HomeMy WebLinkAbout2004 CON Dokken Engineering - Plaza Blvd Project Agreement #2City of National City Department of Public Works 1243 National City Blvd., National City, CA 91950 (619) 336-4580 (619) 336-4380 Fax: (619) 336-4397 August 9, 2004 Dokken Engineering 9665 Chesapeake Drive, Suite 435 San Diego, CA 92123 Attention: Mr. Kirk Bradbury, Project Manager SUPPLEMENTAL AGREEMENT NO. 2 Project: Plaza Boulevard Widening, Engineering Specifications No. 99-9 Subject: Supplemental Agreement No. 2 — Providing Coordination with Caltrans Design, Filipino Village Project Coordination, Adjustment of Project Geometries, SANDAG Progress Reports and Status Meetings, Project Management during Extended Project Duration, and Revision of Billing Rates This is Supplemental Agreement No.2 to the original agreement dated February 12, 2002 between the City of National City and Dokken Engineering, the consultant to provide civil engineering services for the Plaza Boulevard Widening Project, Specification No.99-9. This supplemental agreement provides for an additional not -to -exceed $123,388 for a) Providing Coordination with Caltrans Design; b) Providing Filipino Village Project Coordination; c) Providing an Adjustment of Project Geometrics per Public Works Request; d) Providing SANDAG Progress Reports and Status Meetings; e) Providing Project Management during Extended Project Duration; f) Production of a Project Study Report/Project Study (PSR/PR); g) Revision of Billing Rates; h) Revision of Plaza Boulevard Traffic Study; i) and Update of the Environmental Document. The purpose of the additional work is as follows: a) Providing Coordination with Caltrans Design is to respond to recent Caltrans requests regarding additional project traffic analysis. b) Providing Filipino Village Project Coordination is to help facilitate continuity between the Plaza Boulevard Widening project and the City's Filipino Village project. c) Providing an Adjustment of Project Geometrics is to satisfy a Public Works request to review and revise the project geometries if feasible to reduce right-of-way acquisition requirements on the south side of Plaza Blvd, east of Palm Avenue. d) Providing SANDAG Progress Reports and Status Meetings is to satisfy SANDAG requirements regarding project status and funding. e) Providing Project Management during Extended Project Duration is to prepare meeting agendas, meeting minutes, progress reports, exhibits and memos and attend project meetings during the extended project duration from a planned duration of 18 months to a current 25+month project. f) Production of a PSR/PR is to satisfy Caltrans' request for a PSR/PR within state right-of- way due to the complexity of the project. 1 ® Recycled Paper g) Revision of Billing Rates is to update Dokken Engineering's billing rates based upon actual costs. The purpose of h) Revision of Plaza Boulevard Traffic Study is to satisfy additional analysis requested by Caltrans. i) Update of the Environmental Document is to include the Revised Traffic Study in the Environmental Document. Details of the extended scope of work, cost estimates, schedules for this supplemental agreement are included in the attached Exhibit "A". Proposed Contract Amendment No. 2: Original Contract: Amendment No. 1: Amendment No. 2: Revised Contract Amount: Prepared by: Din Daneshfar City Project Manager Acceptance by: Consultant Project NY/anager Attachment: Exhibit "A" Exhibit "B" Exhibit "C" Exhibit "D" ate: �15�o4/ Date: S/z si.,4 $309,701 $ 14,148 $123,388 $447,237 2 Approved by: Na, Mayor Date: 9/7/04 PLAZA Boui1 ARD WIDENING -- CITY OFNATIONAL OCITY EXTENDED SCOPE OF SERVICES Task 1.0 Provide Caltrans Coordination Task 1.01 Attend Meetings with Caltrans Staff: Dokken Engineering team members will attend five meetings with Caltrans staff to discuss additional traffic studies requested by Caltrans Design. Task 1.02 Attend Meetings with National City Staff: Dokken Engineering team members will attend two meetings with National City staff to discuss additional traffic studies requested by Caltrans Design. Task 1.03 Prepare Meeting Agendas, Meeting Minutes and Exhibits: Dokken Engineering team members will prepare for and follow-up with Caltrans and National City staff meetings by preparing and distributing meeting agendas, meeting minutes and project exhibits. Task 1.04 Prepare Draft Letters to Caltrans: Dokken Engineering will prepare two draft letters for review, approval and signature by National City staff that explain the City's position with regard to additional traffic studies requested by Caltrans Design. Task 1.05 Prepare ILV Intersection Analysis: Dokken Engineering team members will prepare an ILV Analysis for the two I-805/Plaza Boulevard ramp intersections for existing intersection geometrics and proposed intersection geometries for the 2027 design year. Task 2.0 Provide Filipino Village Coordination Task 2.01 Attend Meetings with CDC Staff Regarding Filipino Village: Dokken Engineering team members will attend five meetings with National City CDC Staff to provide coordination between the City's Plaza Boulevard Widening project and the City's Filipino Village project. Task 3.0 Adjust Geometrics Task 3.01 Adjust Preliminary Project Geometrics near the California Produce Market: Dokken Engineering team members will review and adjust if feasible project roadway geometrics in the vicinity of the California Produce Market in an effort to reduce the required right-of-way acquisition. Plaza Boulevard Widening, Preliminary Design Plans, Environmental Documents and Cost Estimates, Supplemental Agreement No.2 City of National City 8/09/04 DOKKEN ENGINEERING www.dokkenengineering.com EXHIBIT "A" PLAZA BOULE i 4RD WIDE ING - CITYOFIVAT.IONAL CITY Task 4.0 Provide SANDAG Progress Reports and Attend SANDAG Project Status Meetings Task 4.01 Prepare SANDAG Quarterly Progress Reports: Dokken Engineering team members will prepare Quarterly Progress Reports related to the project's federal funding and required by SANDAG during the current project phase. Task 4.02 Attend SANDAG Project Status Meetings: Dokken Engineering team members will attend Quarterly Project Status Meetings at SANDAG's office related to the project's federal funding and required by SANDAG during the current project phase. Task 5.0 Extended Project Duration Task 5.01 Attend Additional Meetings: Dokken Engineering team members will attend additional meetings during the current project phase due to the extended project duration. The current project phase was expected to last 18 months, but the current phase has been underway for 25 months. Task 5.02 Prepare Meeting Minutes and Progress Reports: Dokken Engineering team members will prepare additional Meetings Minutes and Progress Reports due to the extended project duration. The current project phase was expected to last 18 months, but the current phase has been underway for 25 months. Task 6.0 Revise Plaza Boulevard Widening Traffic Study Task 6.01 Revise Plaza Boulevard Widening Traffic Study: Linscott, Law, & Greenspan (LLG) will revise the current Plaza Boulevard Widening Traffic Study, dated July 17, 2002. Traffic study revision will consist of: • Update the forecast traffic volumes to Year 2030 and utilize a compounded 0.5% per year annual growth factor. • Revise the 2030 ILV analysis as appropriate. • Conduct an existing AM/PM peak hour count and analyze the Plaza Boulevard/Grove Avenue intersection using the ILV methodology. • Conduct a 2030 analysis of the Plaza Boulevard/Grove Avenue intersection. • Revise the ILV intersection analysis at the I-805/Plaza Boulevard interchange with the 2030 Volumes. Plaza Boulevard Widening, Preliminary Design Plans, Environmental Documents and Cost Estimates, Supplemental Agreement No.2 City of National City 8/09/04 DOKKEN ENGINEERING www.dokkenengineering.com EXHIBIT "Al" PLAZA- BOLTLEI 4RD WIDENING CITY OF NATIONAL CITY • Prepare the Highway Planting section describing new or replacement highway planting. • Prepare the Permits section discussing the status of required permits from other agencies relating the proposed work. • Prepare the Right -of -Way required section describing the need for, and the status of, any additional right-of-way to be acquired. • Prepare the Hazardous Materials section discussing potential hazardous materials and attach the Initial Site Assessment. • Prepare the following attachments to be included in the Combined PSR/PR o Appropriate Map (locations, geometric, etc.) o Typical cross sections o Appropriate environmental documentation (as prepared by the project environmental engineer) o Cost Estimate o Executed Pre -approved Cooperative Agreement o Right of Way Data Sheet o Hazardous Waste Initial Site Assessment o Provide the Administrative Draft PSR/PR to National City for review. Deliverables: o 15 copies each of the Administrative Draft PSR/PR to National City. Task 7.02 Prepare Draft Project Study Report/Project Report: Dokken Engineering will prepare a Draft PSR/PR for review by National City and Caltrans. Preparation of the Draft PSR/PR will consist of: • Summarize review comments to the Administrative Draft PSR/PR in memo format. • Revise the Administrative Draft PSR/PR per review by National City. • Prepare the Draft PSR/PR for review. • Provide the Draft PSR/PR to National City and Caltrans District 11 for circulation, review and comment. Deliverables: o 15 copies each of the Draft PSR/PR to National City and 25 copies to Caltrans District 11. Task 7.03 Prepare Final Project Study Report/Project Report: Dokken Engineering will prepare a Final PSR/PR for review by National City and Caltrans. Preparation of the Draft PSR/PR will consist of: Plaza Boulevard Widening, Preliminary Design Plans, Environmental Documents and Cost Estimates, Supplemental Agreement No.2 City of National City 8/09/04 DOKKEN ENGINEERING w w w. d ok k e n e n g in e e ring. com EXHIBIT "A3" PLAZA BOULEVARD WIDENING - CITYOF NATIONAL CITY • Summarize review comments to the Draft PSR/PR in memo format • Revise the Draft PSR/PR per review by National City and Caltrans District 11. • Prepare the Final PSR/PR. Deliverables: o One original of the Final PSR/PR for approval. Task 7.04 Obtain Final Project Study Report/Project Report Approval: Dokken Engineering will provide support for the Final PSR/PR to obtain Caltrans District 11 approval. Approval support of the Draft PSR/PR will consist of: • Provide the Final PSR/PR to the Department for approval. • Work directly with the Department District 11 staff to obtain the approval signatures if the Department Project Manager and District Director. • Obtain concurrence from the San Diego Association of Governments (SANDAG) Deliverables: 0 15 copies each of the Final PSR/PR to National City and 25 copies to Caltrans District Task 8.01 Update the Environmental Document with Revised Traffic Analysis: EDAW will revise the EA/IS to accurately and consistently reflect a 0.5% annual traffic volume increase through 2030 once the traffic analysis is updated and a new traffic technical study is provided. These changes will be incorporated to the following sections of the EA/IS: • Traffic section of the EA/IS • Initial Study • Mitigated Negative Declaration Task 8.02 Additional NEPA/CEQA Meetings: EDAW will attend three additional meetings to discuss the environmental processing procedures and roles involved in the Caltrans/Federal Highway Administration Local Assistance Program. EDAW will prepare for the meetings in order to explain the role the Federal Highway Administration has as the Lead Federal Agency under NEPA, Caltrans role as Agent for the Federal Highway Administration, and the role National City has under this unique process as the Lead State Agency. Plaza Boulevard Widening, Preliminary Design Plans, Environmental Documents and Cost Estimates, Supplemental Agreement No.2 City of National City 8/09/04 DOKKEN ENGINEERING www.dokkenengineering.com EXHIBIT "A4" Plaza Boulevard Widening 8/9/2004 FEE PROPOSAL go:00 ENGy1(E04:: NAME FUNCTION HOURS RATE AMOUNT Kirk Bradbury Project Manager 198 $51.00 _ $10,098.00 J. Bishop Senior Engineer, Civil/Structural _ 13 $46.00 $598,00 Chris Johnson Senior Engineer, OA/OC 16 $53.50 $856.00 Gerard Lumabas, Jeremy LaHaye Associate Engineer, Civil /Structural 324 $35.00 $11,340.00 Kristina Dominguez, Jeannie Pham Assistant Engineer, Civil /Structural 217 $26.25 $5,696,25 Eric Vaughan Detailer, Civil /Structural 94 $24.25 _ _ $2,279.50 Reina Sawyer Word Processing /Intern 28 $24.00 $672.00 INDIRECT COSTS (OVERHEAD) OVERHEAD A Billed at Actual Cost TOTALLABOR 183.00% $31,539.75 TOTAL OVERHEAD $57,717.74 ITEM 1 QUANTITY UNIT UNIT COST AMOUNT Aerially Deposited Lead Study 1 Direct Cost $7,000.00 $7,000.00 Binders and Reproduction __ 1 Direct Cost $1,200.00 $1,200.00 FEE (PROFIT) PERCENTAGE $8,200.00 12% FEE $10,710.90 DOKKEN ENGINEERING TOTAL COST $108,168.39 EXHIBIT "Bl" Plaza Boulevard Widening 8/9/2004 FEE PROPOSAL EPA1 NAME FUNCTION HOURS RATE AMOUNT Ray Hrenko Senior Associate 30 $52.88 $1,586.40 $311.08 Marty WatsonNalarie Yruretagoyena Environmental Analyst 14 $22.22 TOTAL HOURS INDIRECT COSTS (OVERHEAD) OVERHEAD TOTAL LABOR 150.00% $1,897.48 DIRECT COSTS Billed at Actual Cost TOTAL OVERHEAD $2,846.22 ITEM QUANTITY UNIT UNIT COST AMOUNT Item 0 Unit $0.00 $0.00 FEE (PROFIT) PERCENTAGE TOTAL DIRECT COSTS $0.00 12% FEE $569.24 TOTAL COST EXHIBIT "B3" $5,312.94 E iN' iitinixa .. 88 g i - -I - , to 1 _ 6-- — i — 4 18 ' 8 im'. 1 Sle IMP IMfl TOTAL1101019 • MVO • , ,S t ,gg, S Ma .,... " - r12 ,[2[ 1 ''.-S1 g I S 6 ' I18 4 i 2444 ;., Si! i 1' TOTAL 1101.119 • 1,19(1 ' ! f _ li-3 . PROJECT FEE PROPOSAL City of National City Plaza Boulevard Widening Preliminary Design Plans, Environmental Documents and Cost Estimates Fees by Task and Person Tasks by Project Management, Preliminary Design Plans, Environmental Documents and Cost to Estimates Amendment No. 2 1-S-16/8260 EgIE 8488.4 0, , § 8,48 n ; 42886. _ _ 21858.72 s a ,assw.....in at ftwh„..g. A 8888. " , o. 18 18 C a assa. 2 18 tstS gags,, t a ttt sass. SwwWCweer (WrI/SWOMI - n 8 St4 88818,,, , 2 1 8 28818. 4 42 8 4418 asst. 2 482 sssa PVl. dg 2882. r a StT gg atassa InI s 8 8888. - sass . -1 a 2812g8 ,,,, 2t 82!40 . ' . 4 jI WIi 8282. S II 1: i I1 8 ttS G828. 4 8 828; 80884 8 8888 4444 '4'1.11 W 2882. 44 it444; I WWeWnsWfwl . . WWIEgwer CwWwwwal n 11 ; 8:s: 2;0 y_ 18 .f i111:::::. :1 WwCWWWW _:: : :::: : :: :: . .i: v1:: ,:: ,-RRs8R.82 48 .a• . ft.pmmnum:: ",. ! s t ENE .-. 3188 It.- 10n16, 11 "It ;VA .,as 8818 . E t S rat o'S' gr t- , 1 t t -- t nrrl stt 1382 tT, , rg It 'a IT'S ins gas 8..lin.a 1. l 11° w WWI 4 2 „ m 8 rE a- 8888868 I n 8 n 8 88. E E 8 4 8883, ; , I g 8 ggst 8282, • g 81 ggrnt 28881. ,4 4 8 .822866 2 1 pr...1 , 4i4 A s g4; taast.g, 4 s 2288 sass. s a ttsS ssss. 1 .2 ntt ssts, It is 8222. Rg ' V2 'T. Eg-S 88188=.. .1 1 4.614akomEnyirii 4 2 Wi; 44888 $ia 8 8 gttS 8888. t _48 tEnS 8828. 1 i 8 tang 202844 i AI 'it [18 nnnS 8E841 i 2 6,8 I ;nil G 8S8 A W, XI CAll 14 y 4 IgEIn asasn.n 8 a Et4g stss. t s tttE sass. / 1 n s stnE soss. 1 T 8 t t48 888810 -21 10 ols ttng 18882. ...o ft.p...m .1. [4 2 1 g tfn ;a 4E8/ 284 4 t ttt 8 ... ; 224 8 ..., 1 IS 8 ggn 888 ..,8 1 e , , in ggg 828 .,,,8 A It I. t 448 I I . - t a sttE sass. I 2 s 4844 gsa a. 'IR s nntE ssan. — a anng sasa " - ' s onta sssal I -.a na.1 ssaa I WwwWswale g ,. 4 a ttt asst. • n a nggn 8884. g 2 gggE 8881,. g 18 gggn 8884 g S 2S2 881244 fr4's BI 8 448; 8831. 6 2 8 222 888 .0. 4 8 4 4 8 8 4 4 8 2 888 • t 4. * 2 2 8 na 88 .048 TTS. , -- .. n 888 . ,,„ 1 ..N. -44 ... 888 4 I 4 , a latal I. T1 t S 18 .211 EgE 1188 2814 2 g :,m 4 8 g 8 E S 82 18 I r " C E 8 211. , ' SEN 884 t - 18 E5 888 1 • tr499 511237.21 28.482 PowdlWat NA 1..11. U mo^ammorvn,n ^^^ ^w_ N,Ha viw ^-^ ^ unmmn 8:=' vow mamo ^^g$o0 - Nmm , a«m am nan n $ nga22 v .:, eeeem eamo 0000ea eie amm,mmeeeemm mmmmmmeee 8g g a «& :,tlm S gaM$ 2 Raw md9'gm^ 1¢l0l A » w a U'^ 08888 8 7A88 8 8 � 88 8 8 nNowrewemuw.v3 g A I� 8888 8 8A8988 8,S8 88 0,q" .ssv�as SAAB s.^ 88 s mma mm ma sem mmmm mmmm mmm mm mmmmm mmmmmmmeee g88 $ .0 i888 S AAA a, ,.• »»» » -ROSA 001 '8888 8E '8888 8, n$8 88 exmowa wom FASA A�+ SAGA A ' 81 '8888 8' '$888 8 .gBR A8 woR SAAA Six ttRAA ^ 1 '8'888 83o.. 'f8888 8 A' eud'9 nnye3ma .. t AAA Aix qAAS A a 8888 8 '8888 8 II8 2$ iemr.a 8A88 A�.` gag A n mot ____ e8,dm8R83 ae.eme�men. a«m ..82.88. 8 g88 m 3S 8I S AG ,. FJ'8i 888 1 Sb 1R 8 8MA8g8�A mA » ALSO els lg " 28,1808 8 '188818 8 8 ..nMdm.w,3F.M IlB V. �A»AA A R tt ^8,588 8" ,888 8 884 MR.WWWWW0 .«« m .. m«m maamd «.. m a sag.sst,' -I m m$R8 '8 "2" '8 AA 8 ti w "8' fi mmmvson'.. wmmv 8AS azE A �8 A2 '» mN>fNY' MOnen v3 WmmW .m.....m.. mmmm««. .««. ««m m. - 8 ' 822 8 8 U 8 S it 8828 SA 'a 888 ad8 ffi-1 6S ppgp Yeeev3.ue$ 89RS G ri B 0 888 NS I' «_ « 85 88 8 7 ` '88 88 8 �Fa 8 8 8 mnunos,exa'awaa�owre 3 g i 8 A A; A D$ F 8 Fr ««««««« ««.«««.« ««««..i ««.. «.w m..888 Rk : `888' A 882 88 4erMwuaa I I i tt SA» g R . _ , »-Ar ar ,,a 8 8: A g IA 8 PROJECT FEE PROPOSAL City of National City Plaza Boulevard Widening Preliminary Design Plans, Environmental Documents and Cost Estimates Fees by Task and Person Tasks by Project Management, Preliminary Design Plans, Environmental Documents and Cost ul Estimates Amendment No. 2 8858'IS�S ;t gg8'g'g ggpp8 HB^mlb 888 / 8 &i IIM,i ,%WSMVP% NI.WM 6.LIY'L Pee.W/q11'pYPIX %IIU'L } 8�{4 !u1tuuuih:!!hhh 8a a$sx gg$ ?-.,isa �_ AnrLTwr9 rorutmr.ruxe TOTAL PROJECT HOURS OTAL CIRECT LABOR OTAL MULTIPLIERS CIRECT COSTS FEES OTAL PROJECT COST nssgs§8, is EXHIBIT "Cl" PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES NORMAL REVIEW AND REVISION PERIODS) ID Task Name Duration Stan Finish % Complete Predecessors May 1 Jun 1 Jul 1 Schedule Through Construction 1316 days, Mori 5/12/03 Mon 5/26/08 10% ' ,�kY '�`'I 2 Environmental Approval 666 days Mon 5/12/03 Mon 11/28/05 46% I 3 Caltrans Comments on Tech Studies & EMS 4 edays Mon 5/12/03 Fri 5/16/03 100% "" 100% 4 EDAW Revises Tech Studies & EA/IS 23 edays Mon 5/19/03 Wed 6/11/03 100% 3 100% 5 National City Review 14 edays Wed 6/11/03 Wed 6/25/03 100% 4 " 100% 6 EDAW Revises Tech Studies & EMS 7 edays Wed 6/25/03 Wed 7/2/03 100% 5 "" 100% 7 Caltrans Review 30 edays Wed 7/2/03 Fri 8/1/03 100% 6 8 EDAW Revises Tech Studies & EA/IS 14 edays Fri 8/1/03 Fri 8/15/03 100% 7 9 Caltrans Reviews & Approves for FHWA Submittal 7 edays Fri 8/15/03 Fri 8/22/03 100% 8 10 FHWA Review 158 edays Fri 8/22/03 Tue 1/27/04 100% 9 11 Caltrans Independent Review of FHWA comment 50 edays Tue 1/27/04 Wed 3/17/04 100% 10 12 Coordinate with Caltrans Design for Additional Traffic Studies 157 days Fri 3/12/04 Mon 10/18/04 62% 13 Meet with Caltrans Design to Determine Additional Traffic Studies 66 edays Fri 3/12/04 Mon 5/17/04 100% 14 Determine Additional Traffic Studies Required 30 edays Mon 6/21/04 Wed 7/21/04 100% 13 15 Perform Additional Traffic Studies per Caltrans Design 63 days Wed 7/21/04 Mon 10/18/04 21% 16 Provide Natioinal City with Amendment Request 19 edays Wed 7/21/04 Mon 8/9/04 100% 14 17 Receive National City NTP for Additional Traffic Studies 1 eday Mon 8/9/04 Tue 8/10/04 0% 16 18 Revise Traffic Studies for 0.5% Growth/Grove Street/Horizon Year 2030 21 edays Tue 8/10/04 Tue 8/31/04 0% 17 19 National City Review 10 edays Tue 8/31/04 Fri 9/10/04 0% 18 20 LLG Address National City Review Comments 4 edays Fri 9/10/04 Tue 9/14/04 0% 19 21 Caltrans Review 28 edays Tue 9/14/04 Tue 10/12/04 0% 20 22 LLG Address Caltrans Review Comments 6 edays Tue 10/12/04 Mon 10/18/04. 0% 21 23 EDAW Revises Tech Studies & EA/IS 16 edays Mon 10/18/04 Wed 11/3/04 0% 15 24 National. City Review 12 edays Wed 11/3/04 Mon 11/15/04 0% 23 25 EDAW Revises Tech Studies & EA/IS 7 edays Mon 11/15/04 Mon 11/22/04 0% 24 26 Caltrans Review 14 edays Mon 11/22/04 Mon 12/6/04 0% 25 27 EDAW Revises Tech Studies & EA/IS 7 edays Mon 12/6/04 Mon 12/13/04 0% 26 28 Caltrans Reviews & Approves for FHWA Submittal 7 edays Mon 12/13/04 Mon 12/20/04 0% 27 29 FHWA Review/Approval for Public Circulation 63 edays' Mon 12/20/04 Mon 2/21/05 0% 28 30 Public Review 30 edays Mon 2/21/05 Wed 3/23/05 0% 29 31 Public Meeting 0 edays Thu 3/10/05 Thu 3/10/05 0% 30SS+13 days 32 EDAW Prepares Pre iminary Final EMS 14 edays Wed 3/23/05 Wed 4/6/05 0% 30 Project: Plaza Blvd Widening Date: 8/9/04 s`f '/"'/// , //'I Baseline Milestone O Project Summary tt ° Critical Split ya Critical Split Task Progress Milestone • External Tasks ka 1 ..17--"'`' SummaryProgress Milestone Critical Progress Baseline nnM�nkm�xAlmloi�Summa ; r �, i l l l l l IIIExternal Task 1'``' ' 'y'"" "'' Split Summary ^ Deadline `j Baseline PLAZA BOULEVARD SCHEDULE Page 1 THROUGH CONSTRUCTION Schedule thru Const_10.mpp „mai LIfIHX3 PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES NORMAL REVIEW AND REVISION PERIODS) ID Task Name Duration Start Finish % Complete Predecessors May I Jun I Jul 33 National City Review 14 edays Wed 4/6/05 Wed 4/20/05 0% 32 34 EDAW Revises Preliminary Final EA/IS 7 edays Wed 4/20/05 Wed 4/27/05 0% 33 35 Caltrans Review 30 edays Wed 4/27/05 Fri 5/27/05 0% 34 36 EDAW Revises Preliminary Final EA/IS 7 edays Fri 5/27/05 Fri 6/3/05 0% 35 37 Caltrans Reviews & Approves for FHWA Submittal 10 edays Fri 6/3/05 Mon 6/13/05 0% 36 38 FHWA Review 60 edays Mon 6/13/05 Fri 8/12/05 0% 37 39 EDAW Prepares Final EA/IS 14 edays Fri 8/12/05 Fri 8/26/05 0% 38 40 National City Review 7 edays Fri 8/26/05 Fri 9/2/05 0% 39 41 EDAW Revises Final EA/IS 7 edays Fri 9/2/05 Fri 9/9/05 0% 40 42 Caltrans Review 10 edays Fri 9/9/05 Mon 9/19/05 0% 41 43 EDAW Revises Final EA/IS 4 edays Mon 9/19/05 Fri 9/23/05 0% 42 44 Caltrans Reviews & Approves for FHWA Submittal 4 edays Fri 9/23/05 Tue 9/27/05 0% 43 45 National City Signs MND 10 edays Tue 9/27/05 Fri 10/7/05 0% 44 46 FHWA Review/Approval 59 edays Tue 9/27/05 Fri 11/25/05 0% 44 47 FHWA Signs FONSI 3 edays - Fri 11/25/05 Mon 11/28/05 0% 46 48 Combined Project Study Report/Project Report (PSR/PR) 324 days Mon 8/9/04 Fri 11/4/05 0% 49 Provide Natioinal City with Amendment Request 1 eday Mon 8/9/04 Tue 8/10/04 0% 50 Receive National City NTP for Additional for PSR/PR 30 edays Tue 8/10/04 Thu 9/9/04 0% 49 51 Prepare Administrative Draft PSR/PR 42 days Thu 9/9/04 Mon 11/8/04 0% 50 52 Describe Proposal 60 edays Thu 9/9/04 Mon 11/8/04 0% 53 Describe Existing Facilities 60 edays Thu 9/9/04 Mon 11/8/04 0% 54 Discuss Environmental Status 60 edays Thu 9/9/04 Mon 11/8/04 0% 55 Provide Traffic and Accident Data 60 edays Thu 9/9/04 Mon 11/8/04 0% 56 Discuss Traffic Signals 60 edays Thu 9/9/04 Mon 11/8/04 0% 57 Discuss Non -Standard Design Features 60 edays Thu 9/9/04 Mon 11/8/04 0% 58 Discuss Impact on Utilities 60 edays Thu 9/9/04 Mon 11/8/04 0% 59 Describe Structure Construction 60 edays Thu 9/9/04 Mon 11/8/04 0% 60 Describe New of Proposed Highway Planting 60 edays Thu 9/9/04 Mon 11/8/04 0% 61 Discuss Status of Required Permits 60 edays Thu 9/9/04 Mon 11/8/04 0% 62 Describe Right of Way Requirements 60 edays Thu 9/9/04 Mon 11/8/04 0% 63 Discuss Potential Hazardous Materials 60 edays Thu 9/9/04 Mon 11/8/04 0% 64 Provide Stormwater Data Report (SWDR) 60 edays Thu 9/9/04 Mon 11/8/04 0% Project: Plaza Blvd Widening Date: 8/9/04 Critical i' /77. //r. 'I Baseline Milestone Q Project Summary Split Critical Split " " - Task Progress" ` Milestone 4. External Tasks'-`"" External Milestone Critical Progress Baseline SummaryProgress g u�ui��n_ 9 h�7iiiiiil�lit Task "—'A�1aVnr0.':'1 Summary Deadline nj Baseline Split PLAZA BOULEVARD SCHEDULE Page 2 THROUGH CONSTRUCTION Schedule thru Const_10:mpp PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES NORMAL REVIEW AND REVISION PERIODS) ID Task Name Duration Start Finish % Complete Predecessors ' May I Jun I Jul 65 Develop Attachments 42 days Thu 9/9/04 Mon 11/8/04 0% 66 Vicinity and Location Maps 60 edays Thu 9/9/04 Mon 11/8/04 0% 67 Typical Cross -Sections 60 edays Thu 9/9/04 Mon 11/8/04 0% 68 Environmental Documentation 60 edays Thu 9/9/04 Mon 11/8/04 0% I 69 Capital Cost Estimate 60 edays .. Thu 9/9/04 Mon 11/8/041 0% 70 Cooperative Agreement 60 edays Thu 9/9/04 Mon 11/8/04 0% 71 Initial Site Assessment (ISA) 60 edays Thu 9/9/04 Mon 11/8/04 0% 72 Structures Advance Planning Studies 6D edays Thu 9/9/04 Mon 11/8/04 0% 73 R/W Data Sheet 60 edays Thu 9/9/04 Mon 11/8/04 0% 74 Agency Review Administrative Draft PSR/PR 44 days Mon 11/8/04 Fri 1/7/05 0% 75 Agency Review Preliminary PSR/PR 60 edays Mon 11/8/04 Fri 1/7/05 0% 51 76 Prepare Draft PSR/PR 20 days Fri 1/7/05 Fri 2/4/05 0% 77 Respond to Agency Review of Preliminary PSR/PR 21 edays Fri 1/7/05 Fri 1/28/05 0% 74 78 Prepare Draft PSR/PR 7 edays Fri 1/28/05 Fri 2/4/05 0% 77 79 Agency Review of Draft PSR/PR 42 days Fri 2/4/05 Tue 4/5/05 0% 80 Agency Review of Draft PSR/PR 60 edays Fri 2/4/05 Tue 4/5/05 0% 76 81 Prepare Final PSR/PR 20 days Tue 4/5/05 Tue 5/3/05 0% 82 Respond to Agency Review of Draft PSR/PR 21 edays Tue 4/5/05 Tue 4/26/05 0% 79 83 Prepare Final PSR/PR 7 edays 1 Tue 4/26/05 Tue 5/3/05 0% 82 84 Agency Review Final PSR/PR 44 days Tue 5/3/05 Mon 7/4/05 0% 85 Agency Review Final PSR/PR 62 edays Tue 5/3/05 Mon 7/4/05 0% 81 86 Prepare Final Approval PSR/PR 20 days Mon 7/4/05 Mon 8/1/05 0% 87 Respond to Agency Review of Final PSR/PR 21 edays Mon 7/4/05 Mon 7/25/05 0% 84 88 Prepare Final Approval PSR/PR 7 edays Mon 7/25/05 Mon 8/1/05 0%! 87 89 Agency Review of Final Approval PSR/PR 68 days Mon 8/1/05 Thu 11/3/05 0% 90 Agency Review of Final Approval PSR/PR 60 edays Mon 8/1/05 Fri 9/30/05 0% 86 91 Respond to Agency Review of Final Approval PSR/PR 14 edays Fri 9/30/05 j Fri 10/14/05 0% 90 92 PSR/PR Approval 20 edays Fri 10/14/05 Thu 11/3/05 0% 91 - 93 -" PSR/PR Approval Date ` 1 eday Thu 11/3/05-: Frt 11/4/05 0%.. 92 94 Protect Design (Plans Specifications, and Estimate (PS&E) 326 days Fri 11/25/05 Mon 2/26/07 0% 46 95 Prepare 30% PS&E ''47 edays Fri 11/25/05 Wed 1/11/06 - ' 0/0 46 96 Submit 30% PS&E 0 edays Wed '1/11/06 Wed 1/11/06 0% 95 Project: Plaza Blvd Widening Date: 8/9/04 iq'armar�A` l'//z"iiii" ,/7? Base Milestone �roject Summary Critical Split ne LJ` ` '" ° •-"' 3 Critical Split Task Progress Milestone External Tasks °' Summary Progress External Milestone Critical Progress h i I l I I l l l l J. l l Baseline —,-. .� g r,t,Noan'+tssle LipkwnolktzogalPitml Summary Deadline Task Baseline Split PLAZA BOULEVARD SCHEDULE Page 3 THROUGH CONSTRUCTION Schedule thru Const_10.mpp l4£Qle II1IIHXI PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES NORMAL REVIEW AND REVISION PERIODS) Duration Start Finish % Complete Predecessors ID Task Name May 1 Jun 1 Jul 97 Agency Review of 30% PS&E 61 edays Wed 1/11/06 Mon 3/13/06 0%., 96 98 Respond to 30% PS&E Comments 17 edays Mon 3/13/06 Thu 3/30/06 0% 97 99 Prepare 65% PS&E 60 edays Thu 3/30/06 Mon 5/29/06 0% 98 100 Submit 65% PS&E 0 edays Mon 5/29/06 Mort 5/29/06 0% 99 101 Agency Review of 65% PS&E 60 edays Mon 5/29/06 Fri 7/28/06 0% 100 102 Respond to 6o% PS&E Comments 17 edays Fri 7/28/06 Mon 8/14/06 0% 101 103 Prepare 90% PS&E 58 edays Mon 8/14/06 Wed 10/11/06 0% 102 104 Submit 90% PS&E 0 edays Wed 10/11/06 Wed 10/11/06 0% 103 105 Agency Review of 90% PS&E 61 edays Wed 10/11/06 Mon 12/11/06 0% 104 106 Respond to 90% PS&E Comments 17 edays Mon 12/11/06 Thu 12/28/06 0°% 105 107 Prepare 100% PS&E 60 edays Thu 12/28/06 Mon 2/26/07 0% 108 108 Submit 100% PS&E 0 edays Mon 2/26/07 Mon 2/26/07 0% 107 109 Release RFP for Right of Way Acquisition Team 90 edays Sat 8/27/05 Fri 11/25/05 0°% 110SF 110 Right of Way Acquisition 390 days Fri 11/25/05 Fri 5/25/07 0% t 11 Right of Way Requirements 14 days Fri 11/25/05 Thu 12/15/05 0% 112 Coordinate with Utility Companies to Facilitate Utility Relocation 20 edays Fri 11/25/05 Thu 12/15/05 0% 46 113 Obtain Title Information for Parcels requiring Right of Way 20 edays Fri 11/25/05 Thu 12/15/05 0% 46 114 Prepare Right of Way Appraisals 46 edays Thu 12/15/05 Mon 1/30/06 0% 113,112 115 Perform Right of Way Negotiation/Acquisition Process 465 edays Mon 1/30/06 Thu 5/10/07 0% 114 116 Right of Way Acquisition Documents Complete 0 edays Thu 5/10/07 Thu 5/10/07 0% 115 117 Prepare Right of Way Certification 15 edays Thu 5/10/07 Fri 5/25/07 0% 116 118 Project Construction 261 days Fri 5/25/07 Mon 5/26/08 0% 117 119 Advertise for Construction Bids 31 edays Fri 5/25/07 Mon 6/25/07 0% 117,108 120 Award Construction Contract 30 edays Mon 6/25/07 Wed 7/25/07 0% 119 121 Contractor Mobilization 30 edays Wed 7/25/07 Fri 8/24/07 0% 120 122 Construct Project 264 edays Fri 8/24/07 Wed 5/14/08 0% 121 123 Project Completion 0 edays Wed 5/14/08 Wed 5/14/08 0% 122 124 Safety Review 12 edays Wed 5/14/08 Mon 5/26/08 0% 123 125 Project Closeout 0 edays Mon 5/26/08 Mon 5/26/08 0% 124 I' ///Y///z///,d split ' ' ' ' ' Baseline Milestone Project Summary Project: Plaza Blvd Widening Critical Critical Split Task Progress Milestone External Tasks 4'1'"'s..`z' Date: 8/9/04 - ' ` Baseline Summary Progress External Milestone Critical Progress" , .. - 11 1 1 1 L 1 . I 1 I I I I 1 i'r*'ria 4i711 4 uuai4' Baseline Split Summary Deadline Task PLAZA BOULEVARD SCHEDULE Page 4 THROUGH CONSTRUCTION Schedule thru Const_10.mpp City of National City Office of the City Clerk 1243 National City Boulevard, National City, California 91950-4397 Michael R. Dalla, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 September 17, 2004 Mr. Kirk Bradbury, Project Manager Dokken Engineering 9665 Chesapeake Drive Ste 435 San Diego CA 92123 Dear Mr. Bradbury, On September 7, 2004, Resolution No. 2004-171 by the City Council of the City of National City, execute Supplemental Agreement No. Two with $123,388. We are forwarding a certified copy of the above executed original Supplemental Agreement. Sincerely, �l A Michael R. Dalla, CMC City Clerk MRD/mla Enclosure cc: Public Works/Engineering File No. C2002-21 was passed and adopted authorizing the Mayor to Dokken Engineering for Resolution and one fully EA Recycled Paper City of National City, California COUNCIL AGENDA STATEMENT Czooz-Z I MEETING DATE September 7, 2004 AGENDA ITEM NO. 7 ITEM TITLE A Resolution of the City Council of the City of National City approving supplemental agreement with Number Two with Dokken Engineering for $123,388 to provide additional engineering services for the Plaza Boulevard project, which includes street vehicular capacity improvements and livability enhancement through median landscaping, sidewalk improvements, street lighting, etc. in the vicinity of the Filipino Village and the Interstate 805 intersection. PREPARED BY Din Daneshfar DEPARTMENT Public Works/Engineering EXPLANATION 336-4386 See Attached Explanation ( Environmental Review X N/A • Financial Statement Approved By: This amount of the Supplemental Agreement No. Two is $123,388. Finance vector Funding is available through Account Nos. 312-409-500-598-6569 and 307-409-500-598-6569. Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below L._ 1. Resolution Resolution No. 2DO 1- /7 j 2. Proposed Supplemental Agreement No. Two A-200 (9/99) RE: A Resolution of the City Council of the City of National City approving supplemental agreement with Number Two with Dokken Engineering for $123,388 to provide additional engineering services for the Plaza Boulevard project, which includes street vehicular capacity improvements and livability enhancement through median landscaping, sidewalk improvement and street lighting, etc. in the vicinity of the Filipino village and the Interstate 805 intersection. On April 16, 2002, a contract was awarded to Dokken Engineering for providing professional services regarding the Capacity Improvements on Plaza Boulevard from Highland Avenue to Euclid Avenue, Specification No. 99-9 for the amount at $309,701. On January 7, 2003, the Supplemental Agreement Number One was approved to prepare additional parking analysis and floodplain study along Plaza Boulevard for the amount at $14,148. This is Supplemental Agreement Number Two to the original contract agreement between the City of National City and Dokken Engineering, the consultant, to provide additional civil engineering services. The major components of the extended project scope is due to recent requests from the California Department of Transportation (Caltrans) for additional information that is required by Caltrans Design Section after the review process was completed. Minor changes are also needed on the street design plans in order to accommodate the City's current Community/Private Development projects along Plaza Boulevard. This supplemental agreement provides for an additional not -to -exceed amount at $123,388 for: 1) Providing additional Coordination with Caltrans Design Section 2) Preparation of a Project Study Report/Project Study (PSR/PR) to Meet the Caltrans Request 3) Revision of Traffic Study to Meet the Caltrans Request 4) Updating of the Environmental Documents to Meet the Caltrans Request 5) Providing Filipino Village Project Coordination to Meet Community Development Improvements along Plaza Boulevard 6) Providing a Geometrical Adjustment to the Street Design in order to Accommodate a Private Development Project 7) Providing SANDAG Progress Reports and Status Meetings 8) Providing Project Management during Extended Contract Duration 9) Revision of Schedule and Billing Rates Details of the extended scope of work, cost estimates, and schedules for this supplemental agreement are included in the attached Exhibit "A". The proposed cost to complete this work is $123,388 which will increase the total contract amount to $447,237. RESOLUTION NO. 2004 —171 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE SUPPLEMENTAL AGREEMENT NO. TWO WITH DOKKEN ENGINEERING FOR $123,388 TO PROVIDE ADDITIONAL ENGINEERING SERVICES FOR THE PLAZA BOULEVARD PROJECT, WHICH INCLUDES STREET VEHICULAR CAPACITY IMPROVEMENTS AND LIVABILITY ENHANCEMENT THROUGH MEDIAN LANDSCAPING, SIDEWALK IMPROVEMENTS, STREET LIGHTING, ETC., IN THE VICINITY OF THE FILIPINO VILLAGE AND INTERSTATE 805 INTERSECTION WHEREAS, on April 16, 2002, the City Council adopted Resolution No. 2002-52 authorizing an agreement with Dokken Engineering for professional engineering services for the Plaza Boulevard Project, which includes street vehicular capacity improvements and livability enhancement through median landscaping, sidewalk improvements, street lighting, etc., in the vicinity of the Filipino Village and Interstate 805 intersection; and WHEREAS, as a supplement of the original agreement, the Engineering Department desires to extend the scope of work for Dokken Engineering for $123,388 to provide the following: • Coordination with Caltrans Design • Filipino Village Project coordination • Adjustment of project geometrics per Public Works request • SANDAG progress reports and status meetings • Project management during extented project duration • Production of a Project Study Report/Project Study • Revision of billing rates • Revision of Plaza Boulevard Traffic Study • Update of Environmental Document NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute a supplemental agreement with Dokken Engineering to provide additional engineering services for $123,388 for the Plaza Boulevard Project, which includes street vehicular capacity improvements and livability enhancement through median landscaping, sidewalk improvements, street lighting, etc., in the vicinity of the Filipino Village and Interstate 805 intersection. Said Agreement is on file in the office of the City Clerk. PASSED AND ADOPTED this 7th day of September, 2004. ATTEST: APPROVED AS TO FORM: 7jjf' Mich I Dalla, Ci Clerk r e H. iser, III City Attorney 9 Passed and adopted by the Council of the City of National City, California, on September 7, 2004, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California C Clerk of the Ci of National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-171 of the City of National City, California, passed and adopted by the Council of said City on September 7, 2004. City Clerk of the City of National City, California By: Deputy