HomeMy WebLinkAbout2004 CON Heffler Construction - Notice of Completion Spec No 02-7PLEASE COMPLETE THIS INFORMATION. RECORDING REQUESTED BY: CITY CLERK OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 THE ORIGINAL OF THIS DOCUMENT WAS RECORDED ON JUL 28, 2004 DOCUMENT NUMBER 2004-0706258 GREGORY J. SMITH, COUNTY RECORDER SAN DIEGO COUNTY RECORDERS OFFICE TIME: 9:40 AM ITHS SPAR FOR RECORDiR'S USE OILY NOTICE OF COMPLETION FOR THE NATIONAL CITY BOULEVARD 14TH TO.18TH STREETS IMPROVEMENTS, SPECIFICATION NO. 02-7. (Please fill in document title(s) on the this line) 1 THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION C2002-47 (Additional recording fee applies) PW/ENG 6/94 Res .Form /R25 RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on May 18, 2004, of the NATIONAL CITY Work of improvement or portion of work of improvement under construction or alteration. on the premises located at National City Boulevard 14th Street to 18th Street, National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: City of National City Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Hefner Construction, Inc, Name of Original Contractor The following work and material were supplied- Foreman, Mason (finisher), Saw -Cutter, Operator and Laborers, Equipment: Bob Cat, Utility Trucks, Concrete Truck, 18 wheelers. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: _ NLA Dated: Joint tenants, tenants in c ers July 6 , 2004; Signature of OwneRi NickYn'Lunza, Mayor City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on Signature: July 6 , 2004, at National City , California. NICK 1NZUNZ MAYOR FORMS/N00O2-7 City of National City, California COUNCIL AGENDA STATEMENT July 6, 2004 MEETING DATE AGENDA ITEM NO. 7 7ITEM TITLE A Resolution of the City of National City Authorizing the Mayor to approve Contract Change Order No. 8, accept the work and authorize the filing of a Notice of Completion for the National City Boulevard 14th to 18t Streets Improvements, Specification No. 02-7 PREPARED BY Alberto Griego DEPARTMENT Public Works/Engineering 336-4386 EXPLANATION On October 15, 2002 by Resolution No. 2002-155 The City Council of the City of National City awarded a contract in the amount of $990,758.07 to Heftier Company Inc., for the National City Boulevard, 14th to 18th Street Improvements, Specification No. 02-7. Contract Change Order No. 8 was done to balance the final estimate, to add or deduct items and to make quantity adjustments. Line item 42 is being added to provide compensation to the Contractor, for price re- negotiation for the placement of pavement fabric per Section 3-2.2.1 of the "Greenbook" Standard Specifications for Public Works Construction 1997 Edition. On May 18 2004 a final inspection was completed and the work was found to be in accordance with the plans and specification. Therefore we recommend the approval of Contract Change Order Number 8, the acceptance of the work and the filing of a notice of completion for the National City Boulevard 14th to 18th Street Improvements, Specification No. 02-7. The current project cost of $1,085,084.56 is increased by $48,957.00 by this change order, to a final cost of $1,134,041.56. CEnvironmental Review x N/A Financial Statement The total cost of the project is Approved By: 'YCI6"'" $1,134,041.56 for construction. This amount is within the estimated budget for this Finance Director project, which is $1,189,000.00 for construction and contingencies. Funding is available through Community Development Commission Account No. 160-461-505-221-0000. Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) 1. Resolution 2. Contract Change Order No. 8 Resolution No. 3. Contract Final Balance 4. Notice of Completion 02-7 ')J304-Il� A-200 (9/99) RESOLUTION 2004 — 119 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDER NO. 8, ACCEPTING THE WORK AND AUTHORIZING THE FILING OF A NOTICE OF COMPLETION FOR THE NATIONAL CITY BOULEVARD, 14TH TO 18TH STREETS, IMPROVEMENT PROJECT (Engineering Specification No. 02-7) BE IT RESOLVED by the City Council of the City of National City, California, as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by HEFFLER COMPANY, INC., Engineering Department Specification No. 02-7, for the National City Boulevard, 14th to 18th Streets, Improvement Project has been completed, the City Council of National City hereby accepts said work and authorizes the filing of a Notice of Completion and orders that payment for said work be made in accordance, with said contract. BE IT FURTHER RESOLVED that Change Order No. 8 is hereby approved. PASSED and ADOPTED this 6th day of July, 2004. ATTEST: N Michas Dalla, City Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on July 6, 2004, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California 61 City lerk of the ity of ional City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-119 of the City of National City, California, passed and adopted by the Council of said City on July 6, 2004. City Clerk of the City of National City, California By: Deputy CONTRACT CHANGE ORDER NO. 8 DATE: 7/6/04 RI I NAL PROJECT: National City Boulevard 14th to 18th Street Improvements, Specification No. 02-7 TO: Patrick Heffler, President Heffler Company, Inc. 1800 McKinley Ave., Suite A National City, CA 91950 DESCRIPTION OF CHANGE: der is written to increase/decrease the following contract items: Amended Contract (Includes CCO #1 to CCO # 7 Quantity Adjustment Increase + /Decrease - Adjusted Contract CCO #8 No. Item Descri . tion Unit Unit Cost Quantit Amount Quantit Amount Quantit Amount 1 Mobilization LS $13,000.00 1 $13,000.00 0 $0.00 1 $13,000.00 2 Traffic Control LS $39,475.00 1 $39,475.00 0 $0.00 1 $39,475.00 3 Clearing and .Grubbing LS $139,136.02 1 $141,411.63 0 $0.00 I $141,411.63 4 Remove and Replace Street Section SF $5.00 11,000 $55,000.00 3628 $18,140.00 14,628 $73,140.00 5 Cold Millin: SY $1.75 7,800 $13,650.00 2,237 $3,914.75 10,037 $17,564.75 AC Overlay TON $51.90 950 $49,305.00 106.97 $5,551.74 1,056.97 $54,856.74 Pavement Fabric SY $1.05 11,000 $11,550.00 -5,026 $5,277.30 5,974 $6,272.70 8 Install Curb and Gutter LF $14.55 1,730 $25,171.50 70.75 $1,029.41 1,800.75 $26,200.91 9 Install Median Curb LF $20.84 2,095 $43,659.80 48 $1000.32 2,143 $44,660.12 I0 Remove and Replace Cross Gutter SF $8.49 1,250 $10,612.50 1226.25 $10,410.86 2,476.25 $21,023.36 11 Construct Colored Concrete Sidewalk Pavin• SF $5.75 18,900 $108,675.00 843 $4,847.25 19,743 $113,522.25 12 Construct Colored Concrete Driveway Pavin_ SF $7.56 4,970 $37,573.20 -284.5 ($2,150.82) 4,685.5 $35,422.38 i3 I Construct Colored Concrete Median Pavin• SF $5.61 3,110 $17,447.10 -692 ($3,882.12) 2,418 $13,564.98 14 Raised Walkway (Pedestrian Ramp Detail 6, Sheet 6) EA $4,550.00 3 $13,650.00 0 $0.00 3 $13,650.00 15 Street Light Pole Standard, Twin Acorn Type "A" EA $5,675.00 27 $153,225.00 0 $0.00 27 $153,225.00 G Street Lighting Electrical System LS $41,500.00 1 $41,500.00 0 $0.00 I $41,500.00 17 Replace Type 2 Detector Loo EA $300.00 31 $9,300.00 -1 ($300.00) 30 $9,000.00 Page I CONTRACT CHANGE ORDER NO. 8 Amended Cont5ract (Includes CCO #1 tol CCO # 7) Quantity Adjustment Increase (+)/Decrease (-) CCO #8 No. Item Description Unit Unit Cost Quantity Amount Quantity Amount Quantity Amount 18 Remove and Replace Curb Inlet Lid (Detail 5, Sheet 2) EA S1,367.36 2 $2,734.72 1 $1,367.36 3 $4,102.08 19 Adjust Street Survey Monument Well and Cover to Grade EA $500.00 5 $2,500.00 -2 ($1,000.00) 3 $1,500.00 20 Traffic Striping and Signage LS $4,648.00 1 $4,648.00 0 $0.00 1 $4,648.00 21 Adjust Manhole to Grade EA $650.00 7 $4,550.00 3 $1,950.00 10 $6,500.00 22 Replace Utility Box and Covers EA $200.00 41 $8,200.00 3 $600.00 44 $8,800.00 23 Tree Grate (Detail 3, Sheet 12) EA $800.00 32 $25,600.00 14 $11,200.00 46 $36,800.00 24 Bench(Detail 4, Sheet 12) EA $1,330.00 3 $3,990.00 0 $0.00 3 $3,990.00 25 Class "A" Topsoil CY $24.16 350 $8,456.00 33.5 $809.36 383.5 $9,265.36 26 Tree-36 Inch Box EA $700.47 76 $53,235.72 0 $0.00 76 $53,235.72 27 Shrubs-5 Gallon EA $12.41 1,018 $12,633.38 0 $0.00 1,018 $12,633.38 28 Sod SF $0.81 2,550 $2,065.50 -100% ($2,065.50) 0 $0.00 29 Fine Grade (Landscape Areas) LS $2,669.12 1 $2,669.12 0 $0.00 1 $2,669-.12 30 Soil Amendment SF $0.70 2,550 $1,785.00 0 $0.00 2,550 $1,785.00 31 Mulch CY $45.00 28 $1,260.00 0 $0.00 28 $1,260.00 32 Irrigation System LS $62,086.45 1 $62,086.45 0 $0.00 1 $62,086.45 33 Paint Traffic Signal Standards LS $12,000.00 I $12,000.00 0 $0.00 1 $12,000.00 34 Install Sewer Clean- Out Type "B" (CCO LS N/A 1 $323.47 0 $0.00 I $323.47 35 Install 160 Feet of Traffic Signal Conduit (CCO #1) LS N/A 1 $325.00 0 $650.00 1 $975.00 36 Abandon Sewer Manholes (CCO #2) LS N/A 1 $1,135.46 0 $0.00 1 $1,135.46 37 Remove and Replace D25 Lid (CCO #3) LS N/A 1 $758.48 0 $0.00 1 $758.48 35 Install National City Boulevard and 9`1' Street Improvements (CCO #5) LS N/A 1 $64,783.97 0 $0.00 I $64,783.97 39 Install SDG&E Conduit and Pedestal (CCO #6) LS N/A 1 $5,769.52 0 $0.00 1 $5,769.52 40 Trench for Fiber Cable, Gas and CCTV (CCO #6) LS N/A 1 $9,034.72 0 $0.00 1 $9,034.72 Page 2 CONTRACT CHANGE ORDER NO. 8 Amended Cont5ract (Includes CCO #1 tol CCO # 7) Quantity Adjustment Increase (+)/Decrease (-) CCO #8 No. Item Description Unit Unit Cost Quantity Amount Quantity Amount Quantity Amount 41 Install Approximately 260 LE of 2-7" Conduit (CCO #7) LS N/A 1 $10,334.32 0 $0.00 1 $10,334.32 -l2 Pavement Fabric SY N/A N/A N/A 5,974 $2,161.68 5,974 $2,161.68 Current Contract (Include CCO #1 to CCO #7) $1,085,084.56 Adjusted Quantities (CCO #8) $48,957.00 e1 11d ndi G6 Adjusted Contract DISCUSSION: Line Item 4 has been increased to provide compensation to the contractor for an additional 3,628 square feet of Remove and Replace Street Section. Line Item 5 has been increased to provide compensation to the contractor for an additional 2237 square yards of Cold Milling. Line Item 6 has been increased to provide compensation to the contractor for an extra 106.97 Tons of asphalt needed to complete the AC Overlay of National City Boulevard. Line Item 7 has been decreased due to the deletion of 5,026 square yards of Pavement Fabric not needed. Line Item 8 has been increased to provide compensation to the contractor for an additional 70.75 linear feet of Install Curb and Gutter. Line Item 9 has been increased to provide compensation to the contractor for an additional 48 linear feet of Install Median Curb. Line Item 10 has been increased to provide compensation to the contractor for an additional 1,226.25 square feet of Remove and Replace Cross Gutter. Line Item 11 has been increased to provide compensation to the contractor for an additional 843 square feet of Construct Colored Concrete Sidewalk. Line Item 12 has been decreased due to the deletion 284.5 square feet of Construct Colored Concrete Driveway from the original contract quantities. Line Item 13 has been decreased due to the deletion 692 square feet of Construct Colored Concrete Median Paving from the original contract quantities. Line Item 17 has been decreased due to the deletion of 1 type 2 detector loop from the original contract quantities. Page 3 CONTRACT CHANGE ORDER NO. 8 Line Item 18 has been increased to provide compensation to the contractor for an additional (1) Remove and Replace Curb Inlet Lid to the original contract quantities. Line Item 19 has been decreased due to the deletion of 2 Adjust Street Survey Monument Wells and cover from the original contract quantities. Line Item 21 has been increased to provide compensation to the contractor for additional 3 Adjust Manhole to Grade. Line Item 22 has been increased to provide compensation to the contractor for the replacement of 3 Utility Box and Covers. Line Item 23 has been increased to provide compensation to the contractor for the 14 additional Tree Grates. Line Item 25 has been increased to provide compensation to the contractor for an additional 33.5 cubic yards of Class "A" Topsoil. Line Item 28 has been deleted because the placement of Sod was done by others at their expense. Line Item 42 has been included to provide compensation to the contractor for price negotiation due to a decrease in the original estimated amount of pavement fabric. This decrease was approximately 46% which exceeds the 25% stipulated section 3-2.1 of the "Greenbook" standard Specifications for Public Works Construction 1997 Edition CONTRACT ADJUSTMENT: As a result of this change order the contract price is adjusted as follows: 1. The contract price is increased in the amount of $48,957.00 from the current contract price of $1,085,084.56 to a new contract price of $1,134,411.56. 2. The contract time is not changed. This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Heffler Company, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 4 t CONTRACT CHANGE ORDER NO. 8 C RECOMMENDED FOR APPROVAL BY: Y Stephen M. Kirkpa is Acting Director of , Date Public Works/Engiieeing C APPROVED BY: AK, Mr.. Patrick Heffler, President Date Heffler Company, Inc. cutu& 64-f-4 Ms. Gina Tarantino Date Heffler Company, Inc. Nick Inzunza, Mayor Date Page 5 RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on May18, 2004, of the NATIONAL, CITY BOULEVARD 14TH - 18TH STREET IMPROVEMENTS, SPEC. NO. 02-7 Work of improvement or portion of work of improvement.under construction or alteration. on the premises located at National City Boulevard 14th Street to 18th Street, National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: City of National City Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Heftier Construction, Inc.. Name of Original Contractor The following work and material were supplied: Foreman, Mason (finisher), Saw -Cutter, Operator and Laborers, Equipment: Bob Cat, Utility Trucks, Concrete Truck, 18 wheelers General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Joint tenants, tenants in common, or other owners Dated: , 2004; Signature of Owner Nick Inzunza, Mayor City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on , 2004, at , California. Signature: NICK INZUNZA, MAYOR FORMS/N00O2-7 City of National City Office of the City Clerk 1243 National City Boulevard, National City, California 91950-4397 Michael R. Della, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 July 22, 2004 County of San Diego Gregory J. Smith Assessor / Recorder / County Clerk Post Office Box 1750 San Diego CA 92112-4147 Dear Mr. Smith: We are submitting the following document in duplicate for recording: NOTICE OF COMPLETION for the National City Boulevard 14th to 18th Streets Improvements, Specification No. 02-7. Please note the recording information on the duplicate copy provided, and return it to the Office of the City Clerk. Sincerely, Martha L. Alvarez Deputy City Clerk /mla Enclosure cc: PW/Eng File No. C2002-47 6) Recycled Paper