencing and paving, as well as construction of new curb and gutter, as well as replacing sidewalk and driveway apron, and installation of new fencing. Be advised that the demo work must be scheduled to allow continued access to the driveway on the west side of C Avenue, to the greatest extant possible. Contractor shall coordinate with resident on timing of demo and reconstruction. Reference Documents: AS!-03, Drawing X-03, dated 04/22/04 ASI-03, Drawing X-04, dated 04/22/04 ASI-03, Drawing X-05, dated 04/22/04 ARCHITECT: CONSTRUCTION MANAGER: Jeff Katz Architecture Rudolph & Sietten 7296 Navajo Road, Suite 106 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA. 92119 San Diego, CA 92130 �Z/t2.d .:O b007_ SO `Fce11 ZOtih£5J_: '0N Xdd DNI SL3Q1Ifl6 3N4kl3HI a1.10JauL: frIOlJ 900 [LOEZ ON Xa/X1] LL 91. 03th 1700Z/90/90 2 aUiviiH 2,4.7 3 FI1vl \ 21,87 1E .1T" r, . C 33--:\ \\ h1 -- `"ll'REMOVE CURB GU fTER,', ! -- = SIDEWALK, & AC. 12 RCP 19.75 FL �,.:_�_..'r�2r ~u HEADWALL -�(F �_ 5•9 J' I 24"0 TREE — ` / 2"0 TREE / /24.57 6 / SW� TREE, -�"" - 19"+2 TREF -' 4 0 —, r TREE REMOVE 4"0 TREE 7290 Navajo Rd, BUM 106 - San Diego, CA 92119 Office (819) 698-9177 - Facsimlln (010) 698-8178 www joffke[zarchhech,ra.com 1 r "0 __— PALM PALM REMOVE-EXIST1c4C• FENCING — �� �' 'r' 4 -� 7 SAWCUT SAWCUT wm� 1T' DEMO PL'N National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 TinCafar PROJECT NO.: 011101 me 4/22/04 mu: Revision 9 C Ave SA' Mititioct Supplomeatal Inetruttiorra AS1-03 1:20 SHEET Na. X-03 oF./sd WdOT °2O t43 F SO `F117• I E@Tt E:61..: 'ON > d 'lN Sa3OE i I f1H 3N?J173H 3110:PJHW L•1Oa.J 900ljj [LOEL ON Xa/X1] LL:9L 038 boot/90/90 24.73 RIM ' %1.:i If.:1.,,, \ C RELOCATE 5 'TYPE,~ INLET ;4 •18 7&TORM DRAIN' PER" -• APFRED--RROdECT fX-5s8, _- 11 15" CR1!SHEI D�/ -- NCRE• '' , DRII,E otT .G=14 40 -- SIDEWALK PER G-7 TREE PALM PALM CROSS•GUTTER P .-G ..1'3, ,.. 9 4- J r• SITE PLAN CURB 'DATA `i d . _. RADIUS, POI RADIUS DELTH LENGTH _ 1 2 7280 NsvaJo Rd, Suite 106 - San Plage, CA 92119 Office (019) 993-9177 - Facsimile (619) 098-9173 www.jefikatzarchltscsea com 30.00' 29.50' 3734'36" 192'59'06h National, City Fire Department, Headquarters Station 34 , 333 E. 16th -Street National City, CA 91950 17,06' 99.36' Amen:act hupplan.iW1 Instructions mum" N0.: 011101 WE: 4/22/04 ram Revision 0 'C' Ave ASI-03 scold: 1:20 SHEET NO. X-04 1 1 £ /3d Nd?T" 170T' E :: 'ON Xd,d JNI NaH3H WON.: LOOT] CLOEL-ON Xif/Xll LL 4L 03M VOOZ/40/90 'lI ;I DiYII !".I''i if 111 I-1 I'III'I NO. OTHER FACSIMILE 01 16195790955 02 17O0727B330 07 1 I1 QSG.1 Q7SQ Apr. 23 2004 11;05AM YOUR LOGO MRRCOTTE HERRNE BUILDERS INC YOUR FAX NO. : 7934102 START TIME USAGE TIME PAGES RESULT Apr.23 10153AM 01'51 05 OK Apr.23 10:55AM 01'59 05 OK Llr,w- 10_S7C1M 01'dR 'MS rIV EXTEND EXIST. FENCING TO DEFLECTION WALL- 0 awaegaR DRAWINGS 1 CIVIL DRAWINGS -mu) NmvaJo Rd, Suite 1U6 - San Diego, CA 92116 Office 018) 698-9177 - Facalmlla (819) 899-9179 www.jelikat2aich hocture_rnm SI; UCE CIVIL ,' DRA th 11 National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 J »nm I eizzoo.ftct I'4 O111O1 DATE: 4/22/04 Tm.E- Reavlolon °G° Avis orcrecvice 8., pl ml llvtntouow ASI-03 _. eCALE, 62O 81-4MT NO. X-05 143 ?P S7` SL. :. 'ON S;H_-i "h;j S2f�Q�IfF .3,110D?4UN:. ! O?LZ E00 0 [1789L ON Xa/Xll E9 trL NOVI tr00Z/LL/90 Jan 02 70 09:02a lehorn canstrucion camp. 7G05917514 p.1 BIGHORN construction co.. Lk. # 597866 762 Poinsettia Ave, San Marcos, CA 92069 • FAX .COVER SHEET DATE: _,cl TO: .•/j_ N PHONE: FAX: FROM;4.rf-010- PHONE: FAX: • . Number of pages including cover sheet (760) 727.8837 FAX (760) 727-8.330 q s g' 7a -. Message c7 /g 770 b70 70Tb zE:1 OcS. `ON Xd-� ENddN aliODNUld: I.JON_.d 1700i8 [V89L ON Xi/X1] E :bL NOW toO /LL/40 Jan 02 70 09.03a 762 Poinsettia Ave. San Marcos, .CA. 92069 5.17-04 lghorn construcion clomp. 7605917514 IIGHORNN . construction co. Lie. # 597866 To: Marcotte & Hearne 11696 Sorrento Valley Road Stc.200 San Diego,Ca. 92121 Attn: Wayne Powderly From: Drew Olwell Re: National City Fire Station Subject: P.R. #3 REVISED Radius Curb & Gutter 120 E.F. at $23.00 Concrete Driveway . 150 S.F. x 10 Concrete X-£'cutter 120 S.F. x 10 4" Sidewalk 125 S.F. x 5.00 Total. $6085.00 Drew Olwell 2760.00 = 1500.00 1200,00 = 625.00 $6085.00 P.2 (760) 727 8837 FAX (760) 727-8330 F.OTb.S6 BSs °ON >;H_! �N�1H�H a_I_ LnoNdUJ : HflN =ROM :MRRCOTTE HERRNE FAX NO. :850 793 4182 May, 17 2004 82:52PM F5/13 NOWOOSOmplOVV6.difEWAYMOI tatithia Med WOW" , 40a114:14 VWa.v V7 aVe 'QV 4447,4FPNWMOn ..,:401 PR1N00 )100011,4i C't aDed IndOR:t 170-K-JdY Ed Wbsi:80 170W eZ e5Bd !INV98:L 170-Ds-Jdv .409" 00g1C1 W0110 ,f3A4*i C0.3....ruemat ... 1.14.{.{5,W,..3[811...prOptesft.....43• bLcT V niaer / v 4). i; OfiVal 01400 Ottilain0111101"-"--7-443314 110111117N71024i; gwylitY4lenve• 111,•4114b..111 ,47("42a...• 014 • 0 / 14" ha- •atii0',. oel i 1: F . i ) . . I 1 I i P I I: r c _ 1 E- , . 990004SOI9 !: ZOTO2GL! 'ON XUJ NI miwillne 1•721L19H a1i1ODUHW; ! 8561364961.9 4. 05/17/2004 MON 14:53 [TX/RX ND 7584] R1005 ! :Re was 406. :A8ue 90021 [V892. ON Xtd/X1] 69:171. NO 1700Z/LL/90 Sent By: ;. .• oKU'LTTHSIRNE aUkDERS INC FAX NO. :7934102 6195790955 ; Natianal City O'ire Station #34 MarColts 4- Horne Builders Inc. SubcOnttactor Chapge Order Break Down Analysis COR * 2 Apr-30-04 7:35AM; Page 2/3 Apr. 29 2004 00:15AM P2 PR #1 - Revised 800all P.O.C. per ODO&E shop drawings Malenals: Item 1 a item 2t Item 31 Item 41 Rem 3r Equipment: Item 1 Item 44919c.) :I Item 3 2 2l ,,,, , itteemni : 9Q )y Labor: tA} Class Type Class Type Class Type Class Typo escription , Qescription Unit Cost QTY (jrid. Tax) Total 201/ et" c'° 215-6EW. • ggsa as • Ram...y...5 woe em.i Slat a SUBTOTAL "A' 400 . QTY - Unit Cost jel (Irtc1; Tax) Total 1.VerliW1111111111 ; ..11.vre rosn 00 SUBTOTAL 18" 253,-Thie Prey. Wage iL P<JAAWII:-04 HriS Balia Rate Total 0. IPS OommerPlat Genlorel Liability and Properly Damage Insurance Worker's Compattsailon Insurance octal SeOurIty arid Unemployment TEMOS SiuBToTAL"C" 11613, ef 200, P SUBTOTAL "D" Settz Total Subcontrcator Change Qrder ta.4.54t- 067 et work Cfr-244/111 SUBTOTAL A++O+D 4-4(09-57-- ni7 Subanntractor Mark Up 15% 7j s...-}1 C1/46Ii rziw---2077,71 11"oed Id; T FOT REL 2s9: "ON XH,1 'a,le1HDH LOOEL3] [h84L ON XN/Xl] E9 bl NON VOOZ/LL/90 Sent By: ; Pion' :rCO.TTE I--RRNE BLIkI_DERS INC &ellt By: 1 (f i ILL CIr'G1vN AC ITAng !NC 0195700955 ; FAX NCI. :7934102 t9194790455 Apr-30-04 7:35AM; Page 3/3 Rpr. 29 2004 051:16RM P4 Apr•26•o4 1169PM1 Page 2/2 LICENSE NO 572217 } p MESA, 2322 �,y.�M EXCAVATING ry44LA MES•nA, CA .PL74Jg44R��.GpYt� y�.� �y� EXCAVATING Y�CL D IIIENI2LITjtpivl j ► REQUEST FOR CHANGE U TEDER No, 876-7 i t ij AhUT'H flIZA7'TC1N FOR CHANGES IN P'LANIS OR SPECIFICATIONS J£ B w*iton ttyyjrft Stttinti A#DAE'SS 113.0,,. 1.8i°.131r , YAiGt rso Itd$by �d 14 /WIS the Ibl luwlrl8 changt4 from Plana agdlor Speen:glens or Contract %yee P iwderly Ile & Mune • :p tha underniB"oid tops), to the mite, ur Nome* contre:1114. h , dtw !Mai await unit 48S.Oa Wilhin 30 daftISwn duiitatehomord_dhuuttl uaddep'ncdfoniuRAY ■nuttcaatrnennc,dtt!in+cmlwdodnrometrt.nn wadunewend !udn urrdkmr due Omit hear iniinron a1 dui tuft of MI ndi YAW km mm done. Skouhl nu aueunerg Tea Mahon to enforce my (uudpiamiroc, UM' nM1a Nunn/ aii' lb pity ail and! of �Ilmuiun Including a removably ullWiiey's'dra The uad �iau9oidatiunisminiq.r gdthcOwtrd mow*dr,el aldraquaei w• ipe chlota Eft obi nu signer thelainsotidi +pegl,6o=dt t�oGfirm aid/ar ti[m e8 r1sc atill'nhmu lwnhr eonrdrh�.r�tkino,tt p6 ord r ba si�tod lfY moue than awpy�pp Y41FciitPTKJN ur t,-;mik4ine tall tuonl tewit&r �lJbltlalition and irading per AST-O3, sheets x-OJ & N 0d. DATE 4I28lo4 CAlVC31AS JL1017IFICrATIoN8 AlX7VF; ARE APPROVED AS TO TYPE AND PRICE, OWN6R t• i 14,.47 �n y2P17, T el pTt' F% RCP. .(ems.! YH BOO [V89L ON Wu.] 69:171 NOW VOWLL/90 sent By: oleofwuw0.0, Apr-'dts-uq. rage 1/2 PAM .:10MPANY: AZOM- WHILL Oa( CONTRA CMG, INC'. imam i46, 722 I P.O. 'gat .2322 LA MESA, CA 91943-2322 $79-000 FAX 5.79-0985 EXCAVATINe • PRADINIrer• • OEMOUTION ..,milszo..s.6.1a••••••• ipTAL NUMBER OF SHEETS: 2 MICWIDNG COVER PAG perecio2nlilaa ymma.A.11•••,& "WE'VE DUO, SAN DIEGO SINCE THE 80 'E'r £T/Bd Wd2S:E0 7D?J LT 'FIL4 ?ATP BOO 1 [15,89L ON xi/x1] ES:bt NON bond/LL/So FROM :JD PAVING FAX NO. :7602332994 May. 17 2004 09:OBAM P1 JIIPAVING, INC. TO: Marton & Hearne Builders Altus Wryne Powderly 601.041M0793-4102 THIS BID IS AT PREVAILING WALE RATES, CA LIC# A682554 PROJECT; National City Main Fire Stu. No34 333 E. 16th Street, Nutianul City, 91950 Proposal Request #3 OUR BID NO.04-034A rev.l BID DATE 5/17/2004 PROPOSAL REQUEST 43 SCOPE OF WORK (Are.0 tern-ebaut): ITEM # I FINE GRADE, FROM PLUS OR MINUS ONE TENTH OF A FOOT $ 1.00 1'$ 1.00 PER S.F. (Scarify & Re-Compaet),ESTIMATED QUANTITY 1,575 S.F. ESTIMATED COST ITEM # 2 PAVE WITH 41/2" ASPHALT OVER 15" CLASS II BASE 53.45PER sae. ESTIMATED QUANTITY l,575 S.F. ESTIMATED COST ITEM # 5 APPLY 1 COAT OF ASPHALT SEAL 212 $ 0.22 PER B.F. ESTIMATED QUANTITY 1.57:1 S.F. ESTIMATED COST $1,575.00 $ 5,434.00 $ 347.00 PROPOSAL A$OURL r #3 RID PRICK $ 7.3116.00 NOTES: I) THIS PROPOSAL IK CON'rIPIGENT UPON REVIEW OF APPROVED PLANS, SPECS AND SUB -CONTRACT. INCLUDES: 1 MOVE -INS TO'FAIa, (Additional move -ins will be ohnrged at $1,10O.00 per). EINE GRADE (Scarify & Re -compact) HERBICIDE, TRAFFIC CONTROL FOR J.D.PAVING WORK ONLY (Excluding traffic control plans or permits), normal cleaning, MATICRTA1 S & LABOR. THIS PROPOSAL TO BE PART OF SUB -CONTRACT. MATERIAL PRICES EXPIRE ON 07/01/04. EXCLUDES: PERMITS, PLANS, TESTING, ENGINEERING, SURVEY, BOND & FEES FROM SAME, REFLECTORS, REFLECTIVE BEADS, RASE MATERIAL UNDER CONCRETE WORK, CURB PATCHBACK, WATER SUPPLY, SAW -CUTS, SAND, REMOVALS, STRIPE, SLURRY SEAL, ALL SIGNAGE, PETROMAT, TYPE J PAVING, LIME TREATMENT, POTHOLING, WHEEL STOPS, DUST CONTROL (Except fur our work), WATER POLUJTION CONTROL, EROSION CONTROL, TRAFFIC CONTROL, 'USA' MARKOUT, CONTINUOUS SWEEPING, PCC WORK, AC GRINDING, LUMBER RAMPING, BACKFILL & COMPACTION OF TRENCHES & CURBS, OFF -SITE WORK, TYPE 2 SLURRY, ALL UTILITY MARK -OUTS, CHIP SEAL, RESTORATION OF RIGHT-OF-WAY (Limits or Ulexonsions not shorn on plena), SWPP AND ALL ROUGH GRADING, PROPOSAL ACCEPTED: DATE: (Optinail! ADD cur bona vete or 1.2•l„) Ras $11MON8oN, ESTIMATOR cell # 760.427-9869 14X2 D DRIVE SAN MARCOS, CA 92078 P1'$ (760)233-2980 FAX (760)233-2984 ST/6d NNddES17400E 4T. `5ri C 70Tt' f G4 B 9: ON X.N.71 111,-1 „PFi a l I flT NEH' oto i [1789L ON X8/Xl] 69:171 NOVI tOOZ/Ll/90 APR 30 2004 9:21AM HP LASERJET 3200 s ddkari CIVILENGINEHRING 0 SURVEYING ❑ YLANMNG E N G 1 N' tM R S 6820 A RJURTD11V , RIVERSIDE, GA 92504 TeIt (909) 688-02A1 a Fax: (909) 688-0599 adkan EN/NEE-Rs PROPOSES TO FURNISH ALL MATERIALS AND PERFORM ALL LABOR NECESSARY TO COMPLETE THE FOLLOWING: PROPOSED PROTECT National City Fire Station, #34 FOR Marootte & Hearne Builders Proposal Request #3 Attn: David Porter Fax: (858) 793-4102 Mark. Sawcuts—One (1) Move p.1 $ 0 oar t.' t Stake New Tarn Around --One (1) Move CV - 1,280.00 C.10..4..-3 5t2 I> Cale New Turn Around 200.00 Printed Name: Dante; > Established in 1983, completion of over 5,000 survey projects. ➢ Ability to provide a survey with less than 24 hours notice. Emergency crews available on a 1-hour notice (most cases). > Currently running up to 12 survey crews. We carry errors and omissions insurance for up to S2, 000, 000.00 per occurrence. A Union trained and staffed. > All surveyorsvehicles' have cellular communication abilities for quick response to questions and problem handling. Y UPS services available for all jobs! SUBM1TTED BY'. LUMP SUM TOTAL: $ 2,080a FORD McDONALD DATE: 04/30/04 CHIEF OF PARTTFS THIS PROPOSAL IS BASED ON ONE SET OF STAKES. RESTAKING WIr,r BE DONE ON AN HOURLY BASIS AT OUR CURRENT HOURLY RATES. THIS SCOPE AND PRICE IS BASED ON ONE MOvI3-IN PER LINE ITEMS UNLESS NOTED OTHERWISE, MULTIPLE MOVE -INS CREATE MORE WORK FOR US THUS WE WILL NEED TO NEGOTIATE MULTIPLE. MOVE -INS, THIS PROPOSAL IS SUBMITTED BY RD ADKISON, A LICENSED LAND SURVEYOR (LS 5390) AND PRESIDENT OF ADKISON ENGINEERS, INC., A CALIFORNIA CORPORATIONdbv 3s+ =sr.,to ENGINEERS. 6644.prp Ettt.doc £T/1Td NdbS:a 17210F. LT "Feld Committed to Client Sutipfaction EOTtY 26 _ ess: "ON )(HA 7NN1717H _I_.l ]:i? N : NONA LL' [ 89L ON Xa/Xl] E9:tL NON b00Z/LL/90 HI-!X Ei 2UU. 3:41RM HP LRSERJET 3200 p CROWN FENCE COMPANY PROPOSAL DATE 4/29/04 6415 MARINDUSTRY DR. SAN DIEGO, CA. 62121 PH. 868-462-6690 FAX 885.462-3800 LICENSE # 1315 CLASS C.13 EXP, 3/31/06 PROJECT COMPANY: NATIONAL CITY FERE DEPARTMENT 034 MARCOTTE & HEARNE BUILDERS LOCATION CONTACT NATIONAL CITY JASO1' SANDERS PHONE (85g) 793-4101 ADDENDUMS NOTED: FAX (858) 793-4102 IMPORTANT NOTICE: Due to the current and unpredictable increases In the steel market, the pricing costs quoted herein are subject to change if not accepted and materials oredered within 15 days of this quote. CR61 eW grIzi6P do. WILL IINSIALL THE FOLLOWING : INSTALL, 70 L 11. X 6'X-9 GAUGE X 2" MESH GALVANIZED CHAIN LINK FENCE PER CHANGE ORDER REQUEST TOTAL INSTALLED: $1,967.97 , Y-"F PLEASE SEE SUBCONTRACTOR BREAKDOWN ANALYSIS 2311 Wromd AAraf NOTE: EXCLUSIONS AT BOTTOM OE PAGE d 6-4-f. THANK YOU, MONTIE WOOTEN PROJECT ESTIMATOR EXCLUSIONS : ENGINEERING & CALCULATIONS, PERMITS & FEES, CORING OR CUTTING OF CONCRETE & ASPHALT, PATCHING OF CONCRETE OR ASPHALT, SURVEY & STAKING, MOW STRIPS OR CURBS UNDER FENCE, SIGNS, CLEARING OR GRUBBING, OLD FENCE REMOVALS, TEMP. FENCES, GROUNDING OF FENCES, KNOX EQUIP.,PADLOCKS, PANIC HDW, T/TTd WdtS:Ef bWWz _� "FiPN `@ z�Tb S:61 8S8: `ON XI.-i dNIH=1H.I_IO'l?!Hl;: ZLO I [1789L ON X8/X1] 69 VT NOW D00Z/LL/90 FEPR c9 20D4 9a41FIM I • FROM ;MARCOTTHEARNE HP LFMSERJET 0200 FAX NC, :058 793 4102 Apr. 29 26:d4 08:29AM P2 National City Fire Station #34 Marcotte + Hearne Builders Inc. Subcontractor Change Order Break Down Analysis COR # 2 Worts Pit #1- Revised SMILE P.O.D. per SDO&E ahop drawings Description tem 1 2 7/8 it 9 POT tem 2 2 1/8 x Rt.6" 'PORT fern 3 A' x a CA. 1r7tlrar.v. ten 4 6' TRNSTON PARS tern 5 MWSC FiTTTVCS EgUIPMent; Item 1 Bern 2 item 3 !tam 4 Item 6 Labor: Clare Typa „joTrlRNWY MA (POP1W4Nl Claes Type JOTTRNTry MAN (T.Ancrimi l Class Type J nAnNsc Class Type 17-STT+w4TrniTitn T1:rT MANACP..R Unit Cost OTY (incl. Tax) 2.. _56 .62 6 3.5,00 f:14AT11Tr,TNit 7n t tiara_ 2 .0D. UBTOTA tQ SL'A' Total 117-34 ,Z 10,00 ABA 30 12 cQ0 35.0p 772.64 QTY - Unit Coet Description HOURS (Incl. Tax) Total a roil mum 0,Liqgx TOQZ s_ 6EW 2$ nq 1611J10 flT 1r MAr 1TNR UPS. 25,.D(1. 75.00 HRS 6 6 SUBTOTAL "6" Prtiv. WAge Base Rate Total 4R.48 24n,a8 46.no 776 1)0 28 7b ..7$ 7• 97 5.0 SUBTOTAL "C" 193,00 Commercial General Liability and Property Damage Insurances Workers Corrtp*nsatton Insurance Souls' Security and Unemployment Texas 1gn.ort 745,64 FIpURED IN BASE AMOUNT SUBTOTAL "D" SUBTOTAL A+D+C+•D 1, 711,35 Subcontractor Mark Up 15% 256 �9 Total 8ubcantrcator Change Order' 1,96Z, 9 r/ j P•2 ST/ETd f:Jd17S:E0 1700E LT 'hleW ?®TV £6L BBSB: `0N Xd.d 0NJd3H D_LIOD N : W0?Nd ROM :MARMITE HEARNE FAX ND. 253 793 41E2 May, 1.7 22iO4 02: 55PM P13/13 69-. t6W-•O8t4LR) Win SODS) AN VD a7Qauzameg SiSL•OS'E (p Oltr -no o0ax' 1'QQt3'ZLL 10Oti )4064ft (LL81 vO nrryvan / Y-1 Lwau ttLVlr1ZL MAO salauy ax+^' un a Sii i,vi7deY �..das urar 9'1l OH:. 0J J.Na$= 1 d SIN top a = OQIINODS3 ddl EOL690499LT LP:PT POK/9O/S9 05/17/2004 MON 14:53 [TX/RX NO 7584] e 013 CHANGE ORDER C/O Number: 4 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: May 25, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. All work associated with the modifications as they relate to adding brass slide pole from mezzanine to first floor. Scope of work included in this approval is outlined in Jeff Katz Proposal Request No. 004 dated May 2, 2004 with amendments to sheets X-22, X-23 and X-33 dated May 4, 2004. $13,231 REASON FOR CHANGE: Scope of work required by City not shown on original documents COST RECONCILIATION: Costs were reviewed by the architect and City and negotiated to the satisfaction of the City. i..VILbl1L1Ll1L)1L L.UlLLL[LlL n- 11 v.aaa .. The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $20,223 The Contract Amount prior to this Change Orders $6,994,808 With this Change Order request the Contract cost is increased by $13,231 New Contract Amount $7,008,039 Change in Contract Time: 0 days Contract Completion Date: Recommended for Approval by: ;Q. EL4. CO STRUITION MANAGER / R&S r PR Approved b Al HITECT / Jeff Katz Architecture r , 1 CONTRACTOR/ 4larcotte and Hearne ilders OWNER/ City f Tliationa City DATE DATE DATE DATE Distribution: VCity Of National City (original w/all documentation) MH Builders (copy w/all documentation) Rudolph and Sletten, lnc. (copy w/all documentation) PROPOSAL REQUEST Distribution: x Steve Kirkpatrick x Howard Mills x Wayne Powderly x Jason Sanders x David Porter PROJ ECT: National City Fire Department Headquarters, .Station 34 National City, California OWNER: City of National City 1243 National City Boulevard National City, CA 91950 TO: Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, Ca. 92121 PROPOSAL REQUEST NO. 004 DATE: May 2, 2004 ARCHITECTS PROJECT NO: 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. Proposal shall be submitted in accordance with Article 26 of the General Conditions. Cost proposal shall be submitted Architect and Construction Manager no later than May 10, 2004. THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Modify the Wash Room and Laundry Room area as indicated to incorporate a slide pole. Revisions also include modifications to the layout of the restrooms and Firefighter Association Storage on the second floor. Reference Documents: ASI-04, Drawings X-as thru X-33, dated 04/28/04 ARCHITECT: Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER: Rudolph & Sletten 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA 92130 NOTES: O. PROVIDE 2 I/2 BRASS SLIDE POLE, BY MCINTIRE BRASS WORKS, PROVIDE WITI-I CUSTOM LANDING MAT, FLOOR AND CEILING FLANGES (MCINTIRE BRASS WORKS, 6f1-541-1519) 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 TURNOUT STORAGE REFERENCE SWEET 42.1 FOR NOTE NUMBER DESCRIPTIONS ,..� Architect Supplemental Instruc. ASI u4 National City Fire Department Headquarters Station 34 333 E. 16th Street r`�1.; r'n nrorn, PROJECT NO.: 01 1 101 DATE: TITLE 04/28/04 FIRST FLOOR PLAN SCALE: 1/8" = 1`-0" SHEET NO. X-06 212 *IM 041171r` • NOTES: ® PROVIDE I-I/2" DIAL, GALVANIZED PIPE GUARDRAIL AND GATE, WITH SPRING HINGES (STANLEY, 420164-RD2060-R 5/S°) SEE X-13 FOR ADDITIONAL INFORMATION ® SECURE GUARDRAIL TO WALL WITH END CAP ® REVISE DOOR (21S15) TO BE 3'-O° x 6'-S° REVISE HARDWARE GROUP TO "14. 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Department Headquarters Station 34 333 E. 16th Street PROJECT NO.: DATE: TITLE: SCALE: REFERENCE SHEET A2.2 Architect Supplemental Instructions SECOND FLOOR PLAN 1/8" = 1'-0" SHEET NO. X-07 TURNOUT STORAGE eff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Department Headquarters Station 34 333 E. 16th Street PROJECT NO.: 011101 DATE: 042804 TITLE: FIRST FLOOR SCALE DIMENSION PLAN, REFERENCE SHEET 42.3 Architect Supplemental Ins' - `an: AS1-04 1/8" = 1'-D" SHEET NO X-08 MEZZANINE \ \ UL STAIR ELECT. 221 4'-2° 13'-2° 5'-2° I RESTROOM 216 12'-6° 7s 4'-0° 12'-6° 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 -. Facsimile (619) 698-9178 FIRE FIGHTE ASSOC. 215 S'-5° 3'-2°' r RESTROOM 214 RESTROOM 213 11'-4° 4 -4° 4'-4° HALL 210 / HALL 205 National City Fire Department Headquarters Station 34 (' 333 E. 16th Street REFERENCE SHEET A2.4 Architect Supplemental Instructions PROJECT NO.: 011101 DATE: TITLE: SCALE: 04/28/04 SECOND FLOOR AS1-04 DIMENSION PLAN 1/8" = 1-0" SHEET NO. X-09 121 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177- Facsimile (619) 698-9178 IL O 0 O 12c1 8'47° O ©1 120 ®I O 126 08 I 0 I O la A I° °I 1° °I° °I° 123 9'-0° ° National City Fire Department Headquarters Station 34 333 E. 16th Street PROJECT NO.: DATE: 042804 TITLE: SCALE REFERENCE SHEET A2.6 Architect Supplemental Ins ono 011101 FIRST FLOOR RCP 1/8" = 1-04 SHEET NO. K-10 S'-6' S'- v S'-0' 2161 0 0 C S, ®, (1 1 0 1 0 1 ®0 iz 9'-® 0 A 0 0 0 6 214 2 IS x A 0 0 0 0 si 0 z 0 220 0 A z 9'-6. 0 A 0 210 S'-6° O 20a 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 A S'-0 213 S' -m' z 0 A 0 I2111 S'-6° A 211 S'-6' ©1 ..W.... ....... 205 A 0 National City Fire Department Headquarters Station 34 333 E. 16th Street' 215 S'-6° o i MINIM ■.....■ ....... S'-0' 211 S'-6' O u ......■ ■...... S' -0' 20c1 S'-6' ....... ....... 20-1 S'-6' S'-w 12061 REFERENCE SHEET A2.1 Architect Supplemental Instructions PROJECT NO.: 011101 DATE: TITLE: 042804 SECOND FLOOR AS1-04 RCP SCALE: 1/8" = 1'-0„ SHEET NO. X-11 N 1/2" 6 1/2" ENLARGED PLAN e SHOWER CURB o 0 SIM J SIM SIM CURB - Y CURB- Z 3 1/2" ✓✓ CURB - AA REFERENCE SHEET A2.9 eff Katz Architecture National City Fire Departmertt Headquarters Station 34 333 E. 16th Street ` DATE: 04/28/04 TITLE: CURB. PLAN Architect Supplemental Ins. .)ns PROJECT NO.: Q11101 AS1-04 SHEET NO. X-12 '7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 SCALE: 1 /8 = 1 —0 FIRE POLE HEAD MTG. REFERENCE STRUCTURAL DRAWINGS BRASS FIRE POLE FIRE POLE FOOTING REFERENCE STRUCTURAL DRAWINGS NOTES: 01 PROVIDE I-1/2° DIA., GALVANIZED PIPE GUARD RAIL AND 3'-0° WIDE GATE WITH AUTOMATIC CLOSER. ® SECURE GUARDRAIL TO WALL WITH END CAP. PAINT ALL RAILINGS PT-5 ® PROVIDE 4X BLOCKING AS REQUIRED. REFERENCE SHEET A4.3 eff Katz rchetecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Deportment Headquarters Station 34 333 E. 16th Street ` �lntin r:h, /-A. C11Q‘if Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: SECTION AS I -04 SCALE: 1/4" = 1'-0° SHEET NO. X-13 RECESSED FIRE EMWGUISHER CABINET DOOR (]ISB) TO HALL BEYOND ene EDI `— DOOR - REFERENCE DOOR SCHEDULE. TYP. DOOR CONTROLS REFERENCE ELECTRICAL DRAWINGS POOR - REFERENCE DOOR SCHEDULE, TYP. DOOR - REFERENCE DOOR SCHEDULE. TYP. SPEAKER - REFERENCE ELECTRICAL DRAWINGS 0.0' 1111111111 MAP BOARD FRAME, SEE 111IIIIIiI(IIII CERAMIC ` DOOR - TILE REFERENCE DOOR WAINSCOT. SCHEDULE, TYP. SEE f1 BRASS FIRE POLE 5 CONCRETE CURB GYPSUM WALLBOARD NOTES: 01 REDUCE ROOF DRAIN SUPPORT STRUCTURE TO PROVIDE MINIMUM -O" AFF. REFERENCE SHEET A5.11 National City Fire Department Headquarters Station 34 333 E. 16th Street - PROJECT NO.: DATE: TITLE: Architect Supplemental In, for 011101 A I®O4 04/28/04 APPARATUS BAY SHEET NO. X-15 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 If;191 69o_9177 - Forsirnle (619) 698 9178 SCALE ELEVATION 1/8" = 1-0" IL WU_ 2x50 A , 9" CONC. THICKENED SLAB w/ #5©18" O.C. T&B 2": THICK x 32'1 DIA. LANDING PAD BY; POLE MANUF. o: HSS5x5x'5/1 6 HS5x5x5 1 2' -0'' HSS5x5x5 16 HSS6x6x3/8 n! • 6x6 POST 6x6 RAISE F-4 6" if Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 CAN, Notional City Fire Deportment Headquar er Station 34 33,3 E, 15th Street Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: Partial Foundation Plan SCALE: 1/8"=1.-0" ASI-04 SHEET NO. X-16 3 'RINGERS )TYP. SIM. NO WALL ABOVE FLOOR )WN Jeff Katz rchitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkatza rchitectu re-com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 919504 Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: Portia) Floor Framing AS I -04 SCALE: 1 /8„— 1 —0" SHEET NO. X-17 i HSS4x4x1/4 K.P. BM. -TO -BM. CONN., TYP. W12x16 x x Jeff Katz rch itectu re 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkalzarchitecture. com National Fire Department Station 333 E. 16th National City, City Headquarters 34 Street CA 91950 Ct Architect Supplemental Instructions PROJECT NO.: 011 101 DATE: 04/28/04 TITLE: Partial Roof Framing AS1-04 a_SCALE: 1 /8 "-1 —0 " SHEET NO. X-18 SLOPE 40 POLISHED BRASS POLE POLE BASE/FLANGE BY POLE MANUF. ANCHOR BOLT PER POLE MANUF. SPECS. RUBBER LANDING PAD BY POLE MANUF. WIDTH (2) #6 EA. WAY 2'-0" T&B FIRE POLE FOOTING DETAIL PER PLAN Architect Supplemental Instructs, PROJECT NO.: 011101 DATE: 04/28/04 ,BSI-04 SHEET NO. 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 (2) 222.2177 U-F11-.i.Ip fain Foa..917g National City Fire Department Headquarters Station 34 333 E. 16th Street TITLE. Fire Pole Footing SCALE: N.T.S. X-19 7 POLE CEILING FLANGE BY POLE MANUF. 3/16 V HSS3x3x3/1 6 AT DIAGONAL BRASS POLE PL 1/2x6x6 3/16 PL 1/2x6x6 — w/ (4) BOLTS PER POLE MANUF. SPECS. NOTE: PROVIDE DISIMILAR METAL BETWEEN POLE FLANGE AND STEEL 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 National City Fire Deportment Headquarters Station 34 pp 333 E. 16th Street SECTION A —A Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: Fire Pole Support Det. SCALE: N.T.S. ASI-04 SHEET NO. X-20 11 / )(i 12"x6" DOOR LOUVER W/ MIN. 50% FREE AREA 406 (2-WAY) .....mr17".Altrogs--'-ej 4 AS ( 7 ) ff Katz chitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Department Headquarters Station 34 333 E. 16th Street fL Cay. CA 91950 Architect Supplemental Instructions PROJECT NO.: 0 9 1 1 01 DATE: 04/28/04 TITLE: 1ST FLOOR HVAC CHANGES ASI-04 SCALE: SHEET NO. X-21 -' 1-1 /2'v 1/2" 1-1/2" WC-1A 14 1/2" HW UP TO LAV ON 2ND FLOOR. 27 1" HW & CW DN. TO WASHING MACHINE, PROVIDE S.O.V'S. 28 SHUT-OFF VALVE ABOVE CEILING. PROVIDE ACCESS PANEL. (PAINT TO MATCH). Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkatzarchitecture.com National City Fire Department Headquarters Station 34 333 E. 16th Street Notional City, CA 91950 Architect Supplemental Instructions PROJECT N0,1 011101 DATE, 05/04/04 TITLE' PARTIAL PLUMBING 1ST FLOOR PLAN ASI-04 SCALD 1/4° = 1'-0° SHEET NO X-22 eff Katz chitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.iefflcatza rchitec.tu re.com Notional City Fire Deportment Headquarters Station 34� 333 E. 16th Street National City, CA 91950 PROJECT NO.: 011101 DATE: TITLE: SCALE: 04/28/04 2ND FLOOR HVAC CHANGES 1/8"=1°-0" Architect Supplemental Instructions ASI4)4 SHEET NO. X-22 I S NR. ISI HALL 129 DIGAL RAGE `CI ti REST / ROOM 126 HALL 12S I L11.4,UND _ J 3/4" 2" 125 '1 TURNOUT STORAGE 122 IHALL • 124 STOR I 121 1 Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.j effkatza rchitectu re.com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 Architect Supplemental Instructions PROJECT Nal 011101 DATES 05/04/04 TITLEt PLUMBING OVERALL 1ST FLOOR PLAN SCALES 1/8° = 1'-0' ASI-04 SHEET NO. X-23 14 1/2" HW UP T6 LAV ON 2ND FLOOR. ff Katz chitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Department Headquarters Station .34 333 E. 16th Street National City, CA 91950 Architect Supplemental Instructir PROJECT NO: 011101 DATE: 04/28/04 TITLE: 1ST FLOOR PLUMBING CHANGES SCALE: 1/4'=1'-0' -/z 1 SHEET Np. X-23 -/-' I • I, --HR-1 3" -3/4" 2" 6" r- TP SHEET NOTES 3/4" G. UP TO ROOF. 141 k[CJrid H C S 21 3/4" HW UP TO SERVICE SINK ON 2ND FLOOR. TURNOUT IIq I ELEV. ® i_ 1 RATT2 !\ 2-1/2 \\ Ir DI ,R; -1/2' SIM OD IKITC !!= ff Katz chitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (519) 698-9178 Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 Notional City TITLE: Fire Deportment Headquarters Station 34 333 E. 16th Street jscr+LE: F+,pfR4';Fais,€tl Cit.,.r,. CA 91950 1ST FLOOR PLUMBING ASI-04 CHANGES 1 /8"= r —0" SHEET NO. X-24 ff Katz chitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 Facsimile (619) 698-9178 Notional City Fire Deportment Headquarters Station 34 333 E. 16th Street770 NicO'k)nril City, CA 91950 Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: 2ND FLOOR PLUMBING CHANGES SCALE: 1/4"=1'-0" AS1-04 SHEET NO. X-25 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619)698-9178 National City Fire Department Headquarters Station 34 333 E. 16th Street 7— Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: 2ND FLOORPLUMBING SCALE: CHANGES AS1-04 1/4"=V-0" SHEET NO X-26 • • 4-4,4 '41, V* • •-•..•-•-•_•_•-•_•...• • I2c E2-66I- 1 401. •i• I3a 13Ic I3a ti • • • • • • • • • • • • • V* • • + • • • • • •At HALL V'. I2k. E2-6e. • 0 • E2-33 3 STAZ'. E244111, URNOUT 131, A (011j a e 3 I I I I I I V4 747 gr• ••• • • * • • 474"4174 5.70! 04+ • E2-4a • le • 93ofE r Azy 9.8 so . 9/30/05 .1,15tEtTmtie -c-orcaNu' eff Katz rchitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 National City Fire Department Headquarters Station 34 333 E. 16th Stree, Architect Supplemental Insl ins PROJECT NO.: 01 1 101 DATE: 04/28/04 TITLE: FIRST FLOOR PARTIAL LIGHTING PLAN SCALE: I/8" = A I-u4 SHEET NO. X-27 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 696-9176 1' ALL 1/12'0t' MED. SW53 National City Fire Department Headquarters Station 34 �} 333 E. 1¢th Street I { h @° nns r i4er CA di950 REPORT WZITING RO• -11 rdIR 1 0 TURNOUT TORAGE STAIR (:).e‘ 50 9/30/06 OF�o/ Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04-28-04 TIrLE: FIRST FLOOR PARTIAL POWER PLAN SCALE: ASI®04 1/8" = 1'-0" SHEET NO. X-28 REPORT VVRI. & ROB~ TURNOUT STO._r eff Katz rchltectu•re 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Moe (619) 698-9177 - Fac,lmile (619) 698-9178 National City Fire Department Headquarters Station 34C, 333 E. 16th Street ' Architect Supplemental Instr'— ns PROJECT NO.: 011101 OATS: 04/28/04 TITLE: FIRST FLOOR PARTIAL SIGNAL PLAN A I-u4 SCALE: 1 /8= 1 .-0" SHEET NO X-29 3'I 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9176 arts» 3 t= • ITT-aTROOM1 0 lb 300 a National City Fire Department Headquarters Station 34 333 E. 16th Street 31 htntinnn! Cit». (.p91950 Sj 0 E2A4 la la 0 344a -4 E2A-2k JAN a E1 V E2A-4 2 1JJNK 1311E 4 TAIpsimaistsi ■u�.�ian 3lwK Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: SECOND FLOOR PARTIAL LIGHTING PLAN SCALE: 1 /8" — 1 —0 ASI®04 SHEET NO. X-30 CsF1 11 EF 2-5 (a) T E F1C59T " ASSOC, 11 E2.11.201 I)) T F 12 M GSA 411) GF & GM 1-IALLIW 2 210 E2A -I HALL 205 BUNK. ROOM217 +84 2A - E2 BUNK ROOM 215] +84 t2A-3 E2A BUNK ROOM 484 2A-3 E2A BUNK ROOM 2001144 E2A- cO 6 E2A BUNK ROOM +134 2A-1 20 eff Katz rchitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 Notional City Fire Department Headquarters Station 34 333 E. 16th Street wok)r,H 7,A CllOcin Architect Supplemental Instr -Es PROJECT NO.: 01 1 101 DATE: 04/28/04 TITLE: PARTIAL SECOND FLOOR POWER PLAN SCALE: 1/8" =1' —0" ASI-u4 SHEET NO, X-31 I Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 696-9178 Notional City Fire Department Headquarters Station 34 333 E. 16th Street Architect Supplemental Instructions PROJECT NO.: 011101 DATE: 04/28/04 TITLE: PARTIAL SECOND FLOOR SIGNAL PLAN SCALE: 1 /8,._ 1-0" ASI-04 SHEET NO. X-32 — I I I L of 1T2'! Gam'- 2"WCO r- r \ 0 0 3" WCO ��SH- S— SS-1 21I y' 1 II_ y I ' �t kr�e l T'\'-1/2 Iid1����� 2" I ,a� FD 1 h U• shi lela � 3!! i3/4!!� _ _ ; x�� 2" V. IN CEILING I\� SS-2 d I 1 SPACE-----_-- ° , rl� II SS-1 ity II SPACE /31 (-1-1/4" OW �.►� \FD-2 4" 4" WCO II Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkatzarchitecture.com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 Archltect Supptenentat Instructions PROJECT NO, 011101 DATE! 05/04/04 TITLE! PARTIAL PLUMBING 1ST FLOOR PLAN ASI�O SCALE' 1/4" = 1'-0` SHEET NO. X-33 L00la], EOLLL ON Xti/X17 LL 9L I2H t+002/12/90 -z - 04 May 21, 2004 Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 MARCOTTE HEARNE BUILDERS, INC. V-i1 OiT'u�' LC2 Si'n Cat i'3 i.i a fOk _ Via Facsimile RE: National City Fire Station #34 Marcotte & Hearne Job No. 04-003 Subj: Marcotte & Hearne Change Order Request No. 00er Dear Sir: fi The contract adjustment required as a result of: PR #4 — Added sliding pole and revised layout of adjacent rooms. Change Order Request No. 006r is S13,231 The incorporation of this revision into the contractual scope of work will require working days not included in our current schedule, The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date, The terms (cost and schedule Impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuancd. We HAVE proceeded with this revised work, Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. 4 Very truly yoyrs /, Quotation Accepted By: Wayne Powderly Representing: Project Manager Date: CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 Project File 11696 Sorrento Valley HO.. Ste. ZOO, San Diego, GA 92121 Tel. 858.79344101 Fax: 858-793-4102 ET.7Td I, ciTT `t70 t ri F' T? 'F2Lf ' T H c'F,J Rc,Sa : 7]N > =3N'fH--71N a A. ! f1'1 IHL.1 3002.[OLLL ON Xa/XL] Ll sl I8d V0oZ/LZ/go JOB NO. 04-003 COR NO, 006r MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 PR #4 - Added sliding pole and revised layout of adjacent rooms. SUBCORTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Added ceramic tile Valley Flooring $326 Added guard rail with gates, steel connection and pole installation, and credit access ladder. Richardson $4,462 Door and hardware revisions F&H Supply $1,148 Door and hardware revisions TL Summers $288 Add concrete footing Big Horn $443 Mechaincal revisions UMEC $0 Millwork revisions We're Innovative -$555 Electrical revisions Sadler $2,614 Supply Brass Pole McIntire Brass $3,750 SUBTOTA 5%OH+P 1% Bond Premium 2,476 $624 $13,100 $131 Change Order Total $13,231 R,T/7d I.,IHT;R.t'F 7' T' 'FICW 70TtP s'Ci RqR 'f1N ' HA --------------- Howard N. Mills From: Wayne Powderly [wpowderly@mhbuilders.comj Sent: Friday, May 21, 2004 3:45 PM To: Stephen Kirkpatrick; Howard N. Mills; Jeff Katz Subject: Review of PR #4 cost proposal Jeff, Howard, the following is in response to your 5 review comments on COR #6: 1) I asked to UMEC to send me sketches of before and after PR#4 to show the additional material he quoted. He responded with the e-mail below saying that he had only reviewed the clouded items on the sketches, which is what I did also!. The adds, and credits outside the clouded areas, cancel each other out so there'll be no cost from UMEC. 2)If we delete the requirement for the cylinder, threshold and door bottom, we can reduce F&H's cost by $48.26. The $70 upcharge is for the machining of the door for the added exit device, which itself costs $1,068. 3) TL Summers is our door installer and his added costs are for the installation of the added hardware between group 3 and 14. You are correct about his incorrect mark up, I will reduce it by $7.50. 4) Sadler Electric has 5.4 hours for the increased LF of conduit(60 lf) and wiring (240 lf) needed for the new locations of the light fixtures. The quantity of fixtures did not change but the locations did. The rest of their cost was from their subs for the added smoke detector, speaker and strobe. 5) We're Innovative's price is a credit because the length of the counters had been reduced. I'll revise the COR per the above and fax it out to the team. Give me a call if you have any questions, thanks. Original Message From: Alex Best [mailto:abest@umec.com] Sent: Friday, May 21, 2004 10:09 AM To: wpowderly@mhbuilders.com Subject: Re: [Spam] FW: [Spam] Review of PR #4 cost proposal Wayne, In reviewing the plans again, I found that there is a register outside of the clouded area that was removed. The changes made did not come with any kind of narrative. If it was outside of the cloud, I did not spend any time on it. Seeing that a new outlet was not added and simply relocated would have very little cost impact. Please void our change order proposal and consider it a no cost change. In order to avoid any future confusion, I would like to recommend that change directives be issued with some narrative as the changes taking place. This would save everyone a lot of time. Any luck on getting full size plans for the changes made to date? Respectfully, Alex Best Operations Manager Special Projects Group University Mechanical & Engineering Contractors 1 NOD32 1.719 (20040416) Information This message was checked by NOD32 Antivirus System. http://www.nod32.com NOD32 1.770 (20040521) Information This message was checked by NOD32 antivirus system. http://www.nod32.com .co'otn.toLLI ON x8/x1] 11 sl INA 17O0Z/lZ/90 05/1'.7/2004 16:05 6196979451 PICHARDSON STEEL INC PAGE 01/03 _RICHARDSON STEEL, INC. :425 AISC Certified Fabricator C Z *-E Proposal#:050604- Page 1 of a 9102 Harness St, • Spring Valley, CA 91977 r Lie. No, 756989 • Phone (619) 697-5892 • Fax (619) 697-9451 ESTIMATOR: SOB CARSON s PROJECT: NATIONAL CITY FIRE STA, #34 (PR#004) SPEC. SECTIONS: METALS DATE: MAY 17, 2004 PER CONTRACT DOCUMENTS (DATED): ASI-04 (04-28.04) DRAWINGS: X-06 TBRU X-33 ITEMS ERECTED: 1. FIRE POLE SUPPORT 2/X-20 ✓ ' ' 2. FIRE POLE (SUPPLIED BY OTHERS)*** 3_ GUARD RAIL & GATES X-13 24` + 2_ 6-ate + r-1e-1542 ***FIRE POLE TO BE INSTALLED PRIOR TO FRAMING OF POLE ENCLOSURE, TOTAL BID: $5061.70 sS AL1d flO� cnv�K �✓ *NOTE: SEE EXCLUSIONS LISTED ON FOLLOWING PAGE **NOTICE: DUE TO R4FmLY ESCALATING STERL PRICES, THIS PRO1POSAT. WELL BE SU l CT TO REVIEW AFTER 30 DAYS. i; HTm °.i n t7O07 "Ft Pf:� r7 T17 5-SJ RcF 'ON Y,H _! 1 N - FT R i =HIA : t l� trooI .[OLLL ON Xa/X1] LL131. I}13 1700Z/12/4o 05/1;7/2004 16:05 6196979451 RICHARDSON STEEL INC RICHARDSON STEEL, INC. 24,Z5 ABC Certified Fabricator PAGE 02/03 Proposal#:OSOi 94 page Z, of a 9102 Harness St. • Spring Valley, CA 91977 • Lic. No. 756989 • Phone (619) 697-5892 • Fax (619) 697-9451 PROJECT: NATIONAL CITY FIRE STA. *34 (I'.R*004) GENERAL FACLUSI9.2fSt .Any Items or work except listed above not included; the following hems are specifically excluded, but do not necessarily comprise of all excluded items: F)L?CED ACGlr act )GADDER (g seders � D>I,/,AZT. Rough hdwe, I. bolts for wood angles Costs for tests or Inspections Mad less than 1/15" thick Steel studs & appurtenances Groudmg or drypacklus Wood millers Alum thresholds Glace scope Speeial Insurance Coat of bonds Demolldoh Field tough -up of shop primer paint P ure drilling for ruts far Setting of anchor bolts, leveling nuts or templates Pipe sleeves its backup platen for other francs Non ferrous material old;. permits Cutting or detain of our work to accommodate other trades Pareeipatiag in penaities or liquidated damages applied to Boyer Sandblasting or (tame.oleantlag of steel before piloting Pickup dolma for precast panels Fle1d welding concrete rebar to structural steel Pleat sod fine plumbing of columns suppot fug wood Prime pasting et our steel with 40Y printer other than oar A,l'_C.D. approved Iow'V.g_C. shop primer in current use : General Contractor shall adhere to AISC Code or Standard Prentice, Richardson Steel, Inc. Rhea not he responsible f General Purring channels and Removal erasing rode and cables A bolts other trade Boat bitches &eel to wood lustant[don Shear Studs Carpentry/Glutanu hardware Access panels Concrete =bar Grating and frames Structural steel celc's Painting organ, item Contractor's failure to comply with RISC Standards. This Proposal is valid for 30 days ms o or y from data submitted at top oCpage Ni. • TERMS OF PAYMENT - All terms of payment ere granted subject to the Seller's Credit Department. pe,ymeuts shall be made on or before the 1 Os" of the following month for ninety percent t (90%) of the value of material and labor provided during the preceding calendar month, retention to be reduced from ten percent (10%) to five percent (5%) after filly percent (50%) of the structural steel has been erected, the remaining five percent (5%) shell be paid within thirty-five (35) days after completion of the Seller's portion of structural steel work for structural steel, and thirty-five (35) days after completion of the Seller's portion o;f.miecellaneou$ work for miscellaneous steel. On F.O.S. work terms shall be net thirty (30) days fbr the contract value to each shipment, This proposal shall be lnce. $. n into any contract or subcontract for proposed work and shall not be amended, Accepted: BUYER SfGN'ATT.71a TITLE t,P?, T? " 7pTir7 C` f own RICHARDSON STEEL, INC. SELLER SIGNATURE TITLE 2 9o.ot [OLLL ON X8/XI1 LL:9L Iaj 1700Z/L2/90 05/'L7/2004 16w05 6196979Q51 RICHAIWSON STEEL INC PAG5 03/03 FAX NC. : 7 4102 May. 17 2004 a1:oePM P2 National City, Fire,Station #34 Marcotte + Hearne Builders Inc. Subcontractor Change order Break Down Af*lyals COR Materials: Unit Cost Item t Description qTY tinTotal Tax) Total Rem 6c.A-Arb %AA4. •'4. s 2.NLe s.rLx r Item? Item 4 Item 6 `® SI ' O AL 'A" Equipment: QTY - Unit Cost p r esoription . HOURS (Intl. Tax) Item 1 ___Et Q T ifiiXr 1'uoe s.. r, 4. - 5- Ar '2-7__.. Item 2 InOrriLlI 1- i dh� W/d,0 Item 3 Item 4 Item 6 Total SUBTOTAL. "8" Prev, Wage Labor: HMS Baas Rate Clans Type, Ary!!t; Ve4/140e _ MY. n S' tI$.s4 Clew® Type„sitoay u eel./Sis 4 4" 1 �W-/3' Class Type . Clans lypo" SUBTOTA Commercial General Liability and Property Damage Insurance Worker's Compensation Insurance Social Security and Unemployment Taxes' 540p u.s.adRI< SUBTOTAL "D" SUBTOTALA+B+C+D Subcontractor Mark Up 15% Total Subeontrcatar Change Order N r� 5 TR. Piror 3 •'.- .sue Total 36a-F-y Y O/•yF� C06a .22- (,s'ti 6i. 7 Tura, (.„ /GT'D 5ua"a,. /6s-0 6T/ d WdET .bP t00?. T; . `F244 FOTt' 4.5L ^S2TIN XH-i 'ANdddH RI LO3-tT1H : wnN.-!. 9o0f3j,[o1LL ON X8/X1] LL sl I83 boot/LZ/40 Ma3:0S 04 0830a VALLEY FLOOR COVERING 519 449 0540 VALLEY FLOORCOVERING INC. 1591 CUYAMACA ST. EL CAJON, CA 92020 LKC 492930 Fax Transrrcittal Form, TO: AT*N: 14/1 • PHONE: (619) 449-5222 FAX: (619) 4494)540 FROM: DENNIS CURTS DAME: 5// NUMBER OR°AGES INd cOVaR PAGE MESSAGES: �Y + }-1aq At c-0+'/ fT P ia vviabu- LW° f WL 1(�1 ° pot ET/971. Ld T:hH.7i T? .Fcew 7.0T EF?_ RCR: `ON 471-1 NNHHH H I ;_rCMH41 L•i021 • L6oi p[oLLL ON X8/X1] II 91. IH VOOZ/IZ/40 115/UUh2004 08:49 FAX 1 I001 F.& H. COMMERCIAL SUPPLY 5325 EL.KHORtN BLVD #322 SACRAMENTO, CA 95842 PHONE: 916-344-2538 FAX: 916-334-8662 /07-0P frblrer-z. lee->ezvc* NAME / ADDRESS MARCOTTE & HEARNE BUILDERS 11696 SORRENTO VALLEY RD SUITE 200 SAN DIEGO, CA 92121 Estimate DATE ESTIMATE NO. 5/6/2004 605 (s3(L PROJECT ITEM DESCRIPTION QTY COST TOTAL WOOD DOORS HARDWARE HARDWARE HARDWARE HARDWARE HARDWARE HARDWARE HARDWARE HARDWARE PROPOSAL REQUEST # 4 - NATIONAL CITY FIRE STATION # 34 CHANGE HARDWARE GROUP FROM# 3 TO#14 REPLACE 3/0 X 7/0 DOOR WW/ 3/0 X 6/8 - MACIiINING CHARGE FOR CONCEALED VR DEVICE DELETE L90SOR X 17 X 26D MORTICE LOCK 6loufp 3- ADD-99471JF X 36" 26D EXIT DEVICE ADD-994L X 26D TRIM V ADD-20-061 MORTICE CYLINDER IC CORE ADD-7501 X 689 NORTON CLOSER ur ADD- 270D X 36" AL THRESHOLD ADD-290DV X 36" DOOR BOTTOM if ADD-SS8D-17' SMOKE SEAL ✓ Sales Tax hiaLA rp"VAS 4 14 1 1 I 1 1 TOTAL geoz.rl\ _ $1,200.24 ! .- . 7 WW 17Wi7 Tr -'F,?t.� 70T?7 &) ?c9: TN xH=. '.. fl 't .i ` !<in?i .800 Z ,[OLLL ON XN/X1] LL 8L INS 1700Z/1.Z/90 (15/19/4004 11:14 FAX 1 F.& H. COMMERCIAL SUPPLY 5325 FLKIIORN BLVD #322 SACRAMENTO, CA 95842 PHONE: 916-344-2538 FAX: 916-334-8662 NAME/ADDRESS MARCOTTE & HEARNE BUILDERS 11696 SORRENTO VALLEY RD SUITE 200 SAN DIEGO, CA 92121. ITEM WOOD DOORS HARDWARE HARDWARE HARDWARE HARDWARE :HARDWARE HARDWARE HARDWARE HARDWARE DESCRIPTION PROPOSAL REQUEST # 4 - NATIONAL CITY FIRE STATION # 34 CHANGE HARDWARE GROUP FROM # 3 TO##14 REPLACE 3/0 X 7/0 DOOR WW/ 3/0 X 6/8 - MACHINING CHARGE FOR CONCEALED VRDEVICE DELETE L9OSOR X 17 x 26D MORTICE LOCK ADD-9947L/F X 36" 2® EXIT DEVICE ADD494L X 261.E TRIM ADD-20-061 MORTICE CYLINDER IC CORE ADD-7501 X 689 NORTON CLOSER n� ADD- 279D X 36" AI., TI1RESHOLD Y GCPJ ADD-290DV X 36" DOOR BOTTOM )C ADD-MD-17' SMOKE SEAL Sales Tax QTY X dj e e .e 1 1 1 1 1 1 1 TOTAL [a001 Estimate DATE ESTIMATE NO. 5/6/2004 605 COST PROJECT 70.00 -190.00 830.20 237.85 33.60 104.16 9.80 4.86 13.44 7.75% TOTAL 70.00T -190.00T 830.20T 237.85T -33;6012- 104.16T -� 06r33 5 FT%^ Y4F.T t70 17,M? T7 'R'e :! 721T17 $n) R-, C{.. OH >H-1 9 1H7H a?__ FIDNH,s: I,n -i BooE [oLLL ON xa/xl] L1. 9L DIA trOOZ/LZ/SO `u�/Un/'.ZUU4 u5:4H IA7 1 Ijoo2 Norms a GUARDRAIL. AND GATE, WITµ le° ING NINGBO [iirTAMLrr, 4200164-RD2A74140-R 5/219 SEE X-I3 FOR ADDITIONAL 1NFoRMATIoN Q BEGUIFE GUARDRAIL TO WALL UJITM END DAP' Q REVISE DOOR C211351) TO 5E 3'-tY)' x 6'-8` IREN(15E MAIRDWARE GROUP TO 414, Jeff Katz &chitecture 7280 Navelo ItA, 801110 108 o San plago, GA 8211 E1 Office fats) eIe•8177 m Fanolmlle (E10) t190-9178 vnvw.181fkbrzarchltectu re _eom National city • Flre Deportment HecdgUarterS Station 34 333 E. 16th Street ,National City, CA 91950 iRMEIRF-NGE OHEET A2.2 Arohitrat Supplemental Instructions Potwar Na,: 011101 DATE• 042804 TlTLI SECOND FLOOR PLAN sCALE: 1/8" = 1'70" ASi-04 0£4,d MOLE TT 608Z 50 °E;J zati4 £6L 4Se; 'ON XUAL, 7Wrt, t'F,J ^c,,N;. `lN 2Neld3H aLlOONUW: Woad ;a.?lH 1H RI i roNHLJ 7 NriN- ,OLQ,IJ .[OLLL ON xaaal] LL 9L D:H tOO /LZ/40 FROM : TL SUM DEL) FAX NO. : 619 445 329E1 May. 09 2004 12:47PM P1 T.L. SUMMERS DEVELOPMENT G UG: #484092 - P_O, BOX 149E • ALPINE. CA 91903.1E1.. 019)445-3208 - PAGER (Gi9)53O 7O19 LETTER OF TRANSMITTAL • • rQ ,11fi WE Anti PI INR YOU ('ji -Afadrrd l .1 Undo orperrala cover +�+� ..._----._�� �- — urn tralawinpl tires: f l shop rMuwlnip fl Pdids [.1 Plums j C1 S "Plas n Copy of tailor )(Marva wxlimr-- clomp Alt& 0 SpacMlcSAvrs 37v- THESE ARE UW4SMITTED as dlad«ed isaiOar: (3 For apprcwai Ct Approved as stdlrrliled, i I Hesrb w SWISS for approval a.rer your um; ) lyaurnad as rrofvri 0 Submit toles for dishlbullort CI As requested 11') fluter/zed txrrraawaea fl BU IM » oonwtormi pd'tM (;I For review arrd ocsnavard a -- 0 von BIDS Dix? 19 I,i PRINTS FIE1UAMLD AFTER LOAM WQil9 FFEMAFlKS ?2Tb Cr,) ,PqP ° "FIN phi?Rl� �,u LI,.OI [oiLL ON X8/X11 LL 91- DIJ 17OOZ/LZ/90 FROM = TL SUM DEV FAX NO = 619 445 3298 May. 09 2004 02:24PM P1 „L,, SUMMERS ' EL P ENT UC:4464092 " P.O. BOX 149B -ALPINE. CA 0:90.5"i - `�,l a-. 0.5T9v)445-i26i£i DATE• 41 0 MTN 'COMPANY '1, 41i) .,JE1 t - • n LAY - w AV, r.• CONF I RM I NC copy :SENT Y MA I L YES �d[� TIC .NF RNATX E cONTAI!tU IR THIS 1 S SSION i.S--- FOR THE USE OF ADDRESSEFAINLi. IF VOU AWE RECIEVED Th S T€ NS11ISSI IN VAROR0 PLEASE CALL US IMED AT L.Y AT 619-a445-5M FTC r � T . rns-,1? T7. •FFt,.f 7Hrh S'.51 ;cH� •flN yH- 7vNHIH HI frNHH 7 Id!--1 zl.pfj_[oLLL ON Xa/XI] H. Ian 17ooz/L2/90 May 10 04 09:2Oa 1chorn constr•ucion' tromp, 7805917514 BIGHORN co e*rii Lim i Lt # 597866 p.1 762 Poinsettia Ave. San Marcos, CA 92069 'FAX COVER 1-t 'ET RATE: �� •/ ll 0 (-1 TII1IEt...: TO: C0: lOirJe PHONE: FAX: PHONE: FAX: Number of pages including i r'sheet , • T/7TA W-1:7T 7b[71 fr4i3,7 -r'rrr; c" 'fir.) `0_i,.i (760) 727-8837 FAX (760) 727-8330 ,B1I' ]_[QLLL OH xa/XI] 1.1.:9L Did boOZ/LZ/90 Ma 8` 10 04 08: 20a 1ghorn construcion comp° 7605917514 p.2 762 Poiirsettia 4ve. San Mamas, CA 92069 5-10-04 To: 'Marcotte & Hearne Builders Attn: Wayne Po*derly Re: 'National City Fire Station #.34 Subject; Proposal•Retuiest #4 Add Footing for Fire Vole i/ Add Curb at New Walls V BIGHOIIN construction c Lic, # 597866 . Pole.Base/Flange/ Anchor Bolt supplied and installed by Pole Manufacturer. Bacichoe .5 hr. at $85.00 = 42.50 ✓� Concrete 1. cy at $83.00 Labor: 4 hrs. at. $65.00 Total Add: $443.00 Sincerely, Drew Olwell 2.60.00 385.50 15% 57,80 443,00 83.00 v (760) 727-8837 FAX (760) 727-8330 T/S T,.1 I,,-117T "1' 76T17 $T RCR:. TIN Y,H_-{ HNNHRH 7 I nrN!H I : WEN -1 171p1]_[Onu. ON xa/xl] 11 9l Iid bOO /tZ/40 ' Mati.12. 2004 10:14AM WE'RE INNOVATIVE 760-789-6381 No,6410 P. I 1140 �, *License # 9992fn7 Innovative CILS•dort r'iz;?iiai�fs f1rrd rpo,2a? CONTRACT CHANGE REQUEST DATE: May 12, 2004 TO: Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Rd Ste #200 San Diego, CA 92121 VIA: FAX: (858)793-4102 ATTN: Wayne Powderley C/O REQUEST NO: 2 FROM: Robert Merrill Pertain, Sates Mgr. RE: #40247 National City Fire Station #34 Upon execution by all parties, or receipt of your executed form, the above referenced subcontract is hereby mortified as follows: PR #4 - Floor Plan change in laundry and rest rooms #213, 214, 218 Laundry room #123 cabinet 4' to 5' & location move Restrooms tops 14' from 18' & 1 - 2' 8" cabinet under longer top in #216 ($555.00j Total Amount this Change Request: ($556.00) RECAP OF CONTRACT AMOUNT Original Contract Amount Was: i127,931.00 Previous Change Order(s) Total: $22,634.81 Plus This Change Order: (8655.00) New Subcontract Amount Is Now: $149,910.81 AGREED AND ACCEPTED When this change order is signed by both parties it constitutes their agreement: - j That the amount of this change order Includes all time and oompaneatlon for the work described herein, including overhead and profit , deign, Payment & Performance Bonds, and liege extensions. 2] That the subcontract price is adjusted as shown above and that nu further adjustrnenl In that price by reason of the change(a) provided herein shall be made; and 31 That all the terms and nnndflorta of the subcontract, except as modified by this and any prior change orders, shall remain in full force and effect and apply to all work aa so changed. Marcotte + Hearne Builders, Inc. Your Authorized Signature Printed Name & Title Date W-_ a In Wive ur Aut orized Signature Robert Merrill Pertain, Sales Mgr. Printed Name & Title 136 10th Street. Suite f- Cdamana, CA 92065 (760] 7e9•-8379 FAX /76017894361 Date ET/bT,H l:.'.-ihT .ba t7007. T7 'AP-14 7 Lt' rFr R,` (lH XHH N}IHflH , n-nkitd • I ENA ,4!'.QI3j_[01LL ON xa/XL] Ll st I83 17ooZ/LZ/90 McINTIRE B SS. WORKS, INC. . 14 tiORACE STREET.9:.OMERVILL1, IVIASSt IRISL.'t"1"S 02143+T tL;617.347•L819+F..X:617-347-4466 peu.,46,4 Thank you for your requ' i;;t for quotation fox a.Vlodel 19 Stationary Slide Pole. We are pleased to quote as follow; MODEL 19 STATIONA RY SLIDE POLE o,lliard drawn, highly polished brass(up to 24 feet) with an outside diameter of 2 1/2 illched•with, a: $/32,iuch wall thickness, with floor flange, ceiling '3'uerr ovic; socket and landing mat $ 3,TePer.76V. Plurfilifight up to 24'. ,Addi $2Q9,for first foot over 24' plus $I00 each additional foot. Price- F0FSomelville, Massachusetts. -S3,p.O The above price is good for 90 days after the date of this letter and is for material only, no IF5F6t5 installation or erection labor supplied: Payment terms IF BONDFD: 1/3`d with purchase order, I/3r`t at time of shipment, 1/3'd thirty days after shipment, We ;;11ip freight prepaid and invoice you for same. Tease provide us with the bonding information, Iiumbers, etc_ NOT BONDED:1/3rd wi; l; purchase order, 2/3Tds at time of shipment. We will ship freight COD for the freight charges. What is the required deli oory date? Please sign where indicalcd below sod return €t copy to us. I.f you have any further questions, do not hesitate to contact L. Very tru), yours, Customer Acceptance • McIntire Brass Works, In F.A.;blis am- ��� �'yJ�/.i.... ..ihS✓ii ram. »•''"_.r�ti••!-!•'�/N.r..�� �%il"Ol�I..-^��...+-I/�'.�.fr-(Sf,l�•1..Q�. TS°`iy .� 1.f.' ,� >'n,.1-`d, C r'3.'`".alv..{..41°4'4:✓ia-(0'7 (.4.,`°l.d. " // ♦'4+�-%rJ .��c . Td WH917:S® b@1 TL 'hEW ST/CTd kklt?T °. t%O b007„ T •Frei,.) ET8T Lt LT9 : 'ON 2NOHd 9TLS1W WO?f_J 7si 7OTP 6z_ 8S 'e `ON XH ; OOMHl<, 91.9[j.[oLLL ON XN/X1] LL:BL Iad 17QOZ/LZ/40 SADLER LEcrRIC, INC. 1935 Friendship Drina, Suite F, El Cajon, CA 92020 LIC #, 323556 PHONE (619) 449-1266 FAX (619) 449-4372 From the desk of Craig Small FAX MEMO To; Wayne Powdcrly Company; Morcott* + Hearne Bolder;, Inc, Ph (858) 793-4101 Fox (858) 793-4102 Project: Sadler Job # 266 National City Fire Department Headquarters Station No. 34 Subject: Proposal Request No. 004 bate; 5/12/04 Number of pages including this cover sheet; 4 Thank you, Crai§ Small Chief Estimator, x-105 f#e a,66a ram. 6� fV2i" p E, r 9Td 'v.f,-;HT "b(T '177.10 ' 7RTt7 8c;PTN Y,H.A .2.r&1 [OLLL ON XN/X1] LL 9L Ia3 trOOZ/LZ/90 National City Fire Department Headquarters, Station 34 PROPOSAL REQUEST NO. 004 SADLER JOB # 266 DESCRIPTION OF CHANGE IN WORK: Fire Pole Add, Changes in floor plans PROPOSAL NOTES; 1) This proposal affects quantities of various light fixture types, Delays In decisions whether or not to accept may affect project schedule, ITEM DESCRIPTION 5/12/2004 MATL MATL LABOR LABOR QTY, UNIT $ EXTEN UNIT HRS HRS EXT 1/2" EMT conduit w/fittings (power & lighting) 60 $0.55 $33.00 0.05 3.00 #12 THWN CU wire 240 $0.07 $16.80 0.01 2.40 1/2" EMT conduitw/fitting® (psi/speaker) 20 $0.55 $11.00 0.05 1.00 Install speaker beckbox 1 0.50 0.50 3/4" EMT conduit w/fittings (fire alarm) 20 $0.75 $10.00 0.08 1.20 4sq deep box for added strobe light 1 $6.00 $6.00 0.50 0.50 3rd Tier Subcontractor(s) SImplexGrinnell quote (pa/speaker) $340.00 DataLlnk Comm quote (fire alarm) $1,471.00 Totals Material Leber hours Subtotals all items $81,80 8.80 Sates Tax 7.75% $6.34 Labor Rate: Including Insurance, $43.45 $8.60 $378,e7 Taxes & Fringes Sadler Electric Work Subtotal 61,81 3rd Tier Subcontractor Quote(s) $1,811,00 Proposal Subtotal before Markups $2,272.51 Markup 15.00% $340,g2 Proposal Total $2,@14,00 I I;ir'CT 7.17i Y;Gir1! T2 'FPL,i 'RT?J. CF RCP" 'rmi Vs-I-J RN?-I17.17_ FL I ` T IHI..t : !.,Inu . =8L »[OLL_!. ON xa/xll LL:9L Ial 400Z/LZ/90 05/12/2004 06:39 1S6B7400156 blob /at, ismspiairsidniffpfi & mrmhy, SIMPLEXGRINNELL PACE 02/03 Consiruclfon Manclitettlant 9893 corrolr Canyon Rd. Ian Diego. CA 421 Phene R6a7A L0100 rox 0511,740.0156 COST PR9 QMAL (Por palanNal ehengea to anginal owrlroctt Joh: NeEenel City PIro efollon Apo . Paging leaps! Provide and Iretoll additional speaker per PR +L.. t Total Material 2 Sountrrnen of I'arernan 4 Total Lobar a Equipment s Sams Tax 7 TOO (equipment rilnlI t D x foompiefaioite 9 Summon/ of Lobar and Maierialti a OHM* 16 Matelfol Sales Tax 11 ledegptionTeiW to Ttt1oI Equipment w IwragornMinp 14 Waning Cogs IS Engineering Costs 16 SUmmaryTotal RAM 6111Yd104 COMMA #1 1 street Peck. I ,64611 les e i3Ao = ±4rJ,d0 14C4 His9 ss,00 i6500 ,{6.00 r me Lilac 1. 6, 4 $213.116 10%ofUno9 11121M lam iR9r1"36 Sun law Mtn Lino 7 x 3124 x S90 it 6106 SOACIO CKANJI MDR TCTA,, ADDITIONAL QAY3 REGNIBED epaWteen Appeovtrc9 bit KO Names Camenny( Provide and Install Cedlrvntll Roeoker Imo R d34 I P° 0 concot 12000DXB9, toRll�ngl ea ni, remedy C1P.aludInq a utkuul). any way 4drb mounting at tifnplRla evpDOld bunko" puleh nqs in nuns longer tho12a]' andier tl oohduie hxeerttrot fi In elleneter, Fire. aotjIdng, ae,*M s reltfYU work pplohlnp.,paereng, iwrr'Nrj . antafg chitrigi. boblabdade, 49rpaWWiah, n1ourigng at ebe detectarm„9Fo rebm aquArspFriegn Mot reap Sheet No. 1 7,0 S';r Pry: 'ON XH a SRN*UEH E. Lrl7?1H1,1. PROPOSAL/EMULATE FOR CONTRACT ] ATTCPI fTEM OF WORE( PRIME CONTRACTOR IRECT PRIME CONTRACTOR TOTALS NEW OFWORX SITENCONTRACTOR foloomir000ritalmo OugartErea irmai[mdSeria Ont :pii & ease Far Animas (mks creheal arologa i olTheAtamStmLe fira damn+aMe4aimaf GT • i UJ DIRECT SLIR- CONTRACTOR Ti7TM S II/ ATERIAL DottUT111C AinicaUnns 1781 !Hotel CIrc1e South, Saito 187 Phan (919) 291-1430 Fox (01%291.1435 EQ*IPBENI tt•il.'\=MBIPIR 1. TOT SOLI ?BENT UNIT TOAB., RATE sCCM L ABOfi UNIT TOTAL COOT. COAT MATERIAL UlITT TOIPL COST COST 15. i 21000 179L" 173C4 9540 11040 • 110Ba 520 12.00 ROPOSPU i1MATE POR-OQNTl2ALSTYWtFIOATTOAI C IIiEETYIi1EWL3 ,TINIOR [IB19IREVELIBBI.AHDFftWBBBENEFITS 8738E3 WNW iJONT SAIENARCINNOCTAL111111PMEIff Oe51E5 ocuromoronvinormoopooaroBoonsEs BUtROW 440e1116.51•21 ROO 0133111011 CFL1iE3 L SBBIG78L 000111IESSL!j PRO E9REY amootoomotta moo TL cereCTMEMOS S. DIRECT Lwow A. POLIPAHLE.T.MS.WIDFPPICEEPWEES i RFNTALEOUIPNEHr B. SALES Toot GmonooLzooPAoET 7. EY3IAPUENTOYHE93330zENEO INCOPENSEA O. SUBTOTAL (AnpLONG /,7) B. F7ELDCVERNEAD SUBTOTAL Oho Lv 'U MI 21. HOVE OPICE DV!mFAD 3.013 WIDOW 22 PROFIT 10,011.mums 2S. SUBTOTAL IADDLUNFI20 •mil 7233.01,thEli 32.916 OFiJhals 9FLPM71 ;'•;_ a r 2" crime eT VB3 REMAF0029 ThIS 4031 plopOssIE ANSE HetisirosiltoLDaalTandSdenceSldnsandi8onatOaaCA1Vatletne per new mutNat drawings. Elv".- 1.471. OUSSIARX 24. P 1LIE a CN►RACTS7RB IVCAK rawsurolof 25. S'E1B'COw7RAOTORSMIRK IMO/ BOE/4 Z.wawa_ !ADO LJP4 3Z4d20i 27. PEW OVIEBFa+301924SUB•C0NTP4O O WIMP IS 23. P'RAIES HOW OFFICE OVEIBiE.Ai rf LW a 79. PPOILFs P ORI' CEMESI 970. 51.15211 AL (POO Lira 20.2f) -- "3 :"- : .4�10 L. REWCONTRA1 ARI BOND PREMO es untie `."i:i:xa XL TAEAL CCBT NW Ll1 S30 &WO f'i" i ?a4933` x T.47L13 WIMMITED TIME EXTEMSION17N0 Ann i ii il7A'1: PHEW CORMAcToRNAME: SadM'Ekrakotac• MONCTON/ACM *WESTER. SlAttozientArToRmote AlatatiiitColototorpoSkoss, SIGNATURE AIME WPREPAR6t: ILE*Miami ". Nuns CASE CPA CM'S Etre snow SUQFgQPFWfWWOO '4UIle�ea sg14-tgir-619 N rn 1 00 1.