Loading...
HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #6 Fire Station #34CHANGE ORDER C/O Number: 6 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: August 31, 2004 11696 Sorrento Valley Rd. Ste 200 Project: National City Fire Station34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Extend sewer line to the inlet side of oil/water separator per RFI 62 [M+H COR 19] $ 1,101 2. Added 6x6 posts and 6x12 beam for connection of stair and all required hardware per RFI 009 [M+H COR 22] $646 3. Precast concrete lid for drafting tank rated for H-20 traffic load set on waterproof gasket per RFI 085 [M+H COR 025] $1,924 4. Added CMU Pilaster at south east entrance per ASI -19 [M+H COR26] $1,042 Please note that all above change orders have been approved with zero day impacts to project schedule. REASON FOR CHANGE: See description above COST RECONCILIATION: Costs were reviewed by the architect and CM and negotiated to the satisfaction of the City. Construction Contract Accounting Sununaiv: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $24,971 The Contract Amount prior to this Change Orders $6,999,556 With this Change Order request the Contract cost is increased by $4,713 New Contract Amount $7,004,269 Change in Contract Time: 0 days Contract Completion Date: Recoimended f r Ap p9va1 by: CONSTRUCTION MANA�R / R&S PROJECT ARC Approved by: ITECT / Jeff Katz Architecture CONTRACTOR/ Marcotte and Hearne Bers DATE OWNER/ City r 7. ""`w 1 6,ci Distribution: City Of National City (original w/all documentation) MH Builders (copy w/all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) Jeff Katz Architecture (copy w/all documentation) DATE DATE DATE rR YO hp•4 RUDOLPH AAA A SLETTEN QZANRAL AN It %.Nt$`N is t`.R.IN{i Co:In' A*tOBS September 1, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject:Recommendation to referenced CORs submitted by M+H Builders Steve: This letter is to transmit our review comments on the following change orders submitted by M+H Builders: 1. COR 019 08/10/04 — Extend sewer line to inlet side of oil/water separator per RFI 062 approved as submitted. 2. COR 022 08/10/04 — Added 6x6 posts and 6x12 beam for connection of stair and all required hardware per RFI 009— approved as submitted. 3. COR 024 08/11/04 — Precast concrete lid for drafting tank rated for H-20 traffic load set on waterproof gasket per RFI 085 — approved as submitted. 4. COR 026 08/24/04 — Added pilaster at south east entrance per ASI — 19 — approved as submitted. We recommend the attached change orders be approved for the submitted amount of $4,713. Please notify me if any additional information is required to process this change order. I may be reached by phone at 619-474-6944, or by email at roman_mcnaughton@rscont.com. Sincerely, Rudolph and Sletten, Inc. Roman McNaughton Project Engineer c: Jeff Katz — JKA/COR 6 file RUDOLPH AND SLETTEN, INC. 10955 VISTA SORRENTO PARKWAY, SUI1 E 100 SAN DIEGO, CALIFORNIA 92130 ILL. 858.259.6262 FAX. 858.259.8282 Rug 11 04 08:18a Jason Sanders 619-474-6926 p.5 MARCOTTE HEARNE BUILDERS, INC. August 10, 2004 Attn: Howard Mills Rudolph and Sletten 10955 Vista Sorrento PKWY, Ste 100 San Diego, CA 92130 Fx 858-259-8282 Via Facsimile RE: National City Fire Station #34 Marcotte & Heame Job No. 04-003 Subj: Marcotte & Heame Change Order Request No. 019 Dear Sir. The contract adjustment required as a result of: RFI #62 — Extend sewer line to inlet side of oil / water separator. Change Order Request No. 019 is $1,101 • The incorporation of this revision into the contractual scope of work will require 0 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re - quote if not accepted within 14 days of its issuance. We HAVE NOT proceeded with this revised work. Please issue an authorization and/or a change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Very truly yore Quotation Accepted By: andRepresenting: t Engineer Date: CC: Stephen Kirkpatrick, National City, 619-336-4397 Jeff Katz Architecture, 619-698-9178 M+HB Jobsite, 619-474-6926 Project File 6265 Greenwich Dr., Suite 250, San Diego, CA 92122 Tel. 858-643-9171 Fax: 858-643-9172 08/11/2004 WED 08:20 [TX/RX NO 9207] 421005 Aug 11 04 08:16a Jason Sanders 619-474-6926 p.6 JOB NO. 04003 COR NO. 019 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 RFI # 62 Relocate piping to correct side of oiVwater separator SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Excavate, remove spoils off site, install piping, backfill and recompact Paul Hanson Equipment $1,038 SUBTOTAL $1,038 5% OH + P 1% Bond Premium Change Order Total $1,1011 $52 $1,090 $11 08/11/2004 WED 08:20 [TX/R% NO 9207] U 006 Aug 11 04 08:16a Jason Sanders 619-474-S926 P.7 AUC-011-2004 13:15 FROM-PAUL NANSEN EQUIPMENT +AI144T066I T-823 P.002/UOZ F-784 UBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST DATE. 81912004 RewsaTentm memo e'tick=BuOdoa. animas **vex martricATION PILINS: RFQt127 11696 Sorrow Vslkv Rd. Suite 200 CONTRACTNLAIWER: Sim Die *.CA92121 PM .JABS 937-04 Atm:Wayne Pemdere OROJECT NANB: N■UOtral Clh tie SIMliOn aKi1 ON Water Seppridor Re mmel ICOR: (Mtw:h mkeatrIrwin wowed, LABOR HOURS HOURLY LABOR N CLASSIFICATION t1A 31./ 212.0 OlFP. RATE COST Laborer Foreman 2 Laborer EleriaRa 3 Operator 314 Yard EH 4 4 $ 75.00 52.00 65.00 $300.00 S200,00 $130.00 S0.00 I00I 00 00 $0.00 1 TERL*Le: tAttadtta4e-etrrAe■ij MATEAf*L imaNN V11ON Eland 4" 114 81314-35 PVC BS Pipe 4" @DR-3S Wye Miss Cone, Parnao. Stakes. R Disposal art 4 30 1 miens Ea. E. Ea 1 LS i LS UNIT GOST 5.65 1.67 16.47 160,Q0 TOTAL LABOR: MATEMAL COST 323.40 $66.10 $16.47 50.00 $160.00 $0.00 50.00 5 $ s $6.00 $0.00 6 6 s0.00 50.00 $0.00 OTHER COSTS: (AtUch itemized information) new dJ.igOM Sacldioo 314Yard Case S $0.00 TOTAL MATERIAL.: 17.79%aline SO SALES TAX: TOTAL. LABOR, !MATERIAL, AND SALES TAX MARK-UP OM LABOR AND MATERIAL Citit WATS S 2 L 5 1 rMT COST S $ OTHER COST 111335Iune 1 $246 Line 2 #iII Line 3 $OS $ S $ - $ SU1 COMTRACTS- *zt d s:ocomzsaa, tor■ jth:- $1T$colilrrACT'ORuianE �I N TOTAL OTHER COSTS: MARK-UP: (sum of lines 4, 5, 8.7) SUBTOTAL: DAICONTRADT $0 Linz $0.00 Line 7 $1.031 line e Ct'SS115: $0.00 Um') MARK-UP; $0.00 use 10 Mai of utw■ 9 eac inn TOTAL SU$CONI RACt CO6T8s $O`Line 11 (Tate- a Lin* a lino 111 ORANO TOTAL -I S1.l2Sllne 12 - r�Mrn rl■ I rM si N TIED BY: TOTAL CHANGE REQUESTED 8Co 1RACTOR Theodore A Brown Li1,4_ T5: 615r.4004 Ed Wd4E:£0 POOZ 60 'b^tl EOSt•£6L: 'ON ?Odd 0N1 SIi3Qllfla 33t-i 3110a2itA4: wom4 08/11/2004 WED 08:20 [TX/RX NO 9207] 1J007 Aug 11 04 08:16a Jason Sanders 619-474-6926 p.8 ManCOrrE iiEARNE BUILDERS, INC. Request for Information 062 Detailed, RFIs without Routing Information Grouped by RFI Number National City Flre Station 34 333 16th Street National City, CA 91950 Project It 04-003 Marcotte + Hearne Builders, Inc. Tel: 858-793-4101 Fax: 658-793-4102 RFI #: 062 Answer Company Jeff Katz Architecture 7290 Navajo Rd. Ste. 106 San Diego, CA 92119 Answered By Jeff Katz Author Company Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Rd. Ste. 200 San Diego, CA 92121 Date Created: 6729/2004 Authored By Jason Sanders Co -Respondent Author RFI Number Subject Discipline Oil Water Separator Architectural Cost Impact Amount Sched Impact Days Yes Not Sure Cost Impact Comments Sched Impact Comments Cc: Company Name Contact Name Copies Notes Question REF: Sheet C-5, Sheet P2.1 Category Clarifica'Jon Dwg Impact Not Sure Dwg Impact Comments Date Required: 716/2004 Storm drain is shown running into the outlet side of the cil water separator on sheet C-5. How would you like to prcceed? Suggestion Answer Se C`P pp AL) 3G- Fat RE yr srz T� �tc <<7 i 45T«J ffDl Frv(y� F2 r u G 7-l-ori Date Answered: 08/11/2004 WED 08:20 [TX/RX NO 9207] t 008 P. 9 Pub 11 04 08:16a Jason Sanders 619-474-6826 18"x18" C /35.89 IE 4". RD PC 01 FOR OIL/WATER SEPARATOR & CONTINUATIONI OF 4" SEWER S E PLUMBING SHT. '2.1 30.74 IE 33.32 IE CONCRETE 31N-CASE 18"x18" CB 32.45 IE 19 SD 32.25 IE 4 S 32.78 lE 6" SD 4' 01.56 SCO 31.36 IE CONCRETE IN -CAS 4" D}VERTER.�VALVE CONCRETE IN -CASE 2" COORDINATE LIST 33.60 IE TI 34.32, IE 4";9.60% C• 33.84 IE N 4"®1.82% 4" RD POC 4. 2 IEm O PT.#/ NORTHING EASTING DESCRIPTION 2056 4 482 .30 SCO 7/1/04 08/11/2004 WED 08:20 [TX/RX NO 9207] Q009 Fug li 04 0S:10a Jason Sanders 61S-474-6S26 p. MARCOTTE HEARNE BUILDERS, INC. Tuesday, August 10, 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Via Fax: 8582598282 Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 022, Dear Sir: The Contract adjustment required as a result of: Added Hardware Beams and Post for Stair RFI 009 Added 6x6 posts and 6x12 beam for connection of stair and all required hardware per RFI 009. Change Order Request No. 022 is S646 The incorporation o` this revision into the contractural scope of work will require 0 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE NOT proceeded with this revised work. Please issue an authorization and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. spectfully, Quotation Accepted By: Sanders Representing: Engineer Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-474-6926 M+HB office — 858-793-4101 Project File 6265 Greenwich Dr., Suite 250, San Diego, CA 92122 Tel.858-643-9171 Fax: 858-643-9172 08/11/2004 WED 09:13 [TX/RX NO 92091 E 012 Rug 11 04 O9:1Oa Jason Sanders G19-474-6926 JOB NO. 04-003 COR NO. 022 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Added 6x6 posts and 6x12 beam for connection of stair. SUBCONTRACT NO. DESCRIPTION Added 6x6 posts and 6x12 beam for connection of stair. SUBCONTRACTOR Rock Coast Framers QUOTE $609 SUBTOTAL 5%OH+P 1% Bond Premium $609 $30 $640 $6 Change Order Total $646 08/11/2004 WED 09:13 [TX/RX NO 9209] 013 11 04 09:10a Jason Sanders 619-474-6926 06-Aug--34 iC:34ar Fran -Porky Coast Fraiers. !n:. ¢(01:•_K ' 's_f'rlRT it. r5tmerS, i ngL Tr' I863 Cormtersiel St.. Esoo^49.1e, CA 92929 (760) 4119-7770 :FIVE r75:04 94'77: 'E :nywcari CIener el �•_ r:.: rm ec_:^ - �. err�i.a`4�i'T %L O+DE to ?r'_T V. _ _ _ j z':'QitiL IUAi� -r -;i;. I 3,LCM/ Uy _____ _ . �... i' ST:wL'. i .v�� w,T7_:SG r E.i:1y i; ;;JICO �a�iG itili4ac �. "..aziana....izy Pi::: ji.aL,11a m3+ mo d. Di,: E.v JTrz,z- i7 t. i:L: 5.L'Yt ra1STLNG CONTRACT NO, 04-003 JOB # 200407 DATE OF EXISTINO CONTRACT 3/26/04 CITY National City DESCRIPTION OP CE ADDED CONTRACT ITEMS RE : RPO# 004 (_'"I DELb J e.0 Added 6 x 6 posts and 6 x 12 beam for connection of cult. Labor 6 man hours ( $49.61 ¢ $297.66 Matrsials = $146.75 Equipment (Grocbdi) = 380.00 Hord ®1%=$5.24 • Subtotal =S529.65 Prot v� 15% = $79.44 Co2-# 2Z IM= EXTEN S:0 N yn; - nv- saprr OR ZED TO MAKE TP E FOLLOWLRC) CRPNOE IN YOUR WORK ON THE ABOVE CAPTIONED PROJECT, IT BENO UNDERSTOOD THAT THIS CHANGE I3 TO BE EXECUTED UNDER THE TERMS OF AND CONDITIONS EMBODIED T2+I OUR CONTRACT, ACCEPTED BY: TITLE FOR DATE ORIGINAL CONTRACT 5 THIS CHANGE ORDER S REVISpn CONTBAc T Ab4OTJNTS 5 �d Wt t t' : 60 C00Z 60 .6 nd 20117 26L 8S8 : 'ON Xti3 3Ndti6H 9110D k W : W023 08/11/2004 WED 09:13 [TX/RX NO 9209] 0014 - Rug 11 04 09:10a Jason Sanders 619-474-5026 .: t o;_ n P2,- t L Request for Informat _.^ 009 'Jelatlec7, R,= Is v.RhoJt Rout1n8 Informal(pr _ . _ by f2FI Number 9 uit_ D E 0 9, I N.C. National City Fire St2tion 34 333 16th Streel National City. CA 01050 Protect A 04-003 blarcocto - Hearne Builders, Inc. Tel: 358-783-4101 Fax: 358-793-4102 RFi Il.' 1109 - Da*c Created: 4f28i2O04 Jeri Katz Architecture 7290 Navajo PO Ste. ',Cc Se nUego. CA 92119 Stair Connection Detail Jeff Kara Rlcherdson Steel Inc, _,_ Carson 9102 Harness St. Spring Valley. CA 91977 .. a� t+.,J4�:. 'L,�+:7',T^v,IYlliu411�•YSSI:(i�{tfJunl.�F��cB..rl�.t f:::-.� ._. .rFdl�_'. .__:�,. 3 f l:;.-,'r3[f•$,���1�, '�r1-T;h.;_c= '��1_.',>i., ;'La{a�grry ..��___�itim^Fe:.� Structure! Clerificatic- �tlA'E�t'iiivy��s:,....;:1_'. Not Surie NO!. Sure lumen;it].Y�,,.;`'t�•4'4.91a?ty17E{gt Not Sure L"_4vf6'64 Cegi ii. k �gUlrm�1''�r4.3-7W.4": (See attached sleets 4 pages to:31 The attached pages havo out intorprotohon of etalr design. We need 2-wood posts et landings. zoo ' - .rood header et 2nd floor to support out steel stair, Please approve sizes and connections es indicated by c oudec z This concept will apply for both stair *1 anc stair »2. SIrsQ'2it1%D . r We take rC excepticn !o coding 6x6 costs and 6x12 bears for connection of sta r stringers and I?ndinc. Provide additional (2) Sampson SDS 1/zx3' lag screws at 16" oo for connectlen channel and add (2) Simpson SOS 1/4x2' wood screws to convect inner channel stringers to center wal studs. as indicated en attached sketch Response By: Jeff Katz AIA Prorog Manepor Pr:nrod cs. 42fl12004 ?tA7 Dlz^aco Td�ia .., _tf � 05/ 11 /04 Page 08/11/2004 WED 09:13 [TS/RS NO 9209] Z 015 - Aug 11 04 09:10a Jason Sanders 819-474-6926 FSOrl :MfP.=OTTE HEPP`E 04/26/2204 15:07 Apr- 26 [14 C9:40a Cipx15.3 9-RP.:: a7 11f, Ror. . Cr. 6196979451 9iC!-AR1730:q SEE hC PAGE 04 Steel Detailing Online 97046/0745 le•2 4 "PL W/2-0 THRU BOLTS r- 2ND FLR WD HEADER 5Y OTHERS) DETAI'__ — 3 LAHDiNG f P THRu aotrs C10PER PLAN WD POST La X BY OTHERS 08/11/2004 %VED 09:13 [TX/RX NO 92091 Z 016 (Aug 24 04 07:14a Jason Sanders 61S-474-6926 MARCOTTE HEARNE BUILDERS, INC. Tuesday, August 24, 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego. CA 92130 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Via Fax: 8582598282 Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 025 Dear Sir: The Contract adjustment required as a result of: Precast Concrete Lid for Drafting Tank Request For Information: 085 - Drafting Tank D-3 ASI-19 Cost associated with providing a precast concrete lid rated for H-20 traffic leading set on waterproof gasket. Per ASI-19 Change Order Request No. 025 is $1,923.75 The incorporation of this revision into the contractual scope of work will recuire 0 working day not included in our current schedule. The job schedule will be adjusted accorci-,aly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE NOT preceded with this revised work. Please issue an autnor.zation and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Respectfully, Quotation Accepted By: Jason Sanders Project Engineer Representing: Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-474-6926 M+HB office— 858-793-4101 Project File 6265 Greenwich Dr., Suite 250, San Diego. CA 92122 Tel, 858-643-9171 Fax: 858-643-9172 08/24/2004 TUE 07:18 [TX/RX NO 9460] 11004 Aug 24 04 07:14a Jason Sanders 61S-474-6926 p 5 JOB NO. 04-003 COR NO. 025 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Install Precast Concrete Drafting Tank Cover SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Provide and Install precast drafting tank cover Paul Hanson $1,814 SUBTOTAL 5% OH + P 1 % Bond Premium $1,814 $91 $1,905 $19 Change Order Total $1,9241 08/24/2004 TUE 07:18 [TX/RX NO 9460] 2005 Fug 24 04 07:14a ason Sanders BUG-'9-2004 10:15 FROM-PAUL HANSEN EQL0PIAENT 819-4 4-S926 F. +•8194470681 --350 P 002/002 F-650 SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST REQUESTED BY: Marattte - Hearn Builders. 11696 Sorr,rnto Va1ky Rd. Suite200 San Dicte, CA 92121 At71:Wayn,e Powderly PROJECT NAME: National City Fire Station 034 DATE: - 8/19/2004 CHANCE IN WORK NOTIFICAnoN NUMBER: RFQ#34. RFI 4t085 CONTRACT NUMBER: PHI Job p 937-04, Drafting Tank Vault Cover (Revised; LABOR: (AtLacn taKe-oft sheet it newlc.-a; REF NUM LABOR Ct L 5IF1CATION HOURS x1.0 x1.5 x2.0 DIET. HOURLY PATE LABOR COST 1 Laborer Foreman 1 3 75.00 $75.00 2 3 - $0.00 3 $ - $0.00 4 $ - $0.00 5 $ - $0.00 6 S - 30.00 7 $ - $0.00 8 5 - $0.00 MATERIALS: (Abaci take.aff y-.et0 TOTAL LABOR: If TX. 575 REF MATERIAL DESCRIPTION UNITS UNIT COST MATERIAL COST 3 $0.00 2 $0.00 3 $0.00 4 5 6 3 $ $0.00 50.00 30.00 $0.00 8 $ 30.00 9 10 11 12 13 5 $ $ $0.00 $0.00 $0.00 $0.00 $0.00 OTHER COSTS: (Atiarlt itemized inF.,rmstion) REF DESCRIPTION TOTAL MATERIAL: (7.75% of Line 2) SALES TAX: TOTAL LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIAL OTY UNITS UNIT COST OTHER COST SO Line 2 SO Line 3 $75 $11 1 $ $ 2 3 3 3 3 3 4 5 3 3 $ 6 3 S 7 $ - 3 SUBCONTRACTS: (Attach Sutxxon:rac+ars Deposal) REF SU6tONTRACTOR NAME / DESCRIPTION TOTAL OTHER COSTS: MARK-UP: (Sum of Lints; 4, 5. 5.7) SUBTOTAL: SUBCONTRACT COST Jensen Precast Cover $ 1.000.00 2 3 4 Trucking & Delivery Tax $ 425.00 $ 77.50 $0- SBG Line 4 Lint SO Line o 00 Line 7 Line 8 SUBCONTRACT COSTS: MARK-UP: (Total of L:nes 9 an0 10) TOTAL SUBCONTRACT COSTS: (Total of Linos 8 end 11) GRAND TOTAL $1,502.50 $225.35 Line 9 Line 10 $1,1281Line 1t $1,814 Line 12 SUBMITTED BY: Theodore A. Brown P.,Lce)_ TOTAL CHANGE REQUESTED BY SUBCONTRACTOR: $1,814 DATE. 8/19/2004 08/24/2004 TUE 07:15 [TX/RY NO 94601 Z 006 U.. L 0) c 0 IT r, 0 N bA =7 a 4n -342 P.002/002 I0 or b FRO1-PMJ. HANSEN EQU!FENT 0 N CD C J6102SL ,9-I6-ifl, �i % 102' CP/E, NAB X 6- IYA 4f/0 CF(1:NC. (R-3610251.AB-fa -S01) wr, 1.911 LAr. 1"0'A C.LV CCU_ R -i 1/j- LIFT 1iS R1S. LOCATE AS rcuo -s, TOP SUB (4) SURFA[r 010. 5' rep Q- PLAN vv_ 102' e4R teMpAN 1 _ 3 SIDE SECTION 0 �-I 4 FL 1/2' CLR V4 II O 0 BILL OF MATERIALS ibm ply, pf tcrtptlon Ft A 11 [ S R WL L1 CFl('(Bl L7 �rM X Sl B 4 t 4 RERXR X 98 32 :Tsa 37.7 71.8 86 Cr .t 1 < j j ; G i iV co - CV o 0 .c 0 0 C( .1 < ♦ 11 1-L-1--1-----1-._i -1.1 tr0Z 1. +L 45544$454' ALL GM.RY ID Arm a.44 7. 341115U441 (f R040.40 SSCO. 6 :i W. S. M 611.1.4. (('G a05 4153J((AIt 11@ q Ar r0upat e) 1- rU uR pt an,1`t r (5 nra cr 4.4 (•7) VC ran 13-0,11 art (f) u,rfs UMUb.c 1,471 . 'Oa 1. uRQuiw (4 flnq (5 CXr[ r 1/: (rn.,,l - a (..1.. (7 eux u.D nef Vier Re 'i CATUM r i`ti r-- - REINF-, PLAN VIEW RfINE. SECTIONy�4Y PAUL HANSLN EQUIPMENT NATIONAL CITY, CA. S.O.# (1) UNIT REQ'D Please Review & Sign X IEll5PRErAI5l1 • 1421 SAN BERNARDINO AVE., FONTANA, CA 92335 net (f (H hvp [CULL CF Ta3 UMXAG /.A( 0 rACf F-rrry or .ONA(n 'RECAST •n0 mar 40 H Y'.h am.. 440-1. ).4 py Wry W0X. ofrir. NP0 ,1W(U('ly 4I000 AK Rif0(Y10. Y.W.r SY. . NtL %kr, YK [d-I1-44 I:1'..0' 36° X 102" TOP SLAB X 6" 1HK. W1iHO0i OPEC - SPECIAL Y Ra: 36102S JkB-T6-SO4-44A Roman McNaughton From: Sent: To: Subject: Jason Sanders (jsanders©mhbuilders.com] Thursday, August 26, 2004 10:32 AM Roman McNaughton; Wayne Powderly; Steve Kirkpatrick: Jeff Katz; Howard Mills; Dave Porter; Bill Hearne Drafting Tank Lid Drafting Tank Lid.pdf (373 KB)... Drafting Tank Lid Jeff, As requested attached is the shop drawing showing the precast Jensen Lid. Upper right corner of shop drawing states that lid is designed in accordance with AASHTO H-20 tr loading using 5,500 PSI compressive strength concrete and 60,0:: 2 yield strength =gr i_ 60 A-706 reinforcement. 1 NV- i?OS --ql-OTIO 9r. 3dOIfICRum ,9 X MS dOi • i:UNCtItt Mkt,tall`eO6s;ntt:sat 4T4,*4 3.2) Pat.W5:4 0 ;,,S;c',3 t11"•:r. f3f,r9 ).V<::Giev4 S'AN7S'' A,`> .4.2,3,4a.vc1 :.1:.(t .1%.W Cqf •••.7c:'-e.fi Vs1t WONIOZ-IVNN3.8 OS AWO'fi. Maid V),) is ())% 13)"X )4:71r0 MX) k3a,t 25.witSM)1 %.,4 -Yrt,4 ))))m))))) .643 qf TIAZIS i.11.3Z.LQ$ .9* ,t4e4at/.1tto-J 'W<.•Y NW/ ?; ^rmit; o:4?nernzTh 'KW? , • Et"r..) ;at t TN; 3:i t otcz • O 1W401..1VN dl n o N3SNVH -111Vd NVTT..... ) :'.• ,, • : t i LJ ttE) z EWEN A):' •-- U triqThsi g YW j 110 • € ,rAttv ft) j333.3t$rt .,?/)1.'it();) tr::73.„3 $."•• ...^..''t•K2'.(')E sr.- ) gf1")) ,t))3) 4)) t,fORD5 1c117, an. .17‘, ... • .„/ •.?`; 7 ?)%1?•••')33 fit.? O31< 3Sd Ot01;9 ".:312..1ItIO 9NE(tvirrt Ostp,SN,,n OYii Rug 24 04 07:14a Jason Sanders 619-474-6926 p.8 Tuesday, August 24, 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 MARCOTTE HEARNE BUILDERS, INC. Via Fax: 8582598282 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Subj: Marcotte + Hearne Builders Inc. Change Order Request No_ 026, Dear Sir: The Contract adjustment required as a result of: Add CMU Pilaster at South East Entrance Per Owners Meeting 8/10/04, ASI-19 Change Order Request No. 026 is $1,042 The incorporation of this revision into the contractual scope of work will require 0 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE NOT preceded with this revised work. Please issue an authorization and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Respectfully, Quotation Accepted By: Jason Sanders Project Engineer Representing: Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-474-6926 M+HB office - 858-793-4101 Project Fite 6265 Greenwich Dr., Suite 250, San Diego, CA 92122 Tel. 858-643-9171 Fax: 858-643-9172 08/24/2004 TUE 07:18 [TX/RX NO 9460] l 008 Aug 24 04 07:15a Jason Sanders 61S-474-S926 p.9 JOB NO. 04-003 COR NO. 026 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Add CMU Pilaster at South East Enterance • SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Add CMU Pilaster at South East Enterance New Dimension $983 SUBTOTAL 5% OH + P 1% Bond Premium Change Order Total $1,0421 $983 $49 $1,032 $10 08/24/2004 TUE 07:18 [TX/RX NO 9460] Q00 9 Aug 24 04 07:15a Jason Sanders FROM :MARCOTTE HEARNE FRX NO. :858 793 4102 Aug. 18 2004 03:57PM P4 ..� 88/1$/2804 15:27 619-276-B319 NEW DIMENSION PAGE 01� off`' New D irnension Masonry Inc. August 18, 2004 Attu: Mr. Wayne Powderly Marcotte & Hearne guilders, Inc. 11698 Sorrento Valiy Rd.. Ste. t11200 San Diego, Ca. 92121 61S-474-G826 p.10 (819) 276-5000 • FAX (519) 2754339 Office Tel / Fax 858-793-4101/4102 Project: National City Fire Station #34 Reference Subject Change Order Request 11007, RFQ 4037, CMU Pilaster Dear Wayne: We are submitting the following Increase in the Amount of S983.00 For RFQ if037. A cost breakdorm is attached. There Is 1 days time extension associated with this Change_ Piaaas indicate your approval by signing this request or by issuing a Change Order for this work at the earliest. Sincerely, New Dimension Masonry, Inc. Darin Winningham Project Manager Accepted: Date: 1018 Cudahy Place, Butts A • San Diego, CA 9211 0-3929 Ltc. # 830794 C-29 08/24/2004 TUE 07:18 [TX/RX NO 9460] Ij010 Aug 24 04 07:15a Jason Sanders FROM :MARCOTTE HERRNE FAX NO. :B58 793 4102 09/19/2004 15:27 919-276-B339 NEW DIMENSION - PAGE 02 tikbeecttra•eeor Clump Order Request 0007 Project: National City Fos Station #34 De raipbon: RPQO37' Add CMU P�7.atrr Subcontractor Field Work Order * MIX CRk PRO ItP0 37 Wads Authorised By: 819-474-692G P.11 Rug. 18 2004 03:57PM P5 • NDM Jabe 2A025 Date! 4/111V2004 Ia4ert $trlelit Time Hours X Rate boa lob Tilde: S34.75 S139.00 Masco 4 9.39 S11S.36 Mason Tinder - - $59.1S C Tender 2 - -- Subtotal $316.54 Lobar: Over Vale Job TRW Masan. Mason Tender Cleanup Tender Labor Burden (it Hama X Labor Burden @ yam, S79.14 SeWATWeTad I S395.614 Bata F,xhpaha: 15.34 15.34 Subtotal �9 25% WOO Orea'lns Taal 6100 Labor Total: $39S.66, 08/24/2004 TUE 07:18 [TX/RX NO 9460] [Z011 Aug 24 04 07:15a Jason Sanders FAX NO. :858 793 4102 Aug. 18 2004 03:57PM P6 FROM :MRRCOTTE HEARNE 619-474-G926 p.].2 08/18/2004 15:27 619-275-8339 NEW DIMENSION sl[bcontsia'br Clwrys Oed.e Request Pastlt2. of 2 PAGE 03 Mdae1.1 Desorlf omm Usk VaottlRY Cod Pis Unit Estett.ba CMU r, 2,4.0 54.55 _ $109.20 l4etr SK 2.0 S4.00 i12.00 trouts, 5000 Psi cu. Yds. OA 510100 _ S42.00 Reber, 04155m 1..5- 10 3132.00 5132.00 ?remit Cap. 1.0 S47.34 CV (Inn S0.00 Snbeorsl Tax $26.56 Msfeelal Total:. ST410assat Unit Equivalent 61D 1t%oftotal labor Saw Blades Sort Puncio3 QuatlitY E 3369.101 Cant Per Untt H,taoakdi 111.00% $7122 11 Tax Equirasaut Total j 576,74( Mao, li cpsodables: vain Qwoity Coat Par Wit Fxamooe QKCPe $3.00 Slfor Mntdtdi Tian Control Joints Th700 sobtoatl 'fax 0 Eapaedabtes Total SUBTOTAL: Ortrbead A Ptvst 1sand: Tonal Contract Chong* Request Eitts+.ta r,.p.ed By; Dow Date Submitted I s0.aoj $7,41.721 15% S126.26 L50% S11.52 4V1&zoo41 08/24/2004 TUE 07:18 [TX/RX NO 9460] a 012 FROVIPE PILASTER AT END OF WALL THIS MODIFIES INFORMATION S-4Sh ON BI/ALS MD C3/4IS Jeff Katz Architecture 7290 Navajo Rd, Suite 106 -San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkalzarchttecture.com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 kchitect Supplemental Instructions PROJE-GT NO; 011101 Pare: 08/11/04 nn>=: PILASTER ADDITION ASI-19 SCALE: 1/4" = 1'-0" SHEET NO. X-51